BLD-Final | 9/6/2017 | 9/7/2017 | 9/7/2017 | A | PASS |
Dave Hannah
|
|
|
George Phone #: ###-####
|
DOC - Permit Finaled | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Foundation | 7/31/2017 | 7/31/2017 | 7/31/2017 | P | PASS |
Jim Storey
|
|
|
George Phone #: ###-####
|
Routing Walk-In (Zoning) | 7/17/2017 | 7/17/2017 | 7/17/2017 | A | PASS |
Jeff Lowe
|
|
|
verified that existing carport has been removed via CVA17-00030
|
Routing Walk-In (BLD) | 7/17/2017 | 7/17/2017 | 7/17/2017 | A | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 7/17/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/17/2017 | | DONE |
|
|
|
|
Routing - FRONT DESK | 7/17/2017 | | 7/17/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/17/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/17/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | DONE |
Sue Cummings
|
|
|
He will come back later when existing carport is removed
|
Routing Walk-In (BLD) | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | FAIL |
Josh Bogle
|
|
|
beautifully engineered carport that will pass easily as soon as the conditions of the variance are met JAB
|
1st review completed | | | 7/13/2017 | | DONE |
Josh Bogle
|
|
|
|
Application received | | 7/13/2017 | | | |
|
|
|
|