BLD-Final | 12/15/2017 | 12/15/2017 | 12/15/2017 | P | DONE |
Tony Young
|
|
|
Hans Phone #: ###-####
|
DOC - Permit Finaled | 12/15/2017 | 12/15/2017 | 12/15/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 12/8/2017 | 12/11/2017 | 12/11/2017 | A | NR |
Dave Hannah
|
|
|
Hans Phone #: ###-#### needs smoke and co2 detectors
|
BLD-Wall Bracing | 10/2/2017 | 10/3/2017 | 10/3/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### ok to cover ext needs to install beam and ok to insulate after elec rough in
|
BLD-Concrete | 8/30/2017 | 8/31/2017 | 8/31/2017 | P | PASS |
Tony Young
|
|
|
Shaun Phone #: ###-####,, walls ok
|
BLD-Concrete | 8/23/2017 | 8/24/2017 | 8/24/2017 | A | PASS |
Tony Young
|
|
|
pour 12 // Shaun Phone #: ###-####,, footings ok
|
Routing Walk-In (BLD) | 7/24/2017 | 7/24/2017 | 7/24/2017 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 7/19/2017 | 7/19/2017 | 7/24/2017 | | PASS |
Josh Bogle
|
|
|
1st done - need more info, clarified info
|
Routing - PLAN CHECK | 7/24/2017 | | 7/24/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/24/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/24/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 7/24/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/24/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/19/2017 | 7/19/2017 | 7/19/2017 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 7/19/2017 | 7/19/2017 | 7/19/2017 | A | FAIL |
Josh Bogle
|
|
|
needed ES report for spray foam, took in as a level 2
|
1st review completed | | | 7/19/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/19/2017 | | 7/19/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 7/19/2017 | | | |
|
|
|
|