Second Notice | | 2/17/2020 | 2/13/2020 | | DONE |
|
|
|
This permit finaled on the web by Chris Witt
|
First Notice | 1/24/2020 | 1/24/2020 | 2/7/2020 | | DONE |
Mike Jordan
|
|
|
mailed 2-10-20
|
BLD-Final | 1/24/2020 | 1/24/2020 | 1/24/2020 | P | PASS |
Mike Jordan
|
|
|
Permit needs to be closed. Final Occupancy given on main permit BLD17-02871.
|
DOC - Permit Finaled | 1/24/2020 | 1/24/2020 | 1/24/2020 | P | PASS |
Mike Jordan
|
|
|
|
Meeting | | | 5/31/2019 | | DONE |
|
|
|
sent out email, and called companies with none, informing about correct address to all contractors
|
BLD-Wall Bracing | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | CANC |
Mike Jordan
|
|
|
John Phone #: ###-####. wrong permit called in.
|
BLD-Footing | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | CANC |
Mike Jordan
|
|
|
John Phone #: ###-####
|
BLD-Foundation | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | PART |
Mike Jordan
|
|
|
grout-John Phone #: ###-####. First two courses of CMU from top of footing to Finish floor (elev.100) Noted this portion is part of the footing and foundation permit. Area of work is north and east exterior walls at north wing and interior walls on north wing. Special inspector to be on site.
|
Issue PAID IN FULL permit | | | 10/3/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/27/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 9/27/2017 | | DONE |
|
|
|
MET 9-29-17
Need:
Revised value
GC form
|
Plan assigned to (CDM) | 8/21/2017 | 8/21/2017 | 9/26/2017 | | PASS |
Carl D Madsen
|
|
|
Humane Society Foundation 1st done
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/21/2017 | | 9/26/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 9/21/2017 | | 9/26/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Design Review | 9/25/2017 | | 9/25/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Design Review | 9/21/2017 | | 9/21/2017 | | FAIL |
Andrea Tuning
|
|
|
Landscape Plan and Site Plan are requried to match.
|
Route to Impact Fee Review | 9/5/2017 | 9/8/2017 | 9/6/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 9/6/2017 | | FAIL |
|
|
|
|
Routing PW Environmental | 8/21/2017 | | 9/6/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLAN CHECK | 8/21/2017 | | 9/5/2017 | | FAIL |
Carl D Madsen
|
|
|
Failed pending other departments
|
Routing - FIRE | 8/21/2017 | 8/21/2017 | 9/1/2017 | | PASS |
Scott Arellano
|
|
|
Attached plan review report to case.
|
Routing Off Site - STRUCTURAL | 8/21/2017 | | 8/26/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLANNING Land Div | 8/21/2017 | | 8/25/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLUMBING | 8/21/2017 | | 8/23/2017 | | PASS |
Bill VanDegrift
|
|
|
--vent all traps per ISPDC
--2" min waste below slab
|
Routing - PUBLIC WORKS | 8/21/2017 | | 8/22/2017 | | PASS |
Rachael Beierle
|
|
|
FOUNDATION ONLY.
|
Routing - Erosion and Sediment | 8/21/2017 | | 8/22/2017 | | CANC |
Andy J. Long
|
|
|
ESC permit already issued for the IHS project. See GRD17-00030/ ESC17-00748. No new ESC permit required.
|
Routing PW Street Lights | 8/21/2017 | | 8/22/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 8/21/2017 | | 8/22/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Connecting to existing services (part of SDP 374 Bird Street Sewer Extension)
|
Routing PW Solid Waste | 8/21/2017 | | 8/21/2017 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 8/21/2017 | | 8/21/2017 | | PASS |
Brian Murphy
|
|
|
|
Intake Approval | | | 8/21/2017 | | PASS |
|
|
|
|
Routing - Addressing | 8/21/2017 | | 8/21/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - Design Review | 8/21/2017 | | 8/21/2017 | | FAIL |
Andrea Tuning
|
|
|
Widen planter island next to ADA spaces to be 8-feet in width (interior dimensions).
|
Routing - PLANNING | 8/21/2017 | | 8/21/2017 | | PASS |
David Moser
|
|
|
|
Intake Approval | | | 8/8/2017 | | FAIL |
Julie Romig
|
|
|
Need:
1. Structural Floor Plans and Roof Plans
2. Calculations showing load on foundation from rest of building.
3. Form 310 for special inspections if any special inspections will be required.
|
Application received | | | 7/18/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 18 2017 3:15PM
|