BLD-Final | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Mike Jordan
|
|
|
Tim Phone #: ###-####. All issues were resolved. Ok for perm occ.
|
BLD-Final | 1/2/2018 | 1/2/2018 | 1/2/2018 | P | NR |
Mike Jordan
|
|
|
Tim Phone #: ###-####. Still needs plumbing final.
|
BLD-Final | 12/27/2017 | 12/27/2017 | 12/27/2017 | P | PART |
Jim Storey
|
|
|
Tim Phone #: ###-#### need signage and vert bar for ada/ plm and mech permits or removed from signoff by office.
|
FIRE-Final Inspection | 12/19/2017 | 12/20/2017 | 12/20/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Tim Phone #: ###-####
|
FIRE-Final Inspection | 12/18/2017 | 12/19/2017 | 12/19/2017 | A | FAIL |
Jim Page
|
|
|
Called point of contact, Tim Phone #: ###-#### but did not get an answer, FIR permit for fire sprinklers needs to be scheduled and in finaled status before life fire safety inspection can be done.
|
BLD-Ceiling Grid Inspection | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | PASS |
Mike Jordan
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 11/3/2017 | 11/6/2017 | 11/6/2017 | A | PASS |
Brandon Shaw
|
|
|
Hold downs in place and special inspection report, for welding, on site at time of inspection.
OK to cover
|
BLD-Framing/Rough-in | 10/26/2017 | 10/26/2017 | 10/26/2017 | P | PART |
Mike Jordan
|
|
|
20 mins heads up- Tim Phone #: ###-####. Needs special inspection for welding and installation of new holdowns. Interior steel stud framed walls ok. noted existing wall is a shear wall. Also noted new beams and tube steel columns installed per the engineering to pick up roof load of existing load bearing wall that has been demolished.
|
Route to Impact Fee Review | 9/16/2017 | 9/19/2017 | 9/21/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Issue PAID IN FULL permit | | | 9/21/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/21/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/18/2017 | | DONE |
|
|
|
MET
NEED
GC-MET
Rev Cert of Val-MET
|
Plan assigned to (CJW) | 8/9/2017 | 8/9/2017 | 9/16/2017 | | PASS |
Carl Westfall
|
|
|
(8k) (Aug 29 - 15 days) (8 sheets) Vermeer Showroom
|
Routing - PLAN CHECK | 8/9/2017 | | 9/16/2017 | | PASS |
Carl Westfall
|
|
|
1st review done
|
1st review completed | | | 9/16/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2017 | | DONE |
|
|
|
|
Routing - FIRE | 8/9/2017 | 8/9/2017 | 8/24/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - Erosion and Sediment | 8/9/2017 | | 8/14/2017 | | PASS |
Andy J. Long
|
|
|
No ESC permit required.
|
Routing - Addressing | 8/9/2017 | | 8/10/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/9/2017 | | 8/10/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 8/9/2017 | | 8/10/2017 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 8/9/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Javier completed pre screen, notified applicant that this is a Major TI. emailed applicant to contact ACHD for any fees due
|
Application received | | | 8/2/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 2 2017 3:24PM
|