Letter of compliance/Occupancy | | | 7/10/2020 | | DONE |
|
|
|
|
BLD-Final | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Jim Storey
|
|
|
Anne *screened* Phone #: ###-####
|
DOC - Permit Finaled | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Jim Storey
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/29/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 6/12/2020 | 6/12/2020 | 6/26/2020 | | PASS |
Josh Bogle
|
|
|
06/18 PV, ePlan
|
Routing - PLAN CHECK | 6/15/2020 | | 6/26/2020 | | PASS |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/26/2020 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
Routing - PLANNING | 6/15/2020 | | 6/15/2020 | | PASS |
Sue Cummings
|
|
|
|
Plan Modification Accepted | | | 6/12/2020 | | DONE |
|
|
|
Plan Mod to reduce amount of solar panels on roof top
Paper to ePlan; Route to JAB & Planning
|
Telephone call | | | 6/11/2020 | | DONE |
|
|
|
want to add solar panels to the existing permit was informed that plan mod is needed and transper to Josh also an extension on permit
|
BLD-Aging Inspection | 6/5/2018 | 6/5/2018 | 6/8/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 6/4/2018 | 6/4/2018 | 6/8/2018 | | PEND |
Dave Hannah
|
|
|
|
Routing Walk-In (BLD) | 7/20/2017 | 7/20/2017 | 7/20/2017 | A | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 7/20/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/20/2017 | | 7/20/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/20/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/20/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 7/20/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/20/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/19/2017 | 7/19/2017 | 7/19/2017 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 7/19/2017 | 7/19/2017 | 7/19/2017 | P | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 7/19/2017 | | FAIL |
|
|
|
Did not have UL Listings on the specifications for the materials to be installed.
|
Application received | | 7/19/2017 | | | |
|
|
|
|