BLD-Final | 6/13/2018 | 6/15/2018 | 6/15/2018 | P | DONE |
Jim Sly
|
|
|
exp
|
DOC - Permit Expired | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | PASS |
Jim Sly
|
|
|
exp
|
Plan assigned to (JAB) Josh | 7/21/2017 | 7/21/2017 | 7/26/2017 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/21/2017 | | 7/26/2017 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/26/2017 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/26/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/26/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 7/26/2017 | | DONE |
|
|
|
|
Telephone call | | | 7/26/2017 | | DONE |
|
|
|
called- left message on main line letting them know tht the permit is ready and how much is owed-also that they will need the ele permit
|
Issue PAID IN FULL permit | | | 7/26/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | PASS |
Josh Bogle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/21/2017 | | DONE |
|
|
|
|
Intake Approval | | | 7/21/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/21/2017 | | DONE |
|
|
|
|
Application received | | 7/21/2017 | | | |
|
|
|
|