BLD-Final | 4/6/2018 | 4/6/2018 | 4/9/2018 | P | PASS |
Jim Sly
|
|
|
Jan Phone #: ###-####
|
DOC - Permit Finaled | 4/9/2018 | 4/9/2018 | 4/9/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 9/13/2017 | 9/13/2017 | 9/13/2017 | P | PASS |
Brandon Shaw
|
|
|
Tim Phone #: ###-####
|
BLD-Footing | 8/29/2017 | 8/29/2017 | 8/29/2017 | P | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-####
|
Routing - PLAN CHECK | 8/9/2017 | | 8/9/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/9/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 8/9/2017 | | DONE |
|
|
|
|
Telephone call | | | 8/9/2017 | | DONE |
|
|
|
Left a message for Tim informing him this permit is ready and fee amount due for issuance
|
Issue PAID IN FULL permit | | | 8/9/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 8/3/2017 | 8/3/2017 | 8/3/2017 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 8/3/2017 | 8/3/2017 | 8/3/2017 | A | FAIL |
Josh Bogle
|
|
|
freestanding carport - needs braced wall engineering
|
1st review completed | | | 8/3/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/3/2017 | | 8/3/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 8/3/2017 | | | |
|
|
|
|