Permanent Occupancy | | | 7/2/2018 | | DONE |
|
|
|
|
BLD-Final | 6/28/2018 | 6/29/2018 | 6/29/2018 | P | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-#### OK for Temp Occ. OK for Perm occ. when Zoning perms
|
Zoning Approval Temp | 6/29/2018 | 6/29/2018 | 6/29/2018 | | DONE |
Brent Moore
|
|
|
90 days Bond has been provided
|
PubWorks Occupancy Approval | 6/28/2018 | 6/28/2018 | 6/28/2018 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. I let Pat know that the Grading Permit has not been signed off yet.
Pat Phone #: ###-####
|
FIRE-Final Inspection | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | FAIL |
Troy Cobbley
|
|
|
Need fire dept access/pavement/curbing installed, knox key box provided, fire dept access signage, monument addressing, project related fire sprinkler permit finaled, spring hinges installed
Cody Phone #: ###-####
|
BLD-Wall Bracing | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Jim Storey
|
|
|
RC1 Channel - Pat Phone #: ###-####
|
BLD-Energy code compliance | 3/2/2018 | 3/2/2018 | 3/2/2018 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 3/2/2018 | 3/2/2018 | 3/2/2018 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-####-please call when on your so GC can meet you for the inspeciton sheer ok/ truss brasing t4/ fire thur soffit drops/ stud hvac max 24 oc/fire blk unusable spaces/ header at closet/blow patch ridge pick.
|
Plan Modification Accepted | | | 2/26/2018 | | DONE |
|
|
|
new manual j reports
|
Routing - MECHANICAL | 2/26/2018 | | 2/26/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j reports
|
Issue PAID IN FULL permit | | | 1/19/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/19/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/19/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/12/2018 | | DONE |
|
|
|
|
Extend Review Timeline | | | 1/11/2018 | | DONE |
|
|
|
1st Approved 180 day extension per Adele. See documents
|
Telephone call | | | 1/5/2018 | | DONE |
|
|
|
Spoke with Kevin informing him that this permit is going to expire in 10 days and if he would like he may send in a request for a 180 day extension or the permit would just need to be picked up and paid for. stated they would do one or the other
|
Expiration Notice | 12/22/2017 | 1/16/2018 | 12/22/2017 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 12/11/2017 | | |
|
|
|
|
Routing - PLAN CHECK | 12/11/2017 | | 12/11/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/11/2017 | | DONE |
|
|
|
Need
RP
ACHD - met
Revised value (need correct one without foundation value and correct address)
closse out foundation permit when issued this main permit
|
Routing - PLANNING | 10/23/2017 | | 12/11/2017 | | PASS |
Celine Acord
|
|
|
Sign off per E-Plan
|
Routing Off Site - STRUCTURAL | 10/23/2017 | | 11/5/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 10/23/2017 | | 11/5/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Plan assigned to (CDM) | 8/3/2017 | 8/3/2017 | 11/2/2017 | | PASS |
Carl D Madsen
|
|
|
Owyhee Apartments 1st Done
|
Routing - PLANNING Land Div | 8/3/2017 | | 10/24/2017 | | PASS |
Todd Tucker
|
|
|
|
Route to Impact Fee Review | 9/11/2017 | 9/14/2017 | 9/22/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLANNING | 8/3/2017 | | 9/11/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 8/3/2017 | | 9/11/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Sewer Design | 8/3/2017 | | 9/11/2017 | | PASS |
Mike Sheppard
|
|
|
|
Routing - PLAN CHECK | 8/3/2017 | | 9/11/2017 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 9/11/2017 | | FAIL |
|
|
|
|
Routing - FIRE | 8/3/2017 | 8/3/2017 | 8/10/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - Erosion and Sediment | 8/3/2017 | | 8/8/2017 | | PASS |
Andy J. Long
|
|
|
see ESC17-00936 for SWPPP review and main site permit.
|
Routing - Addressing | 8/3/2017 | | 8/4/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/3/2017 | | 8/4/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 8/3/2017 | | 8/4/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH16-00444.
|
Routing - MECHANICAL | 8/3/2017 | | 8/3/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 8/3/2017 | | 8/3/2017 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 8/3/2017 | | PASS |
|
|
|
|
Routing PW Street Lights | 8/3/2017 | | 8/3/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 8/3/2017 | | 8/3/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 8/3/2017 | | 8/3/2017 | | PASS |
Evan Carpenter
|
|
|
|
Intake Approval | | | 8/1/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
2. Please provide and upload a completely fill out form #310 which consist of ten pages (only the cover sheet was filled out plus 4 blank sheets were uploaded, on the left side on pages 2 thru 10 of form #310 please check appropriate box or appropriate section that applies to project) 7-31-2017.
Please provide a completed Form #310 – Statement of Special Inspections must be completed by the design engineer
|
Intake Approval | | | 7/20/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
1. Please provide owner signature on the form #304
2. Please provide a completed Form #310 – Statement of Special Inspections must be completed by the design engineer
3. Please provide a signed, stamped and dated E-5 sheet by an Idaho licensed electrical engineer
4. Please provide smoke alarm & carbon monoxide alarm locations, on plan sheet E-2 the symbol for smoke detector not found on plan sheet E-1 as stated and no symbol for carbon monoxide detector found on legend or plan sheet
|
Application received | | | 7/18/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 18 2017 4:25PM
|
First Notice | | 7/12/2018 | | | |
|
|
|
|