BLD-Final | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Please call Bryan at 208.286.8679. Thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel
|
DOC - Permit Finaled | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 3/2/2018 | 3/2/2018 | 3/2/2018 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Framing/Rough-in | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Call Bryan at ###-####. Needed to see straps at garage doors. Thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel
|
BLD-Wall cover | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Call Bryan at ###-####. Detached garage..should be ready to cover after framing pass. Thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel
|
BLD-Wall Bracing | 1/10/2018 | 1/11/2018 | 1/11/2018 | A | PASS |
Brandon Shaw
|
|
|
See detail for PHF- 2"x2" washer, straps at header, 3"x3" nailing at header
|
BLD-Foundation | 12/28/2017 | 12/29/2017 | 12/29/2017 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Footing | 12/28/2017 | 12/28/2017 | 12/28/2017 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
PubWorks Subgrade Approval | 12/28/2017 | 12/28/2017 | 12/28/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Framing/Rough-in | 12/14/2017 | 12/15/2017 | 12/14/2017 | A | CANC |
Brandon Shaw
|
|
|
Please reference engineer compliance letter. Thanks Bryan Phone #: ###-#### >> Inspection requested via web by Bryan Mogel Inspection cancelled from web by: Bryan Mogel
|
BLD-Wall Bracing | 12/14/2017 | 12/15/2017 | 12/14/2017 | A | CANC |
Brandon Shaw
|
|
|
Please reference engineer compliance letter. Thanks Bryan Phone #: ###-#### >> Inspection requested via web by Bryan Mogel Inspection cancelled from web by: Bryan Mogel
|
Routing - MECHANICAL | 12/8/2017 | | 12/8/2017 | | PASS |
Troy James
|
|
|
manual j report
|
Issue PAID IN FULL permit | | | 8/7/2017 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 7/19/2017 | 7/19/2017 | 8/4/2017 | | DONE |
Brian McGowan
|
|
|
7/26 Walk in for Detached Garage
|
Routing - PLAN CHECK | 7/19/2017 | | 8/4/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2017 | | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 8/4/2017 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/4/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/4/2017 | | DONE |
|
|
|
met
|
Telephone call | | | 8/4/2017 | | DONE |
|
|
|
called Bryan to let know permit is ready
|
Routing - Erosion and Sediment | 7/25/2017 | | 7/25/2017 | | PASS |
Andy J. Long
|
|
|
No new ESC permit required. Okay to use existing ESC permit, see ESC16-01743
|
Routing - PUBLIC WORKS | 7/25/2017 | | 7/25/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Grading-Hillside | 7/20/2017 | | 7/24/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 7/21/2017 | | DONE |
|
|
|
resubmittal received 3 sets of sheets 1, 2 & 3-took to brian McGowan
|
Routing - Addressing | 7/20/2017 | | 7/20/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing Walk-In (Zoning) | 7/19/2017 | 7/19/2017 | 7/19/2017 | P | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 7/19/2017 | 7/19/2017 | 7/19/2017 | P | PASS |
Josh Bogle
|
|
|
taken in as a level 2 - Hillside
|
Application received | | 7/19/2017 | | | |
|
|
|
|