BLD-Final | 3/5/2018 | 3/5/2018 | 3/5/2018 | P | PASS |
Jim Sly
|
|
|
Bob Phone #: ###-####
|
DOC - Permit Finaled | 3/5/2018 | 3/5/2018 | 3/5/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 2/21/2018 | 2/23/2018 | 2/23/2018 | A | NR |
Jim Sly
|
|
|
Mike Phone #: ###-#### Need Electrical final.
|
BLD-Framing/Rough-in | 11/7/2017 | 11/9/2017 | 11/10/2017 | P | PASS |
Jim Sly
|
|
|
Robert Phone #: ###-####
|
BLD-Wall Bracing | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | PASS |
Jim Sly
|
|
|
Bob Phone #: ###-####
|
BLD-Wall Bracing | 11/1/2017 | 11/2/2017 | 11/2/2017 | A | FAIL |
Jim Sly
|
|
|
Robert Phone #: ###-#### C/N posted. Provide 6 brace panels.
|
BLD-Foundation | 10/6/2017 | 10/9/2017 | 10/10/2017 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 10/5/2017 | 10/6/2017 | 10/6/2017 | P | PASS |
Brandon Shaw
|
|
|
Jerry Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/7/2017 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 7/21/2017 | 7/21/2017 | 7/26/2017 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/26/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/26/2017 | | 7/26/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/26/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/26/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 7/26/2017 | | DONE |
|
|
|
***met 7-31-17 CAN***need RP
|
Telephone call | | | 7/26/2017 | | DONE |
|
|
|
Called Bob to let know the permit is and how much is owed and that we need the RP
|
Routing Walk-In (Zoning) | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | PASS |
Josh Bogle
|
|
|
came in during meeting
|
Application received | | 7/21/2017 | | | |
|
|
|
|