BLD-Final | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Brandon Shaw
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 4/12/2019 | 4/12/2019 | 4/12/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Conference | 9/28/2018 | 9/28/2018 | 9/28/2018 | A | DEFR |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Aging Inspection | 9/28/2018 | 9/28/2018 | 9/28/2018 | | DEFR |
Brandon Shaw
|
|
|
|
BLD-Other | 6/14/2018 | 6/14/2018 | 6/14/2018 | P | PASS |
Brandon Shaw
|
|
|
Eric---soffit inspection Phone #: ###-####
|
BLD-Energy code compliance | 5/16/2018 | 5/17/2018 | 5/17/2018 | A | PASS |
Brandon Shaw
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Wall Bracing | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 5/8/2018 | 5/9/2018 | 5/9/2018 | A | CANC |
Brandon Shaw
|
|
|
Eric Phone #: ###-####
|
BLD-Foundation | 1/31/2018 | 2/1/2018 | 2/1/2018 | A | PASS |
Brandon Shaw
|
|
|
Ready as of yesterday. Would like to pour mid morning if that works Please call Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
Brandon Shaw
|
|
|
Request early inspection Phone #: ###-#### Inspection requested via web by Ben Sears
|
PubWorks Subgrade Approval | 1/29/2018 | 1/29/2018 | 1/29/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 12/14/2017 | 12/14/2017 | 12/14/2017 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Footing | 11/15/2017 | 11/15/2017 | 11/15/2017 | A | PART |
Brandon Shaw
|
|
|
Phase I, footings
Exterior Column footings at a later time
|
BLD-Footing | 11/15/2017 | 11/15/2017 | 11/15/2017 | A | CANC |
Brandon Shaw
|
|
|
request inspection around 11 Phone #: ###-#### Inspection requested via web by Ben Sears
|
PubWorks Subgrade Approval | 10/6/2017 | 10/6/2017 | 10/6/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 10/5/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/2/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 7/17/2017 | 7/17/2017 | 10/2/2017 | | DONE |
Brian McGowan
|
|
|
1st review pending Mechanical. Deck details for WUI, verify retaining wall location at Garage, Light penetration at WUI soffit. - 8/03 sfd Level 2 paper
|
Routing - PLAN CHECK | 10/2/2017 | | 10/2/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/2/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/2/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/2/2017 | | DONE |
|
|
|
|
Telephone call | | | 10/2/2017 | | DONE |
|
|
|
called Eric-left message-permit is ready and how much is owed
|
Plan resubmittals received | | | 9/29/2017 | | DONE |
Christina Prado
|
|
|
Receive two sets of revised foundation plan; taken to BJM for review
|
Plan resubmittals received | | | 9/27/2017 | | DONE |
|
|
|
resubmittals received 2 sheets labeled 2 of 18 & 2 sets of struc calcs-took to Brian M
|
1st review completed | | | 9/26/2017 | | DONE |
Brian McGowan
|
|
|
Deck details for WUI, verify retaining wall location at Garage, Light penetration at WUI soffit.
|
Routing - MECHANICAL | | | 9/26/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 7/21/2017 | | 9/25/2017 | | FAIL |
Brian McGowan
|
|
|
Deck details for WUI, verify retaining wall location at Garage, Light penetration at WUI soffit.
|
Routing - FIRE | | 7/17/2017 | 7/21/2017 | | PASS |
Scott Arellano
|
|
|
All portions of this structure shall comply with the provisions of BMC 7-01-69 section 4920 regardign a 30-foot defensible space. This property is subject to future fire department inspection.
|
Routing - Erosion and Sediment | 7/18/2017 | | 7/19/2017 | | PASS |
Andy J. Long
|
|
|
ESC permit already issued with GRD permit. See ESC17-00793. ESC plan prepared and approved. .
|
Route to Impact Fee Review | 7/17/2017 | 7/20/2017 | 7/18/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Grading-Hillside | 7/17/2017 | | 7/18/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLANNING | 7/18/2017 | | 7/18/2017 | | PASS |
Celine Acord
|
|
|
per CFH17-00026
|
Routing - PUBLIC WORKS | 7/18/2017 | | 7/18/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/17/2017 | | DONE |
|
|
|
|
Intake Approval | | | 7/17/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/17/2017 | | DONE |
|
|
|
|
Routing - Addressing | 7/17/2017 | | 7/17/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Sewer Rating | 7/17/2017 | | 7/17/2017 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | 7/17/2017 | | | |
|
|
|
|