BLD-Final | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Mike Jordan
|
|
|
Cal me with questions, this is the one you pre-walked. Crawl exhaust is in attic with the furnace. HVAC said that is ok. Mechanical and electrical signed off. Thank you. Phone #: ###-#### Inspection requested via web by Chris Laraway
|
DOC - Permit Finaled | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 8/6/2018 | 8/6/2018 | 8/6/2018 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Laraway. Needs mech and electrical finals. Also noted that could not find fan for condition crawl space.
|
BLD-Aging Inspection | 6/15/2018 | 6/15/2018 | 6/15/2018 | | PASS |
Mike Jordan
|
|
|
|
BLD-Wall cover | 1/31/2018 | 2/1/2018 | 2/1/2018 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Laraway
|
BLD-Energy code compliance | 2/1/2018 | 2/1/2018 | 2/1/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Laraway
|
BLD-Framing/Rough-in | 1/23/2018 | 1/24/2018 | 1/24/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Laraway
|
Plan Modification Accepted | | | 1/5/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/5/2018 | | 1/5/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 12/18/2017 | 12/19/2017 | 12/19/2017 | A | PASS |
Mike Jordan
|
|
|
Ready for re-inspection on misc blocking ; Bracing. Phone #: ###-#### Inspection requested via web by Chris Laraway
|
BLD-Wall Bracing | 12/14/2017 | 12/15/2017 | 12/15/2017 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Laraway. Missing blocking and fasteners in several areas. recall when ready.
|
BLD-Conference | 11/27/2017 | 11/27/2017 | 11/27/2017 | A | DONE |
Mike Jordan
|
|
|
Neighbor says the contractor is digging right at the property line and her fence is now falling down. Contacted the contractor to let him know that there has been a compliant from the neighbor regarding the fence.
|
BLD-Foundation | 10/18/2017 | 10/18/2017 | 10/18/2017 | P | PART |
Mike Jordan
|
|
|
Pour at 130 // James Phone #: ###-####
|
BLD-Concrete | 10/16/2017 | 10/16/2017 | 10/16/2017 | P | CANC |
Mike Jordan
|
|
|
early as possible- James Phone #: ###-####
|
BLD-Footing | 10/16/2017 | 10/16/2017 | 10/16/2017 | P | PASS |
Mike Jordan
|
|
|
early as possible- James Phone #: ###-####
|
BLD-Footing | 10/13/2017 | 10/16/2017 | 10/16/2017 | A | FAIL |
Mike Jordan
|
|
|
after 9 am please // James Phone #: ###-####. Noted several areas were footing is not 8 inch. min. depth or 16 inches wide.
|
Issue PAID IN FULL permit | | | 10/10/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/2/2017 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2017 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 10/2/2017 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 8/31/2017 | | 10/2/2017 | | DONE |
Michael Hanson
|
|
|
8/16 sfd ePlan - first review completed wait for response
|
Routing - PLAN CHECK | 8/3/2017 | | 10/2/2017 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 9/18/2017 | | FAIL |
Michael Hanson
|
|
|
Multiple change marks concerning structural, inconsistent energy values, wall bracing requirements. MDH
|
Plan assigned to (BJM) | 8/3/2017 | 8/3/2017 | 8/31/2017 | | DEFR |
Brian McGowan
|
|
|
8/16 sfd ePlan
|
Plan Reviewer's activity | | | 8/31/2017 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLANNING | 8/28/2017 | | 8/28/2017 | | PASS |
Sue Cummings
|
|
|
Driveway cannot exceed 33' wide within the entire front setback.
|
Routing - MECHANICAL | 8/7/2017 | | 8/7/2017 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 8/3/2017 | | 8/7/2017 | | FAIL |
Troy James
|
|
|
emailed corrections to TML
|
Route to Impact Fee Review | 8/3/2017 | 8/6/2017 | 8/4/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 8/3/2017 | | 8/4/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/3/2017 | | 8/3/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/3/2017 | | DONE |
|
|
|
|
Intake Approval | | | 8/3/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/3/2017 | | DONE |
|
|
|
|
Application received | | | 7/31/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 31 2017 12:52PM
|
Routing - PLANNING | 8/3/2017 | | | | FAIL |
|
|
|
Needs corrections to driveway width and front setback from edge of common drive.
|