BLD-Conference | 5/18/2020 | 5/18/2020 | 5/22/2020 | P | DONE |
Tony Young
|
|
|
Screened- Danny Phone #: ###-####
|
BLD-Final | 5/19/2020 | 5/21/2020 | 5/22/2020 | A | PASS |
Tony Young
|
|
|
Screened- Danny Phone #: ###-####
|
DOC - Permit Finaled | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Tony Young
|
|
|
hillside ok from MJ via phone call
|
Telephone call | | | 12/13/2019 | | DONE |
|
|
|
Called and spoke with Kay regarding final fees due. She said she would do research to figure out where these fees are
|
BLD-Conference | 12/9/2019 | 12/10/2019 | 12/10/2019 | P | PART |
Tony Young
|
|
|
Tony.....would like to meet to discuss placement of address for house and ADU 4770 W Hill Rd now 5096 N Collister Dr. ..... Thanks, Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck// address ?s
|
BLD-Conference | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | PART |
Tony Young
|
|
|
Tony! Would like to do a walk through with you for the CO 4770 W Hill Rd Thanks! Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck// walk through on final,, needs hillside approval,, address verification,, hill vs. collister,
|
BLD-Conference | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | PEND |
Tony Young
|
|
|
needs a mech permit for ADU
|
BLD-Conference | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | PART |
Tony Young
|
|
|
Tony! Need to visit on a few items of concern! Phone #: ###-#### Inspection requested via web by Danny Utterbeck,,?s on upcoming change to garage upstairs to living,, also noted that garage is not attached
|
BLD-Framing/Rough-in | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | PASS |
Tony Young
|
|
|
Tony! Need this for Sheetrock cover! Danny please as early as possible! Phone #: ###-#### Inspection requested via web by Danny Utterbeck,, house is ok
|
BLD-Energy code compliance | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | PART |
Tony Young
|
|
|
Tony! Need this for Sheetrock cover! Danny please as early as possible! Phone #: ###-#### Inspection requested via web by Danny Utterbeck,, house only,, ok
|
BLD-Framing/Rough-in | 7/3/2019 | 7/5/2019 | 7/5/2019 | P | PART |
Brandon Shaw
|
|
|
House only- OK to insulate... Detached garage and ADU above, to be added to permit and job description- No Inspection at this time...
|
BLD-Framing/Rough-in | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | NR |
Tony Young
|
|
|
Tony! I had requested a framing inspection early this morning for this afternoon! Not sure what happened! I have the insulation scheduled for tomorrow and have them on hold now! Thank you! Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck// need mechanical pass
|
Routing Walk-In (BLD) | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Josh Bogle
|
|
|
discussed the ADU process
|
BLD-Wall Bracing | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | PASS |
Tony Young
|
|
|
Tony, need shear wall inspection for cover up! I’m working on a house close by if you need me! Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck
|
BLD-Wall Bracing | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | NR |
Tony Young
|
|
|
Tony, need shear wall inspection for cover up! I’m working on a house close by if you need me! Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck
|
BLD-Aging Inspection | 5/30/2019 | 5/30/2019 | 6/3/2019 | | PASS |
Tony Young
|
|
|
|
BLD-Wall Bracing | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | PART |
Tony Young
|
|
|
Concrete at 2pm // Adam Phone #: ###-#### foundation wall for garage,, work in progress
|
BLD-Foundation | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PART |
Tony Young
|
|
|
wall- Adam Phone #: ###-####,, house walls ok
|
BLD-Footing | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | PART |
Tony Young
|
|
|
Adam Phone #: ###-####-pour time 2:00,, work in progress,, ok,, will protect from cold
|
BLD-Footing | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | NR |
Tony Young
|
|
|
Danny ; Phone #: ###-####
|
BLD-Footing | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | NR |
Tony Young
|
|
|
Danny ; Phone #: ###-####,, soils ok now,, not ready
|
PubWorks Subgrade Approval | 11/27/2018 | 11/27/2018 | 11/27/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 11/20/2018 | 11/20/2018 | 11/20/2018 | P | NR |
Tony Young
|
|
|
Concrete at 3 - Adam Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/30/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/30/2018 | | DONE |
|
|
|
|
Extend Review Timeline | | | 3/7/2018 | | DONE |
|
|
|
1st approved 180 day extension per adele. see documents
|
Meeting | | | 2/28/2018 | | DONE |
|
|
|
Letter requesting extension was sent in
|
Telephone call | | | 2/16/2018 | | DONE |
|
|
|
Left a message for Danny recommending that he send in a request for a 180 day extension. informed him that it looks like the review took a bit longer. left permit number, email and phone number
|
OVERRIDE | | | 2/12/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 2/12/2018 | | DONE |
|
|
|
met
|
Plan assigned to (JAB) Josh | 11/20/2017 | 11/20/2017 | 2/9/2018 | | PASS |
Josh Bogle
|
|
|
1st done - lacks needed details, structure & WUI
|
Routing - PLAN CHECK | 2/9/2018 | | 2/9/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2018 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Routing - PLAN CHECK | 2/2/2018 | | 2/2/2018 | | FAIL |
Josh Bogle
|
|
|
need WUI callouts
|
Plan assigned to (BJM) | 10/23/2017 | 10/23/2017 | 11/20/2017 | | DEFR |
Brian McGowan
|
|
|
11/9 sfd L2 ePlan - defered to Josh
|
Routing - PLAN CHECK | 10/23/2017 | | 11/20/2017 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 11/20/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 11/14/2017 | | 11/20/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 10/23/2017 | 10/23/2017 | 10/26/2017 | | PASS |
Erika Akin
|
|
|
Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Routing - MECHANICAL | 10/23/2017 | | 10/26/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/23/2017 | | 10/26/2017 | | PASS |
Celine Acord
|
|
|
per CFH17-00040
|
Route to Impact Fee Review | 10/23/2017 | 10/26/2017 | 10/24/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 10/23/2017 | | 10/24/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/23/2017 | | 10/24/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 10/23/2017 | | 10/23/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Site preparation inspection is required.
|
Plans ACCEPTED BY PLAN TECH | | | 10/23/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/23/2017 | | DONE |
|
|
|
|
Intake Approval | | | 10/23/2017 | | PASS |
|
|
|
|
Intake Approval | | | 9/11/2017 | | FAIL |
|
|
|
Missing Structural Calcs and Erosion Narrative, asked to name the sheets to submittal requirments too
|
Application received | | | 8/2/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 2 2017 1:09PM
|