BLD-Final | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | PASS |
Brandon Shaw
|
|
|
Give me 30 minutes notice please so I can meet you there thank you Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 4/10/2018 | 4/10/2018 | 4/10/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 12/1/2017 | 12/4/2017 | 12/4/2017 | A | PASS |
Brandon Shaw
|
|
|
OK to cover
|
BLD-Framing/Rough-in | 12/1/2017 | 12/4/2017 | 12/4/2017 | A | PASS |
Brandon Shaw
|
|
|
Corrections sat.
|
BLD-Framing/Rough-in | 11/29/2017 | 11/30/2017 | 11/30/2017 | A | FAIL |
Brandon Shaw
|
|
|
See correction notice
OK to Insulate
|
BLD-Framing/Rough-in | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
Plan Modification Accepted | | | 11/28/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 11/28/2017 | | 11/28/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 11/7/2017 | 11/8/2017 | 11/9/2017 | P | PASS |
Brandon Shaw
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Foundation | 9/22/2017 | 9/25/2017 | 9/25/2017 | A | PASS |
Brandon Shaw
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Footing | 9/15/2017 | 9/18/2017 | 9/18/2017 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
PubWorks Subgrade Approval | 9/18/2017 | 9/18/2017 | 9/18/2017 | | DONE |
Jason C. Taylor
|
|
|
|
PubWorks Subgrade Approval | 9/18/2017 | 9/18/2017 | 9/18/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 9/14/2017 | 9/15/2017 | 9/15/2017 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
|
OVERRIDE | | | 9/8/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 7/13/2017 | 7/13/2017 | 9/8/2017 | | DONE |
Brian McGowan
|
|
|
8/01 sfd Level 2 paper
|
Routing - PLAN CHECK | 8/4/2017 | | 9/8/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/8/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/8/2017 | | DONE |
|
|
|
All Met
|
Inspection Record Card- Bld | | | 9/8/2017 | | DONE |
|
|
|
|
Telephone call | | | 9/8/2017 | | DONE |
|
|
|
called Bryan to let know permit is ready and how much is owed-left message on his cell
|
Issue PAID IN FULL permit | | | 9/8/2017 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 9/6/2017 | | DONE |
|
|
|
resubmittals recieved 2 of each sheet S-110, S-109, S--108, S-107, S-106, S-105, S-104, S-103, S-101, A-103 & 2 engineered struc calcs-took to Brian MacGowan
|
1st review completed | | | 8/30/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering for tile roof, foundation issues
|
Routing - PLAN CHECK | 7/20/2017 | | 8/30/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering for tile roof, foundation issues
|
Routing - FIRE | 8/3/2017 | 7/13/2017 | 8/4/2017 | | PASS |
Scott Arellano
|
|
|
This building has been evaluated for FD vehicle access and water supply proximity.
|
Routing - Erosion and Sediment | 8/3/2017 | | 8/3/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan with site narrative approved. Valid RP and PD designated. Site preparation inspection required.
|
Routing PW Grading-Hillside | 7/25/2017 | | 7/25/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 7/25/2017 | | 7/25/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Sewer Rating | 7/25/2017 | | 7/25/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 7/18/2017 | | 7/20/2017 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 7/20/2017 | | DONE |
|
|
|
Three copies of sheet C1. Taken to Brian Mc - took to JCT 7/20
|
Routing - PLANNING | 7/18/2017 | | 7/18/2017 | | PASS |
Jeff Lowe
|
|
|
|
Routing PW Grading-Hillside | 7/13/2017 | | 7/18/2017 | | FAIL |
Jason C. Taylor
|
|
|
See email dated 7/18/2017 JCT
|
Route to Impact Fee Review | 7/13/2017 | 7/16/2017 | 7/14/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Sewer Rating | 7/13/2017 | | 7/13/2017 | | FAIL |
Rachael Beierle
|
|
|
see JCT in hillside.
|
Routing - Addressing | 7/13/2017 | | 7/13/2017 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/13/2017 | | DONE |
|
|
|
|
Intake Approval | | | 7/13/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/13/2017 | | DONE |
|
|
|
|
Application received | | 7/13/2017 | | | |
|
|
|
|