BLD-Conference | 9/30/2019 | 10/4/2019 | 10/3/2019 | A | CANC |
Tell Riley
|
|
|
Cesar Phone #: ###-####//check on blower door results///CO was issued//
|
BLD-Blower Door Test Results | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | DONE |
Tell Riley
|
|
|
3.76 ACH 50 839 CFM @ 50 PA
|
BLD-Final | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Tell Riley
|
|
|
CESAR Phone #: ###-####
|
DOC - Permit Finaled | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PART |
Tell Riley
|
|
|
Cesar Phone #: ###-####//dweling is complete//life safety and trades all signed off//cesar will get blower door results and call back in for final//
|
BLD-Aging Inspection | 6/11/2019 | 6/11/2019 | 6/13/2019 | | DONE |
Tell Riley
|
|
|
Expires: 07/27/19
|
BLD-Aging Inspection | 6/12/2019 | 6/12/2019 | 6/12/2019 | | DONE |
Tell Riley
|
|
|
Expires: 07/27/19
|
BLD-Energy code compliance | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to cover...
|
BLD-Framing/Rough-in | 1/18/2019 | 1/18/2019 | 1/22/2019 | P | PASS |
Jim Sly
|
|
|
Cesar Phone #: ###-####
|
Inspection Record Card- Bld | | | 1/18/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/24/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 8/24/2018 | | 8/24/2018 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 8/17/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Jim Sly
|
|
|
Cesar Phone #: ###-####
|
BLD-Framing/Rough-in | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | NR |
Jim Sly
|
|
|
Araujo Phone #: ###-#### Need all trade R/I approvals
|
Issue PAID IN FULL permit | | | 8/16/2017 | | DONE |
|
|
|
|
Telephone call | | | 8/15/2017 | | DONE |
|
|
|
called Cesar to let know permit permit is ready
|
OVERRIDE | | | 8/14/2017 | | |
|
|
|
|
Case Summary (BLD) | | | 8/14/2017 | | DONE |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 8/14/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2017 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 8/14/2017 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 8/11/2017 | | 8/14/2017 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 7/21/2017 | | 8/14/2017 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 8/14/2017 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 7/17/2017 | 7/17/2017 | 8/11/2017 | | DEFR |
Brian McGowan
|
|
|
7/28 sfd paper
|
Plan Reviewer's activity | | | 8/11/2017 | | DONE |
Michael Hanson
|
|
|
|
Routing - MECHANICAL | 7/28/2017 | | 7/28/2017 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 7/18/2017 | | 7/21/2017 | | FAIL |
Troy James
|
|
|
emailed corrections to TML
|
Routing - PLANNING | 7/18/2017 | | 7/18/2017 | | PASS |
Jeff Lowe
|
|
|
existing foundation - verify two paved parking spaces located outside of setbacks measuring 2-FT long and 20FT wide.
|
Routing - Addressing | 7/17/2017 | | 7/18/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/17/2017 | | 7/18/2017 | | PASS |
Rachael Beierle
|
|
|
REPLACING SFD. SWR16-00966 ISSUED. LOT IS ALREADY BILLING.
|
Plans ACCEPTED BY PLAN TECH | | | 7/17/2017 | | DONE |
|
|
|
The foundation for this home was done under BLD16-03130 and approved on 10/26/16 for a manufactured home. Customer requested we void the permit for the MH in order to build a stick built home under this permit.
|
Intake Approval | | | 7/17/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/17/2017 | | DONE |
|
|
|
|
Intake Approval | | | 7/13/2017 | | FAIL |
|
|
|
(Came in close to 5pm 7-12) Missing two small site plans and site plan on the set of plans
|
Application received | | 7/12/2017 | | | |
|
|
|
|