BLD-Final | 5/10/2018 | 5/11/2018 | 5/11/2018 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nicole Edgar
|
DOC - Permit Finaled | 5/11/2018 | 5/11/2018 | 5/11/2018 | P | PASS |
Tony Young
|
|
|
c of c issued
|
BLD-Ceiling Grid Inspection | 5/10/2018 | 5/11/2018 | 5/10/2018 | A | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Nicole Edgar Inspection cancelled from web by: Nicole Edgar
|
PubWorks Occupancy Approval | 5/10/2018 | 5/10/2018 | 5/10/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s engineer indicating that the retaining walls have been installed to plan and are structurally acceptable has been received by Public Works. Final occupancy may be approved by the building department
|
BLD-Final | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PEND |
Tony Young
|
|
|
Chad Phone #: ###-####,, needs public works to see engineer approval letter and approve 1st
|
OVERRIDE | | | 5/7/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 4/27/2018 | 4/27/2018 | 5/7/2018 | | PASS |
Josh Bogle
|
|
|
Plan Mod - needs PW, Planning, ESC review also
|
Routing - PLAN CHECK | 5/1/2018 | | 5/7/2018 | | PASS |
Josh Bogle
|
|
|
min. charge for Plan Review - JAB
|
Routing - PUBLIC WORKS | 5/1/2018 | | 5/7/2018 | | PASS |
Morgan Webb
|
|
|
|
Inspection Record Card- Bld | | | 5/7/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/7/2018 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 5/7/2018 | | 5/7/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
Permit Ready to Issue | | | 5/7/2018 | | DONE |
|
|
|
NEED RP(EXPIRED 4/22/18)
PLAN MOD
|
BLD-Final | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | CANC |
Tony Young
|
|
|
Nicole Phone #: ###-####
|
Routing - PLANNING | 5/1/2018 | | 5/2/2018 | | PASS |
Nicolette Womack
|
|
|
Only approved rear retaining walls.
|
Routing - Erosion and Sediment | 5/1/2018 | | 5/2/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver approved on condition that ESC site prep inspection occurs before work begins.
|
BLD-Footing | 4/26/2018 | 4/27/2018 | 4/27/2018 | A | NR |
Tony Young
|
|
|
Chad Phone #: ###-####-has to make changes to drawings
|
Plan resubmittals received | | | 4/27/2018 | | DONE |
|
|
|
|
BLD-Final | 4/24/2018 | 4/26/2018 | 4/26/2018 | A | NR |
Tony Young
|
|
|
Chad Phone #: ###-####-has to make changes to drawings but wants to see about a temp c of o
|
(F) Reprint permit | | | 1/9/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/8/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/8/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 1/5/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 7/26/2017 | 7/26/2017 | 1/5/2018 | | PASS |
Josh Bogle
|
|
|
1st done - sent back for updates required by other depts.
|
Routing - PLAN CHECK | 1/5/2018 | | 1/5/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2018 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 1/5/2018 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 12/20/2017 | | 12/21/2017 | | FAIL |
Josh Bogle
|
|
|
ES report incomplete
|
Routing - Erosion and Sediment | 12/20/2017 | | 12/20/2017 | | PASS |
Andy J. Long
|
|
|
|
Routing - PLAN CHECK | 12/5/2017 | | 12/7/2017 | | FAIL |
Josh Bogle
|
|
|
need updated plans & Form 310
|
Routing - Erosion and Sediment | 12/5/2017 | | 12/7/2017 | | FAIL |
Michael Zawacki
|
|
|
Needs ESCP. Waiver not approved. In foothills area and grading permit states significant grading.
|
Routing PW Grading-Hillside | 12/5/2017 | | 12/6/2017 | | PASS |
Jason C. Taylor
|
|
|
Need special inpections on epoxy anchor/doweling. Any new walls will need subgrade inspection prior to pouring concrete. Jason Taylor. ###-####
|
Routing - PLANNING | 12/5/2017 | | 12/5/2017 | | PASS |
Nicolette Womack
|
|
|
|
Routing - PLAN CHECK | 9/25/2017 | | 9/27/2017 | | FAIL |
Josh Bogle
|
|
|
returned to applicant for CAT II hillside work JAB
|
Routing PW Grading-Hillside | 9/25/2017 | | 9/26/2017 | | FAIL |
Melissa Jannusch
|
|
|
Project will require a CAT II Hillside application prior to acceptance of the building permit application. Application #114 will need to be filled out and turned in to the Planning & Zoning counter at city hall with the application fee. Once the application has been approved by P&Z please upload the approval letter and then this building permit case can be routed for approval. Melissa Jannusch ###-####.
|
Routing - Erosion and Sediment | 9/25/2017 | | 9/26/2017 | | FAIL |
Andy J. Long
|
|
|
Project will require a CAT II Hillside application prior to acceptance of the building permit application.
|
Routing - PLANNING | 9/25/2017 | | 9/25/2017 | | FAIL |
Sue Cummings
|
|
|
Needs to finish Hillside application prior to application for a building permit.
|
Routing - Erosion and Sediment | 8/3/2017 | | 8/8/2017 | | FAIL |
Andy J. Long
|
|
|
Site map submitted, no project narrative. Please refer to the ESC plan checklist and ESC plan template for guidance.
http://pds.cityofboise.org/home/documents/apps/700/
|
Routing PW Grading-Hillside | 7/26/2017 | | 8/1/2017 | | FAIL |
Jason C. Taylor
|
|
|
Project will require a CAT II Hillside application prior to acceptance of the building permit application. Application #114 will need to be filled out and turned in to the Planning & Zoning counter at city hall with the application fee. Once the application has been approved by P&Z please upload the approval letter and then this building permit case can be routed for approval. Jason Taylor ###-####.
|
1st review completed | | | 8/1/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/11/2017 | | 8/1/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | | 7/26/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 26 2017 9:28AM
|
Plans ACCEPTED BY PLAN TECH | | | 7/26/2017 | | DONE |
|
|
|
|
Intake Approval | | | 7/26/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/26/2017 | | DONE |
|
|
|
no fees taken at intake
|
Routing - FRONT DESK | 8/10/2017 | | | | FAIL |
|
|
|
Needs Hillside review
|
Routing - PLANNING | 7/26/2017 | | | | FAIL |
|
|
|
Retaining wall in front setback cannot exceed 3 feet in height
|