Permit Information
Permit NumberBLD17-02323
StatusFinaled
Name MARK GUHO CONSTRUCTION COMPANY
Site Address 5390 W IRVING ST
Project NameMark Guho Construction Company
Customer NumberGRD16-00088/ESC16-01706
ePlanReviewYes
Description
(MARK GUHO CONSTRUCTION COMPANY)(DRH16-00273)**Permit for the construction of a new 8,476 sq. ft. pre-engineered shell storage building and related site improvements. Scope of work includes: construction of slab on grade concrete foundation, pre-engineered shell with insulation, mezzanine with stairs and guardrail, interior non-bearing walls, restroom, electrical, mechanical, plumbing, and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. All work shall comply with the approved plans, DRH16-00273 and all applicable codes. This building is NOT Fire Sprinklered. Note: Special Inspections Required, see form 310. Note: complies with ANSI/ASHREA 90.1. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  8/15/2019 DONE
Emailed Mark Guho asking him for clarification on mechanical and plumbing values.
Third Notice 7/15/20198/13/2019 DONE
mailed 8-13 with second follow up
Second Follow up  8/13/2019 DONE
Third Notice 6/12/20197/10/2019 DONE
mailed 7-11 with first follow up
First Follow up  7/10/2019 DONE
Third Notice 5/11/20196/7/2019 DONE
mailed 6-10
Third Notice 4/13/20195/6/2019 DONE
mailed 5-10-19
Second Notice 3/21/20194/8/2019 DONE
mailed 4/11
First Notice 2/22/20193/11/2019 DONE
mailed 3-12-19
PubWorks Occupancy Approval2/12/20192/12/20192/12/2019 DONE
DetailsTiffany Lowery
Permanent Occupancy  2/12/2019 DONE
BLD-Final2/8/20192/11/20192/11/2019APASS
DetailsJim Sly
Nate Phone #: ###-####
Zoning Approval2/11/20192/11/20192/11/2019 PASS
DetailsKatelyn Menuge
FIRE-Final Inspection2/7/20192/8/20192/8/2019APASS
DetailsTroy Cobbley
life safety passed

Nate Phone #: ###-####
Print Occupancy Form  2/7/2019 DONE
BLD-Final2/5/20192/6/20192/6/2019ACANC
DetailsJim Sly
Nate Phone #: ###-####
FIRE-Final Inspection2/5/20192/5/20192/5/2019PFAIL
DetailsTroy Cobbley
Need the Grading permit finaled, provide address as discussed and provide an additional fire extinguisher on the Mezzanine.

Nate Phone #: ###-####
BLD-Framing/Rough-in12/19/201812/20/201812/20/2018APART
DetailsJim Sly
nate Phone #: ###-####
Interior walls.....OK
FIRE-Conference11/13/201811/13/201811/13/2018PDONE
DetailsMike Jordan
As early as possible Phone #: 2089579827 >> Inspection requested via mobile web by Nate Bohachek. Discussed main entry gate. Gate has 30ft clear opening and is powered. It will require an opticon. aslo noted adjacent man gate will require passage hardware to exit.
BLD-Framing/Rough-in8/31/20189/4/20189/4/2018APART
DetailsJim Sly
Nate Phone #: ###-####
Main structure appears OK..... Mezzanine not built yet. MTI doing special inspections.
Issue PAID IN FULL permit  11/30/2017 DONE
Print Occupancy Form  11/30/2017 DONE
Routing - FIRE11/13/201711/13/201711/28/2017 PASS
DetailsScott Arellano
Attached comments to case
Plan assigned to (JAR)9/20/20179/20/201711/28/2017 DONE
DetailsJulie Romig
**1st Rev Comp - 2nd Rec'd 11/08 - 502 Mark Guho Warehouse (new bldg)
PLANS/APPL TAKEN TO FRONT DESK  11/28/2017 DONE
Permit Ready to Issue  11/28/2017 DONE
DetailsChristina Prado
Need
ACHD - MET
GC Form - Met
Cert of Value - Met
Routing Off Site - STRUCTURAL11/13/2017 11/20/2017 PASS
DetailsJulie Romig
2nd Review
Routing - Design Review11/13/2017 11/20/2017 PASS
DetailsKatelyn Menuge
2nd Review
Routing - PLAN CHECK11/8/2017 11/20/2017 PASS
DetailsJulie Romig
2nd Review
Route to Impact Fee Review10/26/201710/29/201710/27/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  10/26/2017 FAIL
DetailsJulie Romig
Routing - PLAN CHECK9/20/2017 10/26/2017 FAIL
DetailsJulie Romig
See ePlanReview for required corrections.
Routing - PUBLIC WORKS9/20/2017 10/25/2017 PASS
DetailsRachael Beierle
Routing PW Drainage9/20/2017 10/25/2017 PASS
DetailsBrian Murphy
Routing Off Site - STRUCTURAL9/20/2017 10/2/2017 FAIL
DetailsJulie Romig
See ePlanReview for required corrections.
Routing - FIRE9/20/20179/20/20179/26/2017 FAIL
DetailsScott Arellano
Attached comments and emailed architect corrections needed
Routing PW Environmental9/20/2017 9/25/2017 PASS
DetailsRick Christenson
Routing PW Sewer Design9/20/2017 9/22/2017 PASS
DetailsKyle S. Rosenmeyer
Routing - PLANNING Land Div9/20/2017 9/22/2017 PASS
DetailsTodd Tucker
Routing - Erosion and Sediment9/20/2017 9/21/2017 PASS
DetailsAndy J. Long
ESC permit for project already issued with grading permit, see ESC16-01706. No additional ESC permit required
Intake Approval  9/20/2017 PASS
Routing - Addressing9/20/2017 9/20/2017 PASS
DetailsDoug Chausow
Routing - Design Review9/20/2017 9/20/2017 FAIL
DetailsKatelyn Menuge
See Landscape Plan and Lighting Cover
Routing - MECHANICAL9/20/2017 9/20/2017 PASS
DetailsTroy James
Routing - PLUMBING9/20/2017 9/20/2017 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - PLANNING9/20/2017 9/20/2017 PASS
DetailsCody Riddle
Approved by DR.
Routing PW Street Lights9/20/2017 9/20/2017 PASS
DetailsTom Marshall
Routing PW Solid Waste9/20/2017 9/20/2017 PASS
DetailsEvan Carpenter
Routing PW Sewer Rating9/20/2017 9/20/2017 PASS
DetailsMorgan Webb
Plan Reviewer's activity  9/18/2017 PASS
Plan intake approved
Intake Approval  9/16/2017 FAIL
(9-16-17) Please refer the circled items in the plan review report. Please resolve each item as directed. Those with an "OK" in the circle have been resolved. CJW
Intake Approval  8/29/2017 FAIL
(8-29-17) Please refer the circled items in the plan review report. Please resolve each item as directed. CJW
Application received  7/11/2017 DONE
Application submitted via PDS Online on Jul 11 2017 12:03PM