Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD17-02348
StatusIssued
Name DOW DANIEL
Site Address 2017 S RIDGE POINT WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI - Permit for a remodel that includes: removing bearing walls on the upper level, remodeling the kitchen, remodeling the master bath, adding washer and dryer to the master closet, redoing the decking (hoover treated) and guardrail (cable-rail system). All work per plans, notes, engineering & local code. Separate electrical, plumbing, and mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/15/20186/15/20186/21/2018 PEND
DetailsBrandon Shaw
Work in progress
BLD-Framing/Rough-in11/6/201711/7/201711/7/2017ACANC
DetailsBrandon Shaw
Pending Mech rough in
OK to insulate/foam seal
OK to cover
Routing Walk-In (BLD)10/10/201710/10/201710/10/2017APASS
DetailsJosh Bogle
quesions about adding bonus room to scope of work
BLD-Conference10/2/201710/3/201710/3/2017AFAIL
DetailsBrandon Shaw
Left correction notice- Unit of lumber blocking public easement- Rermove from sidewalk
(F) Reprint permit  8/2/2017 DONE
Routing Walk-In (BLD)7/31/20177/31/20177/31/2017ADONE
DetailsJosh Bogle
Routing - PLAN CHECK7/31/2017 7/31/2017 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  7/31/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  7/31/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  7/31/2017 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  7/31/2017 DONE
Issue PAID IN FULL permit  7/31/2017 DONE
Routing Walk-In (BLD)7/13/20177/13/20177/13/2017PFAIL
DetailsJosh Bogle
needed more information
Routing - PLAN CHECK7/13/2017 7/13/2017 FAIL
DetailsJosh Bogle
1st review completed  7/12/2017 FAIL
DetailsJosh Bogle
Application received 7/12/2017