Permit Information
Permit NumberBLD17-02650
StatusFinaled
Name REDCO CONCRETE SOLUTIONS LLC
Site Address 4201 N LENORA ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Special inspection is required to verify that the helical piers are installed per the project plan and specifications. See Special Inspections per attached 310 form. - Permit for installation of two helical piers for a foundation repair. All work per plans, engineering, & local code. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/14/201711/14/201711/14/2017PPASS
DetailsJim Sly
Call to meet // Annie Phone #: ###-####
DOC - Permit Finaled11/14/201711/14/201711/14/2017PPASS
DetailsJim Sly
Engineer OKd for installation of new footings below affected area.
BLD-Final10/13/201710/16/201710/16/2017AFAIL
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Annie Coates
BHB Engineers Andrew Morgan Project 170841 ###-####. MTI final letter basically deferred approval ..........Approval required from Structural Engineer.
BLD-Foundation10/13/201710/13/201710/13/2017PPART
DetailsJim Sly
Helical pier inspection Phone #: ###-#### Inspection requested via web by Annie Coates
Need plan and Special inspection report. Call for final.
Routing PW Grading-Hillside9/8/2017 9/8/2017 PASS
DetailsMelissa Jannusch
Special inspection is required to verify that the helical peirs are installed per the project plan and specifications. See speical inspection per attached 310 form
Permit Ready to Issue  9/8/2017 DONE
DetailsChristina Prado
All requirements met
Issue PAID IN FULL permit  9/8/2017 DONE
DetailsChristina Prado
Plan assigned to (JAB) Josh8/2/20178/2/20179/7/2017 PASS
DetailsJosh Bogle
1st done - need Form 310 (in e-mail dated 8/22)
Routing - PLAN CHECK9/7/2017 9/7/2017 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  9/7/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  9/7/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  9/7/2017 DONE
DetailsJosh Bogle
ESC no - Energy no
Routing Walk-In (PW Hillside)7/31/20177/31/20178/2/2017PFAIL
DetailsJason C. Taylor
Needs geotech report. See PW e-mail to applicant dated 8/1/2017
1st review completed  8/2/2017 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK8/2/2017 8/2/2017 FAIL
DetailsJosh Bogle
Application received 7/31/2017