BLD-Final | 11/27/2017 | 11/27/2017 | 11/27/2017 | P | PASS |
Mike Jordan
|
|
|
Jerry Phone #: ###-####
|
DOC - Permit Finaled | 11/27/2017 | 11/27/2017 | 11/27/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 8/11/2017 | 8/11/2017 | 8/11/2017 | P | PASS |
Mike Jordan
|
|
|
Jerry Phone #: ###-####. Pending electrical rough in inspection.
|
BLD-Conference | 7/25/2017 | 8/2/2017 | 8/2/2017 | A | PASS |
Mike Jordan
|
|
|
Check on status.
|
BLD-Conference | 7/25/2017 | 7/26/2017 | 7/26/2017 | A | DONE |
Mike Jordan
|
|
|
|
BLD-Conference | 7/25/2017 | 7/26/2017 | 7/25/2017 | A | DONE |
Mike Jordan
|
|
|
Spoke with owners. They have floor pland and will submit for building permit. A reinspection has been scheduled for 8-2-17 to check on status.
|
CHANGE STATUS TO (ISS) | | | 7/20/2017 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 7/13/2017 | 7/14/2017 | 7/14/2017 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 7/14/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/14/2017 | | 7/14/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/14/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/14/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/14/2017 | | DONE |
Brian McGowan
|
|
|
|
Issue PAID IN FULL permit | | | 7/14/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/14/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | PASS |
Josh Bogle
|
|
|
applicant left before review (lat in the day) - took in as a level 2
|
Application received | | 7/13/2017 | | | |
|
|
|
|