BLD-Final | 5/8/2018 | 5/9/2018 | 5/9/2018 | A | PASS |
Brandon Shaw
|
|
|
Tim Phone #: ###-####
|
DOC - Permit Finaled | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Brandon Shaw
|
|
|
|
Routing PW Flood Plain | 5/8/2018 | | 5/8/2018 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMR in file. No floodplain review required. JCT
|
BLD-Wall Bracing | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | PASS |
Brandon Shaw
|
|
|
Shear // Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/15/2018 | 2/15/2018 | 2/15/2018 | P | PASS |
Brandon Shaw
|
|
|
Framing and insulation- SAT
|
BLD-Energy code compliance | 2/14/2018 | 2/14/2018 | 2/15/2018 | P | PEND |
Dave Hannah
|
|
|
Tim Phone #: ###-#### ok after truss have been inspected
|
BLD-Framing/Rough-in | 2/13/2018 | 2/14/2018 | 2/15/2018 | P | PEND |
Dave Hannah
|
|
|
Tim Phone #: ###-#### needs truss engineering checked
|
BLD-Framing/Rough-in | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | PART |
Dave Hannah
|
|
|
Tim Phone #: ###-#### needs truss engineering lvl header bath room and fire blocking fured out wall basement ok to insulate
|
BLD-Wall Bracing | 1/31/2018 | 2/1/2018 | 2/1/2018 | A | PASS |
Brandon Shaw
|
|
|
Tim Phone #: ###-####
|
Plan Modification Accepted | | | 11/22/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 11/22/2017 | | 11/22/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | PASS |
Jim Storey
|
|
|
Tim Phone #: ###-####
|
BLD-Footing | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | PASS |
Brandon Shaw
|
|
|
Tim Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/25/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/25/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/22/2017 | | |
|
|
|
|
Plan assigned to (JG) | 9/8/2017 | 9/8/2017 | 9/22/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 8/09 sfd ePlan
|
Routing PW Flood Plain | 9/20/2017 | | 9/22/2017 | | PASS |
Jason C. Taylor
|
|
|
NOTE:
Two Elevation Certificates will be required; one prior to receiving a framing inspection, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to occupancy approval. Jason Taylor ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/22/2017 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Routing - PLAN CHECK | 9/20/2017 | | 9/21/2017 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 9/9/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 7/27/2017 | | 9/9/2017 | | FAIL |
Javier Guzman
|
|
|
|
Plan assigned to (BJM) | 7/27/2017 | 7/27/2017 | 9/8/2017 | | DEFR |
Brian McGowan
|
|
|
8/09 sfd ePlan
|
Routing PW Flood Plain | 7/27/2017 | | 8/1/2017 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in ePlan. JCT
|
Route to Impact Fee Review | 7/27/2017 | 7/30/2017 | 7/28/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 7/27/2017 | | 7/28/2017 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 7/27/2017 | | 7/28/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/27/2017 | | 7/27/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 7/27/2017 | | 7/27/2017 | | PASS |
Sue Cummings
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/27/2017 | | DONE |
|
|
|
|
Intake Approval | | | 7/27/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/27/2017 | | DONE |
|
|
|
|
Application received | | | 7/25/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 25 2017 8:56AM
|