Third Notice | | 3/19/2018 | 3/23/2018 | | DONE |
|
|
|
|
Third Notice | | 2/17/2018 | 3/14/2018 | | DONE |
|
|
|
Mailed 3-15-18
|
Second Notice | | 1/21/2018 | 2/12/2018 | | DONE |
|
|
|
Mailed 2-13-18
|
First Notice | | 12/22/2017 | 1/11/2018 | | DONE |
|
|
|
Mailed 1-12-18
|
BLD-Final | 12/11/2017 | 12/12/2017 | 12/12/2017 | A | PASS |
Jim Sly
|
|
|
Long Do Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 12/12/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/11/2017 | 12/11/2017 | 12/11/2017 | P | PASS |
Jim Page
|
|
|
Final fire life safety inspection complete
|
FIRE-Conference | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | DONE |
Troy Cobbley
|
|
|
Went over life safety requirements. I noted that the K class fire extinguisher needs mounted, west exit discharge light needs repaired, need city approved plans and documents, need corrected door hardware at the main exits (fire review comments call for panic), need occupant load signs.
|
Print Occupancy Form | | | 9/19/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/19/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/18/2017 | | DONE |
|
|
|
Need:
Revised cert of value
GC form
|
Plan assigned to (JG) | 9/13/2017 | 9/13/2017 | 9/15/2017 | | PASS |
Javier Guzman
|
|
|
9/13 L3 PHO REAL ePlan, pend envior
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/15/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 9/13/2017 | 9/16/2017 | 9/14/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing PW Environmental | 8/25/2017 | | 9/14/2017 | | PASS |
Rick Christenson
|
|
|
|
Plan assigned to (JG) | 8/24/2017 | 8/24/2017 | 9/13/2017 | | PASS |
Javier Guzman
|
|
|
9/13 L3 PHO REAL ePlan
|
Routing - PLAN CHECK | 8/24/2017 | | 9/13/2017 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 9/13/2017 | | DONE |
Javier Guzman
|
|
|
|
Routing - FIRE | 8/24/2017 | 8/24/2017 | 9/6/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - Erosion and Sediment | 8/24/2017 | | 8/29/2017 | | PASS |
Andy J. Long
|
|
|
No ESC permit required. Minor TI, no exterior work
|
Routing - PLUMBING | 8/24/2017 | | 8/25/2017 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 8/24/2017 | | 8/25/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plan Reviewer's activity | | | 8/25/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Emailed Ward 8/24/17 to contact ACHD in regards to usage fees.
|
Routing - Addressing | 8/24/2017 | | 8/24/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 8/24/2017 | | 8/24/2017 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 8/24/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Javier approved per screen
|
Intake Approval | | | 8/22/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
• Previous request to fill out the form #304 completely not addressed, I have attached the uploaded form #304 to show you that the area for the registered design professional is still blank which needs to filled out. Please provide the missing information regarding the design professional on the uploaded #304 form
|
Intake Approval | | | 8/10/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
• Previous request to fill out the form #304 completely not addressed. Please provide the missing information regarding the design professional on the uploaded #304 form
• Previous request to upload and provide a completed Food Establishment License application not addressed. Form can be found at https://www.cdhd.idaho.gov/eh-food-forms.php
|
Intake Approval | | | 7/25/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
• Please fill out and complete the checklist, if there are any items requested from the checklist that applies to this project please upload
|
Intake Approval | | | 7/25/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
• Please provide the missing information from the uploaded #304 form
• The document uploaded named “CDHDapproval” is not the CDHD form it is a copy of the incomplete 304 form
o Please provide a completed Food Establishment License application found at https://www.cdhd.idaho.gov/eh-food- forms.php
o Please provide a Food Establishment Plan Review and Approval form found at https://www.cdhd.idaho.gov/eh-food- forms.php
• Please provides site specific fire flow at hydrants letter from Suez Water or other public water provider. Include static pressure if sprinklers are to be installed.
• The previous permit (BLD15-00646) was never issued and exterior work was to be done, now under this permit the exterior work needs planning and zoning approval, please provide approval letter from planning and zoning for new exterior door 1E
• Please provide a roof plan due to the new rooftop equipment
• Please show on plans the new walls, a wall section view, top of wall bracing and wall schedule for the new walls that were to be done under BLD15-00646 and was never issued
• Please provide a finish schedule
• Please provide a reflected ceiling plan
• Please provide and show the exit signs and emergency lighting in all the required areas of the tenant space
• Please provide a stamped, signed and dated plan sheet A-1 by you Idaho licensed architect
• Please provide plumbing plans for the new plumbing fixtures in a food service establishment, the plumbing plans are required to be stamped, dated and signed by an Idaho licensed engineer
|
Application received | | | 7/19/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 19 2017 4:36PM
|