Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD17-02648
StatusFinaled
Name TK CONSTRUCTION
Site Address 8601 W EMERALD ST Unit: STE 100
Project Namevanilla - Suite #100
Customer Number 
ePlanReviewYes
Description
**(VANILLA – SUITE #100)** NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR CERTIFICATE OF OCCUPANCY PRIOR TO OCCUPYING THE SPACE. Permit is to remodel an existing 2,784 sq. ft. tenant space by dividing it into two separate tenant spaces, this vacant tenant space is to be 1,019 sq. ft. and the remaining 1,765 sq. ft. is to be an occupied tenant space created under BLD17-02526. Approval is contingent upon adhering to the approved plans on file. No work under this permit. Note 1: select tenant demising walls constructed by previous tenant without a permit at storage room hallway by room #104, field verify for compliance. Note 2: future tenant to address the required minimum number of plumbing fixtures per chapter 29 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice8/8/20178/8/20178/10/2017 DONE
DetailsCandy A. Nichols
nothing emailed has valuation of 501.00 or under
BLD-Final8/7/20178/8/20178/8/2017APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Todd Kurns
DOC - Permit Finaled8/8/20178/8/20178/8/2017PPASS
DetailsMike Jordan
FIRE-Final Inspection8/7/20178/8/20178/7/2017APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final8/4/20178/4/20178/4/2017PNR
DetailsMike Jordan
Todd Phone #: ###-####. Fire/life/safety failed.
FIRE-Final Inspection8/4/20178/4/20178/4/2017PFAIL
DetailsTroy Cobbley
Provide city approved plans, remove the thumbturn dead bolt as discussed.
Issue PAID IN FULL permit  8/4/2017 DONE
Plan assigned to (JG)8/1/20178/1/20178/2/2017 PASS
DetailsJavier Guzman
vanilla STE 100, pend PW
Routing - Addressing8/1/2017 8/2/2017 PASS
DetailsDoug Chausow
STE 100
Routing - PUBLIC WORKS8/1/2017 8/2/2017 PASS
DetailsRachael Beierle
1st review completed  8/2/2017 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/2/2017 DONE
Permit Ready to Issue  8/2/2017 DONE
need GC & rev cert of val
Routing - PLAN CHECK8/1/2017 8/1/2017 PASS
DetailsJavier Guzman
Intake Approval  8/1/2017 PASS
DetailsJavier Guzman
Application received  7/31/2017 DONE
Application submitted via PDS Online on Jul 31 2017 10:55AM