Information based on query as of Monday, July 8, 2024.
Permit Information
Permit NumberBLD17-02553
StatusFinaled
Name MJT CONSTRUCTION INC
Site Address 1650 W STATE ST
Project NameAlbertsons
Customer Number 
ePlanReviewYes
Description
(ALBERTSONS – PHARMACY REMODEL) Permit is to remodel the existing pharmacy within an existing 66,399 sq. ft. retail grocery store. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select soffit, removal of select exterior wall for new exterior door opening, construction of interior non-bearing walls to create a consult room, an RX storage area, a RX entry area and a waiting area, select new door/door frames, new CMU infill at old exterior door opening, millwork, relocated sink, (3) new overhead security doors, electrical work, plumbing work and interior finishes in compliance with Ch. 8 of the 2012 IBC. Note: special inspection required see attached #310 form. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  2/2/2018 DONE
Second Notice 12/22/20171/11/2018 DONE
Mailed 1-12-18
First Notice11/28/201711/28/201712/12/2017 DONE
DetailsMike Jordan
Mailed 12-13-17
BLD-Final11/27/201711/28/201711/28/2017PPASS
DetailsMike Jordan
Mike Phone #: ###-####
DOC - Permit Finaled11/28/201711/28/201711/28/2017PPASS
DetailsMike Jordan
FIRE-Final Inspection11/27/201711/28/201711/28/2017APASS
DetailsJim Page
No fire sprinkler modifications, no fire alarm modifications, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection for area of work passed/complete.
BLD-Framing/Rough-in8/30/20178/31/20178/31/2017PPASS
DetailsTony Young
As early as possible // Mike Phone #: ###-####,, walls,, grid ok
Issue PAID IN FULL permit  8/4/2017 DONE
Inspection Record Card- Bld  8/4/2017 DONE
Plan assigned to (JG)7/28/20177/28/20178/1/2017 PASS
DetailsJavier Guzman
8/03 L1 Albertsons ePlan
Routing - PLAN CHECK7/28/2017 8/1/2017 PASS
DetailsJavier Guzman
Routing - Addressing7/28/2017 8/1/2017 PASS
DetailsDoug Chausow
1st review completed  8/1/2017 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/1/2017 DONE
Permit Ready to Issue  8/1/2017 DONE
ALL MET Need GC Form and Revised Cert of Value
Routing - PUBLIC WORKS7/28/2017 7/28/2017 PASS
DetailsBeverly Mountain
Routing - Design Review7/28/2017 7/28/2017 PASS
DetailsAndrea Tuning
Intake Approval  7/28/2017 PASS
DetailsJavier Guzman
Intake Approval  7/25/2017 FAIL
DetailsJavier Guzman
Please provide and upload the following:
1. Please have the structural calculation stamp signed by the engineer
2 Please provide planning approval letter for the new exterior door opening
3. Please provide a completed #310 form for the epoxy anchors found at our website at http://pds.cityofboise.org/home/documents/apps/300/
Application received  7/24/2017 DONE
Application submitted via PDS Online on Jul 24 2017 9:34AM