***HILLSIDE***WUI ZONE A REQUIREMENTS*** Permit for the construction of a new 2420 sq. ft., two story (first story 1593 sq. ft., second story 827 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 433 sq. ft. of covered patio/porch and a 652 sq. ft. attached garage per the approved plans. R-1B zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Melissa Jannusch at 608-7168. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/11/20184/12/20184/12/2018PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO
DOC - Permit Finaled4/12/20184/12/20184/12/2018PPASS
DetailsTony Young
BLD-Final4/11/20184/12/20184/11/2018ACANC
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by SHANE JAYO Inspection cancelled from web by: SHANE JAYO
BLD-Energy code compliance2/8/20182/9/20182/9/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Energy code compliance2/8/20182/9/20182/8/2018ACANC
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by SHANE JAYO Inspection cancelled from web by: SHANE JAYO
BLD-Framing/Rough-in2/1/20182/2/20182/2/2018APASS
DetailsBrandon Shaw
Corrections sat

OK to insulate
BLD-Framing/Rough-in1/30/20181/31/20181/31/2018APART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by SHANE JAYO need truss engineering/ sheer needs blk and nailled/ joist manufacture fix for web holes at bearing/
BLD-Foundation10/11/201710/11/201710/11/2017APASS
DetailsBrandon Shaw
pouring around 10 am
BLD-Foundation10/10/201710/10/201710/11/2017PNR
DetailsDave Hannah
Bill Phone #: ###-####
BLD-Footing10/5/201710/5/201710/5/2017PPASS
DetailsJim Sly
Bill Phone #: ###-####
PubWorks Subgrade Approval9/27/20179/27/20179/27/2017 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  9/21/2017 DONE
Telephone call  9/13/2017 DONE
DetailsChristina Prado
Called SHane to advise permit is ready and gave fees due
OVERRIDE  9/12/2017  
Inspection Record Card- Bld  9/12/2017 DONE
Routing - PLAN CHECK8/29/2017 9/12/2017 PASS
DetailsCarl D Madsen
Plan assigned to (M_H)9/6/2017 9/12/2017 DONE
DetailsMichael Hanson
1st review completed waiting for response
1st review completed  9/12/2017 DONE
DetailsMichael Hanson
Case Summary (BLD)  9/12/2017 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  9/12/2017 DONE
DetailsMichael Hanson
Permit Ready to Issue  9/12/2017 DONE
All met
Plan assigned to (JAB) Josh8/2/20178/2/20179/6/2017 DEFR
DetailsJosh Bogle
Routing - FIRE8/16/2017 8/29/2017 PASS
DetailsScott Arellano
No comments.
Routing - Erosion and Sediment8/15/2017 8/15/2017 PASS
DetailsAndy J. Long
ESC site map with narrative notes approved. Valid RP and PD designated. Site preparation inspection is required.
Routing - MECHANICAL8/3/2017 8/7/2017 PASS
DetailsTroy James
Routing - PLANNING8/3/2017 8/3/2017 PASS
DetailsSue Cummings
Routing PW Grading-Hillside7/31/2017 8/3/2017 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Melissa Jannusch at ###-####
Routing - PUBLIC WORKS8/3/2017 8/3/2017 PASS
DetailsRachael Beierle
Plan assigned to (BJM)7/28/20177/28/20178/2/2017 DEFR
DetailsBrian McGowan
8/16 sfd Level 2 -needs to go to Josh (Jayo Plan)
Route to Impact Fee Review7/28/20177/31/20178/1/2017 PASS
DetailsMarissa Taylor
Initial residential review of new SFD permits requested for now.
Routing - Addressing7/28/2017 7/31/2017 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  7/28/2017 DONE
Intake Approval  7/28/2017 PASS
Recd Pcfee & Taken To Pln CK  7/28/2017 DONE
Application received 7/28/2017