Second Notice | | 6/21/2018 | 6/20/2018 | | DONE |
|
|
|
This permit finaled on the web by Charlene Meadows
|
First Notice | | 5/13/2018 | 6/11/2018 | | DONE |
|
|
|
mailed 6-12
|
BLD-Final | 5/2/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Mike Jordan
|
|
|
Will Phone #: ###-####. OK for perm occ.
|
Permanent Occupancy | | | 5/3/2018 | | DONE |
|
|
|
|
BLD-Final | 4/30/2018 | 5/1/2018 | 5/1/2018 | P | PART |
Mike Jordan
|
|
|
Bill Phone #: ###-####. Ok for temp occ. Needs to provide 20 min rated doors at sleeping rooms.
|
FIRE-Final Inspection | 4/30/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Bill Phone #: ###-####
|
PubWorks Occupancy Approval | 5/1/2018 | 5/1/2018 | 5/1/2018 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 4/30/2018 | 4/30/2018 | 4/30/2018 | | DONE |
Katelyn Menuge
|
|
|
|
FIRE-Final Inspection | 4/25/2018 | 4/26/2018 | 4/26/2018 | P | FAIL |
Troy Cobbley
|
|
|
No small documents on site, no address, generator had not been commissioned yet. Door hardware appears ok.
bill Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/23/2018 | 3/26/2018 | 3/26/2018 | A | PASS |
Mike Jordan
|
|
|
Bill Phone #: ###-####
|
BLD-Wall Bracing | 2/8/2018 | 2/9/2018 | 2/9/2018 | A | CANC |
Mike Jordan
|
|
|
Concrete at 10:45 // Bill Phone #: ###-####
|
BLD-Footing | 2/6/2018 | 2/7/2018 | 2/7/2018 | A | PASS |
Mike Jordan
|
|
|
Bill Phone #: ###-####. Footing for generator enclosure.
|
BLD-Energy code compliance | 2/7/2018 | 2/7/2018 | 2/7/2018 | A | PASS |
Mike Jordan
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 1/30/2018 | 2/1/2018 | 2/1/2018 | A | PASS |
Mike Jordan
|
|
|
Bill Phone #: ###-####. roof ok. Interior wood framed walls, shearwalls and roof joist ok. ok to insulate.
|
BLD-Wall Bracing | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | PASS |
Mike Jordan
|
|
|
Bill Phone #: ###-####. Exterior and Interior shear walls.
|
BLD-Other | 1/2/2018 | 1/2/2018 | 1/2/2018 | P | PART |
Mike Jordan
|
|
|
Masonary/structural steel - Bill Phone #: ###-####. 4ft. to 8ft. elevation on interior non bearing CMU wall.
|
BLD-Other | 12/19/2017 | 12/20/2017 | 12/20/2017 | A | DEFR |
Mike Jordan
|
|
|
late AM ealy PM // structural steel and masonry, MTI is inspecting too // Bil Tonkin Phone #: ###-####. Special inspector on site.
|
BLD-Other | 12/18/2017 | 12/19/2017 | 12/19/2017 | A | CANC |
Mike Jordan
|
|
|
late AM ealy PM // structural steel and masonry, MTI is inspecting too // Bil Tonkin Phone #: ###-####. Cancelled by contractor via phone call.
|
BLD-Other | 12/15/2017 | 12/18/2017 | 12/18/2017 | A | DEFR |
Mike Jordan
|
|
|
pour at 10 // Bill Phone #: ###-####. Special inspector on site.
|
BLD-Other | 12/13/2017 | 12/14/2017 | 12/14/2017 | A | PART |
Mike Jordan
|
|
|
Steal and CMU block (MTI) ..... Late morning please // Bill Phone #: ###-####. Work in progress on perimeter walls from 4ft. to 8ft. elevation. Speciial inspector will be on site at time of grout placement.
|
BLD-Concrete | 12/12/2017 | 12/13/2017 | 12/13/2017 | A | CANC |
Brandon Shaw
|
|
|
rebar - late morning - Bill Phone #: ###-####
|
BLD-Foundation | 11/7/2017 | 11/8/2017 | 11/8/2017 | A | PART |
Mike Jordan
|
|
|
Rebar stem wall... pour at 2 // Bill Phone #: ###-####. Work in progress on interior footings and perimeter sremwalls. ok to place concrete after special inspection has pssed.
|
BLD-Foundation | 11/1/2017 | 11/3/2017 | 11/3/2017 | A | CANC |
Mike Jordan
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 11/3/2017 | 11/3/2017 | 11/3/2017 | A | PART |
Mike Jordan
|
|
|
Bill Phone #: ###-####. Work in progress on perimeter footings. Will have special inspections.
|
Issue PAID IN FULL permit | | | 10/27/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/27/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/25/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 8/11/2017 | 8/11/2017 | 10/25/2017 | | PASS |
Carl D Madsen
|
|
|
Ada County Paramedics
|
Routing - PLAN CHECK | 10/12/2017 | | 10/25/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 10/12/2017 | | 10/25/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2017 | | DONE |
|
|
|
|
Routing - MECHANICAL | 10/25/2017 | | 10/25/2017 | | PASS |
Troy James
|
|
|
|
Permit Ready to Issue | | | 10/25/2017 | | DONE |
|
|
|
MET
Need :
ACHD
Met
RP
Revised Cert of Value
GC Form
|
Route to Impact Fee Review | 9/29/2017 | 10/2/2017 | 9/29/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 9/28/2017 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 8/11/2017 | | 9/28/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 8/11/2017 | | 9/28/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Environmental | 8/14/2017 | | 9/15/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - FIRE | 8/11/2017 | 8/11/2017 | 8/24/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing PW Drainage | 8/14/2017 | | 8/24/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING Land Div | 8/11/2017 | | 8/18/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Street Lights | 8/14/2017 | | 8/16/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - PUBLIC WORKS | 8/11/2017 | | 8/14/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 8/11/2017 | | 8/14/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative and site map provided. Valid PD, RP to be determined with contract award. Site preparation inspection is required.
|
Routing PW Solid Waste | 8/14/2017 | | 8/14/2017 | | PASS |
Evan Carpenter
|
|
|
Approved for commercial solid waste cart service.
|
Routing PW Sewer Design | 8/14/2017 | | 8/14/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - MECHANICAL | 8/11/2017 | | 8/14/2017 | | FAIL |
Troy James
|
|
|
Talked to engineer.
|
Routing - PLUMBING | 8/11/2017 | | 8/11/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - PLANNING | 8/11/2017 | | 8/11/2017 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - Design Review | 8/11/2017 | | 8/11/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00268
|
Intake Approval | | | 8/11/2017 | | PASS |
|
|
|
|
Routing - Addressing | 8/11/2017 | | 8/11/2017 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 8/10/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
• Please provide a “Shallow Injection Well Inventory” form from the Idaho Department of Water Resources available at: http://www.idwr.idaho.gov/wells/shallow-injection-wells.html
|
Application received | | | 7/13/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 13 2017 2:29PM
|