Print Statement | | | 6/19/2018 | | DONE |
|
|
|
|
Third Notice | | 5/16/2018 | 6/11/2018 | | DONE |
|
|
|
mailed 6-12
|
Second Notice | | 4/20/2018 | 5/11/2018 | | DONE |
|
|
|
mailed 5-14
|
First Notice | | 3/17/2018 | 4/10/2018 | | DONE |
|
|
|
mailed 4-11-18
|
Zoning Approval | 3/7/2018 | 3/7/2018 | 3/7/2018 | | PASS |
Katelyn Menuge
|
|
|
Final Zoning/DR Approval
|
Permanent Occupancy | | | 3/7/2018 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 3/5/2018 | 3/6/2018 | 3/6/2018 | P | PASS |
Dave Hannah
|
|
|
late pm please // Keegan Phone #: ###-####
|
BLD-Final | 3/1/2018 | 3/2/2018 | 3/5/2018 | P | NR |
Dave Hannah
|
|
|
Keegan Phone #: ###-####
|
FIRE-Final Inspection | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, commercial hood fire suppression system inspection complete, fire extinguishers are in place with current inspection tags, knox box will be mounted in discussed location when recieved. Final life fire safety inspection complete.
|
Telephone call | | | 2/8/2018 | | DONE |
|
|
|
a gentleman called woith questions about a complaint that a hood was being installed incorectly-I believe he spoke with Adele and she went out to look at it.
|
BLD-Ceiling Grid Inspection | 2/1/2018 | 2/1/2018 | 2/2/2018 | P | PASS |
Dave Hannah
|
|
|
Kitchen & Dining - Keegan Phone #: ###-####
|
BLD-Conference | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | DONE |
Dave Hannah
|
|
|
Keegan Phone #: ###-####
|
BLD-Framing/Rough-in | 1/2/2018 | 1/3/2018 | 1/3/2018 | A | PART |
Dave Hannah
|
|
|
Keegan Phone #: ###-#### steel suds around columns and kitchen area ok
|
BLD-Footing | 11/9/2017 | 11/13/2017 | 11/14/2017 | A | DONE |
Dave Hannah
|
|
|
Keegan Phone #: ###-####
|
BLD-Footing | 11/13/2017 | 11/14/2017 | 11/14/2017 | P | PASS |
Dave Hannah
|
|
|
Keegan Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/13/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/13/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/2/2017 | | |
|
|
|
|
Routing - FIRE | 9/25/2017 | | 10/2/2017 | | PASS |
Scott Arellano
|
|
|
Attached review comments to case
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/2/2017 | | DONE |
|
|
|
Need:
RP
met
Revised value (-demo permit)
ACHD
|
Plan assigned to (CJW) | 7/31/2017 | | 10/2/2017 | | PASS |
Carl Westfall
|
|
|
(2nd done) (Aug 18 - 15 days) (35 sheets) The Funky Taco
|
Routing - PLUMBING | 9/25/2017 | | 9/28/2017 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
Routing - Design Review | 9/25/2017 | | 9/25/2017 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - MECHANICAL | 9/25/2017 | | 9/25/2017 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 9/25/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/25/2017 | | 9/25/2017 | | PASS |
Carl Westfall
|
|
|
2nd review completed. Drawings approved
|
Route to Impact Fee Review | 9/8/2017 | 9/11/2017 | 9/14/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 9/8/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 9/8/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/31/2017 | | 9/8/2017 | | FAIL |
Carl Westfall
|
|
|
|
Routing - Design Review | | | 8/31/2017 | | FAIL |
Katelyn Menuge
|
|
|
|
Routing PW Environmental | 8/1/2017 | | 8/29/2017 | | PASS |
Rick Christenson
|
|
|
Approved per plumbing changes.
|
Routing Off Site - STRUCTURAL | 7/31/2017 | | 8/14/2017 | | PASS |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Routing - FIRE | 7/31/2017 | 7/31/2017 | 8/7/2017 | | FAIL |
Scott Arellano
|
|
|
Attached comments to plans. Emailed applicant with resubmittal items.
|
Routing - MECHANICAL | 7/31/2017 | | 8/7/2017 | | FAIL |
Troy James
|
|
|
left message with mechanical engineer
|
Plan assigned to (CJW) | 7/31/2017 | 7/31/2017 | 8/4/2017 | | PASS |
Carl Westfall
|
|
|
(Aug 18 - 15 days) (34 sheets) The Funky Taco
|
Routing - Erosion and Sediment | 7/31/2017 | | 8/3/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. RP to be designated.
|
Routing - Design Review | 7/31/2017 | | 8/1/2017 | | FAIL |
Katelyn Menuge
|
|
|
|
Routing - PLUMBING | 7/31/2017 | | 8/1/2017 | | FAIL |
Daryl Spivey
|
|
|
1) Change 2 floor sinks and 1 floor drain in cooking area to drain to grease instead of sanitary.
2) Change drainage on island area to drain to floor sinks and not a combination waste and vent system.
|
Routing - Addressing | 7/31/2017 | | 8/1/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/31/2017 | | 8/1/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 7/31/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Carl M approved pre screen, CDH approval uploaded
|
Intake Approval | | | 7/28/2017 | | FAIL |
|
|
|
First pre-screen 7-28-17
Please provide the special inspection start-up form 310
|
Application received | | | 7/27/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 27 2017 2:46PM
|