Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-02662
StatusFinaled
Name BRIGHTON STUDIO INC
Site Address 3379 E TRIFECTA LN
Project NamePP-04-3602 3702
Customer NumberEPLAN BLD17-02605
ePlanReview 
Description
(2 PERMITS FILED UNDER BLD17-02605 IN EPLAN REVIEW) FLOODPLAIN, Permit for the construction of a new 1750 sq. ft., three story (first story 660 sq. ft., second story 1000 sq. ft. 3rd story is 90 sq ft) single family dwelling with 3 bedrooms, 2 bathrooms, approximately 506 sq. ft. of covered patio/porch and a 490 sq. ft. attached garage per the approved plans. SP-02 zoning and setbacks per planning. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/27/20184/27/20184/27/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Braxton Hansen
DOC - Permit Finaled4/27/20184/27/20184/27/2018PPASS
DetailsBrandon Shaw
BLD-Final4/20/20184/20/20184/20/2018ANR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Braxton Hansen
BLD-Final4/16/20184/17/20184/17/2018ACANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Braxton Hansen
BLD-Energy code compliance1/15/20181/16/20181/16/2018APASS
DetailsBrandon Shaw
Inspection requested via web by Erby Gonzales
BLD-Framing/Rough-in1/10/20181/11/20181/11/2018APASS
DetailsBrandon Shaw
OK to insulate
BLD-Wall Bracing12/21/201712/21/201712/21/2017PPASS
DetailsJim Sly
Erby Phone #: ###-####
BLD-Foundation10/30/201710/30/201710/30/2017PPASS
DetailsBrandon Shaw
Doug Phone #: ###-####
BLD-Footing10/20/201710/20/201710/20/2017PPASS
DetailsJim Sly
Doug Phone #: ###-####
Issue PAID IN FULL permit  10/9/2017 DONE
Inspection Record Card- Bld  10/9/2017 DONE
OVERRIDE  9/26/2017  
Plan assigned to (BJM)8/2/20178/2/20179/26/2017 DONE
DetailsBrian McGowan
1st review complete - fail 8/15 sfd level 2 see ePlan on BLD17-02605
Routing - MECHANICAL9/26/2017 9/26/2017 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  9/26/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  9/26/2017 DONE
All met
Routing - MECHANICAL9/25/2017 9/25/2017 FAIL
DetailsTroy James
Previous changemark has not been corrected.
Routing PW Flood Plain8/2/2017 9/22/2017 PASS
DetailsJason C. Taylor
Project has approved LOMR. JCT
Routing - PLAN CHECK9/22/2017 9/22/2017 PASS
DetailsBrian McGowan
Routing - PUBLIC WORKS8/2/2017 9/21/2017 PASS
DetailsRachael Beierle
1st review completed  9/21/2017 FAIL
DetailsBrian McGowan
Lateral is not done as a Townhome.
Routing - PLAN CHECK8/2/2017 9/21/2017 FAIL
DetailsBrian McGowan
Lateral is not done as a Townhome.
Route to Impact Fee Review8/2/20178/5/20178/3/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL8/2/2017 8/2/2017 FAIL
DetailsTroy James
emailed correction to legends mech
Routing - PLANNING8/2/2017 8/2/2017 PASS
DetailsKatelyn Menuge
SUB16-00047 and DRH17-00261
Routing - Addressing8/2/2017 8/2/2017 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  8/2/2017 DONE
Intake Approval  8/2/2017 PASS
Recd Pcfee & Taken To Pln CK  8/2/2017 DONE
Application received 7/31/2017   
Application received 7/31/2017