Permit for the construction of a new 2968 sq. ft., two story (first story 1631 sq. ft., basement 1337 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 262 sq. ft. of covered patio/porch and a 400 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1CH zoning and setbacks per planning. ***MDH***
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/6/20186/7/20186/7/2018PPASS
DetailsDave Hannah
Charlie Phone #: ###-####
DOC - Permit Finaled6/7/20186/7/20186/7/2018PPASS
DetailsDave Hannah
BLD-Final6/5/20186/6/20186/6/2018ANR
DetailsDave Hannah
Gorge Phone #: ###-####
BLD-Framing/Rough-in5/7/20185/8/20185/8/2018APASS
DetailsDave Hannah
Charlie--for the garage Phone #: ###-####
BLD-Footing4/4/20184/5/20184/5/2018APASS
DetailsDave Hannah
11 am Please- Geroge Phone #: ###-####
BLD-Energy code compliance2/7/20182/7/20182/7/2018PPASS
DetailsDave Hannah
George Phone #: ###-####
BLD-Framing/Rough-in2/5/20182/6/20182/6/2018APASS
DetailsDave Hannah
Geroge Phone #: ###-####
BLD-Wall Bracing1/9/20181/10/20181/10/2018APASS
DetailsDave Hannah
George Phone #: ###-####
Plan Modification Accepted  1/9/2018 DONE
new manual j report
Routing - MECHANICAL1/9/2018 1/9/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Conference11/15/201711/15/201711/16/2017PDONE
DetailsDave Hannah
Customer complaint about plastic fence falling down and no sign (ESC) post for construction.
BLD-Foundation11/7/201711/8/201711/8/2017PPASS
DetailsDave Hannah
Jenny Phone #: ###-####
BLD-Footing11/3/201711/6/201711/6/2017APASS
DetailsDave Hannah
Sebastian Phone #: ###-####
BLD-Foundation11/6/201711/6/201711/6/2017ACANC
DetailsDave Hannah
Issue PAID IN FULL permit  10/27/2017 DONE
OVERRIDE  10/13/2017  
Inspection Record Card- Bld  10/13/2017 DONE
DetailsChristina Prado
Telephone call  10/13/2017 DONE
Spoke with George informing him that his permit is ready to be picked up and the fee amount due for issuance
Routing - PLAN CHECK7/24/2017 10/13/2017 PASS
DetailsBrian McGowan
Plan assigned to (M_H)8/17/2017 10/13/2017 DONE
DetailsMichael Hanson
1st review completed waiting for response - 9/17/17 received 5 out of 7 deficiencies. Emailed back for remaining 2 deficiencies. MH
PLANS/APPL TAKEN TO FRONT DESK  10/13/2017 DONE
Case Summary (BLD)  10/13/2017 DONE
DetailsMichael Hanson
Permit Ready to Issue  10/13/2017 DONE
DetailsChristina Prado
All requirements met
Plan resubmittals received  10/12/2017 DONE
Received two copies full set of plans; given to Michael Hanson
1st review completed  8/29/2017 FAIL
DetailsMichael Hanson
Contacted client with list of deficiencies 8/17. ***MDH***
Plan assigned to (BJM)7/18/20177/18/20178/17/2017 DEFR
DetailsBrian McGowan
7/31 sfd paper
Plan Reviewer's activity  8/17/2017  
DetailsMichael Hanson
Routing - PLANNING8/10/2017 8/11/2017 PASS
DetailsTed Vanegas
Revised plans show increased rear setback to 10'.
Plan resubmittals received  8/10/2017 DONE
received two full size copies of site plan and one reduced size site plan; taken to Brian McGowan
Routing - MECHANICAL7/28/2017 7/28/2017 PASS
DetailsTroy James
Routing - MECHANICAL  7/24/2017 FAIL
DetailsTroy James
emailed corrections to Idaho HVAC
Route to Impact Fee Review7/18/20177/21/20177/21/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing7/18/2017 7/19/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/18/2017 7/19/2017 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  7/18/2017 DONE
Intake Approval  7/18/2017 PASS
Recd Pcfee & Taken To Pln CK  7/18/2017 DONE
Application received 7/18/2017   
Routing - PLANNING7/19/2017   FAIL
The garage location does not provide the required 22' of backup space.