Second Notice | | 10/22/2017 | 10/18/2017 | | DONE |
|
|
|
This permit finaled on the web by Alex Taylor
|
First Notice | 10/2/2017 | 10/2/2017 | 10/12/2017 | | DONE |
Jim Sly
|
|
|
Mailed 10-13-17
|
BLD-Final | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Jim Sly
|
|
|
OK for Occ.
|
FIRE-Final Inspection | 9/29/2017 | 10/2/2017 | 10/2/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 9/26/2017 | 9/27/2017 | 9/27/2017 | A | NR |
Jim Sly
|
|
|
(infront of the cell tower) need to call for access, or ring doorbell // Randy Westbrook Phone #: ###-#### Need all Required finals.
|
FIRE-Final Inspection | 9/26/2017 | 9/26/2017 | 9/26/2017 | P | FAIL |
Troy Cobbley
|
|
|
No formal inspection performed due to no city approved plans or small documents. Also a fire alarm permit is required for work needed.
Randy Westbrook Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/11/2017 | 9/12/2017 | 9/12/2017 | P | PASS |
Jim Sly
|
|
|
Randy Phone #: ###-####
|
BLD-Framing/Rough-in | 8/16/2017 | 8/16/2017 | 8/17/2017 | P | PASS |
Jim Sly
|
|
|
Have to ring a door bell to be let in call half hour before // Randy Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/15/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/15/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 7/31/2017 | 7/31/2017 | 8/7/2017 | | PASS |
Javier Guzman
|
|
|
8/04 L1 VzW Boise, ID Office Remodel
|
Routing - PLAN CHECK | 7/31/2017 | | 8/7/2017 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 8/7/2017 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/7/2017 | | DONE |
Christina Prado
|
|
|
Need GC form & Revised Certificate of Value for issuance
|
Routing - Addressing | 7/31/2017 | | 8/2/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/31/2017 | | 8/1/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 7/31/2017 | | PASS |
Javier Guzman
|
|
|
|
Plan Modification Accepted | | | 7/25/2017 | | FAIL |
Julie Romig
|
|
|
Need:
1. Code Analysis on drawings with the following information:
- Applicable Codes with Code Year (see Currently Enforced Building Codes on City of Boise website)
- Occupancy Group
- Land Use Zone
- Construction Type
- Tenant Area
- Fire Suppression System
- Fire Alarm
|
Intake Approval | | | 7/13/2017 | | FAIL |
Julie Romig
|
|
|
Need:
1. Completed Form 518 Submittal Checklist and any additional information has required by checklist.
2. Form 304 Registered Design Professional.
3. Upload drawing sheets as individual PDF files. Files should be named per City of Boise naming conventions (sheet number and brief description - TS001_Title Sheet).
4. Stamp/signature is missing from drawings.
5. Code Analysis (see checklist for required information.
|
Application received | | | 7/12/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 12 2017 4:05PM
|