Second Notice | | 12/22/2017 | 12/18/2017 | | DONE |
|
|
|
This permit finaled on the web by BHH Drafter
|
First Notice | 11/29/2017 | 11/29/2017 | 12/12/2017 | | DONE |
Brandon Shaw
|
|
|
Mailed 12-13-17
|
BLD-Final | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | PASS |
Brandon Shaw
|
|
|
Mailbox Kiosk Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Wall Bracing | 11/7/2017 | 11/8/2017 | 11/8/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Footing | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick ftg/foundation ok
|
BLD-Footing | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PASS |
Jim Storey
|
|
|
Please come early afternoon if possible. Call Kyle if you have any questions Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Footing | 10/17/2017 | 10/18/2017 | 10/18/2017 | A | CANC |
Brandon Shaw
|
|
|
Call Kyle if you need directions Phone #: ###-#### Inspection requested via web by Kyle Seick
|
PubWorks Subgrade Approval | 10/11/2017 | 10/11/2017 | 10/11/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 10/2/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/2/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/29/2017 | | |
|
|
|
|
Plan assigned to (AJS) | 8/8/2017 | 8/8/2017 | 9/29/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed
|
Routing - PLAN CHECK | 9/29/2017 | | 9/29/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Permit Ready to Issue | | | 9/29/2017 | | DONE |
|
|
|
all met need
GC form-MET
|
Routing - PLAN CHECK | 9/20/2017 | | 9/25/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Grading-Hillside | 9/20/2017 | | 9/22/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing PW Grading-Hillside | 9/5/2017 | | 9/7/2017 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan
|
Routing - PLAN CHECK | 9/5/2017 | | 9/5/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
revised sheets need design professional seal and signature
|
Route to Impact Fee Review | 8/17/2017 | 8/20/2017 | 8/24/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 8/17/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 8/8/2017 | | 8/17/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLANNING Land Div | 8/8/2017 | | 8/17/2017 | | PASS |
Todd Tucker
|
|
|
signed off in e plan
|
Routing - Erosion and Sediment | 8/8/2017 | | 8/14/2017 | | PASS |
Andy J. Long
|
|
|
|
Routing - FIRE | 8/8/2017 | 8/8/2017 | 8/11/2017 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing PW Grading-Hillside | 8/8/2017 | | 8/9/2017 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan
|
Routing PW Drainage | 8/8/2017 | | 8/8/2017 | | PASS |
Brian Murphy
|
|
|
|
Intake Approval | | | 8/8/2017 | | PASS |
|
|
|
|
Routing - Addressing | 8/8/2017 | | 8/8/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/8/2017 | | 8/8/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 8/8/2017 | | 8/8/2017 | | PASS |
Sue Cummings
|
|
|
|
Plan Reviewer's activity | | | 8/4/2017 | | DONE |
Javier Guzman
|
|
|
Spoke with Katelyn Menuge and she said it is ok to accept the elevation plans as is and to please route plans to her
|
Intake Approval | | | 8/1/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
• Please completely fill out the #304 form
• Please have Architectural plan sheetA1.1 stamped and signed by an Idaho licensed architect
• Verification of Legal Lot or Parcel form signed and approved by PDS Subdivision Staff (can be found at our web site at https://pds.cityofboise.org/media/134120/211_verificationlegallot_application.pdf )
• Please provide an ESC waiver letter or provide ESC plans and ESC narrative (a sample waiver request letter can be found at our web site at http://pds.cityofboise.org/home/documents/apps/700/ )
• Please have architect provide on a plan sheet a Code Analysis/Building Data which includes: Code year, occupancy group(s), construction type(s), building height, fire suppression system if any.
• Please provide the Site Grading & Drainage Plan sheet C.1.0 stamped and signed by an Idaho licensed design professional
• Please remove from plan sheet C.1.0 and L1.00 the note “preliminary not for contruction”
|
Application received | | | 7/28/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 28 2017 9:46AM
|
Intake Approval | | | 7/28/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
• Please provide a #502 Checklist found at our website at http://pds.cityofboise.org/home/documents/apps/500/
• Please read through checklist #502, if checklist has only one box then that item is required to be provided, if checklist has two boxes then only provide items if applies to your project.
|