Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-02765
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 6675 S EISENMAN RD
Project NameGowen Indust. Park - Bldg. B
Customer Number 
ePlanReviewYes
Description
(GOWEN INDUSTRIAL PARK – WAREHOUSE BUILDING B – NEW BUILDING) (DRH17-00215) (4-4-18 PLAN MODIFICATION TO DELETE THE 1-HR FIRE RATED CEILING HATCH LOCATED WITHIN THE FIRE RISER ROOM. THE CEILING HATCH WAS TO BE INSTALLED BELOW THE ROOF HATCH WHICH GIVES ACCESS TO ROOF TOP HVAC EQUIPMENT. THE FIRE RISER ROOM IS REQUIRED TO BE SEPARATED FROM THE REST OF THE BUILDING BY A MINIMUM 1-HR FIRE-RESISTANCE-RATED OCCUPANCY SEPARATION. SINCE A TILT-UP CONCRETE WALL PANEL SEPARATES THE FIRE RISER ROOM FROM THE REST OF THE BUILDING, THE ROOF DOES NOT PROVIDE THE REQUIRED SEPARATION. A FIRE RATED CEILING HATCH IS NOT REQUIRED.) The fire sprinkler system is used for building area increase and for fire area. To construct a 41,146 square foot building to be used for office, storage, and perhaps fabrication. A total of four (4) tenant spaces separated by potentially 1-hr interior walls with block-out framing for potential future openings will be created. This permit is not intended to establish a Certificate of Occupancy for any tenant or for any portion of this building. Each tenant is required to apply for their own Certificate of Occupancy. Separate permits for racking over 8 feet tall are also required. Work is to include reinforced concrete footings, reinforced concrete tilt-up panels, reinforced concrete slab on grade, recessed concrete floors with dock levelers at some overhead doors, cantilevered canopies, steel columns, open web steel roof girders, open web steel roof joists, steel roof deck, continuous insulation installed on top of the roof deck, a membrane roof covering, skylights, metal screens for roof top mechanical units, roll-up exterior doors, side-hinged swinging exterior doors, steel exterior landings and stairways at the West exit doors, storefront windows, trash enclosures, unoccupied mezzanine above the office area supported by bearing walls, interior nonbearing walls, four toilet rooms accessible to the disabled, and finishes. Special Inspection is required for soil (excavation and compacted fill), concrete footings (including reinforcing steel), concrete tilt-up panels (including reinforcing steel), anchors post-installed in hardened concrete, and steel (including welding). The work is required to comply with the approved drawings, with the Geotechnical Engineer’s recommendations, with the Structural Calculations, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice10/30/201810/30/201811/7/2018 DONE
DetailsJim Storey
mailed 11-12
BLD-Aging Inspection10/30/201810/30/201810/30/2018 PASS
DetailsJim Storey
DOC - Permit Finaled10/30/201810/30/201810/30/2018PPASS
DetailsJim Storey
BLD-Final6/14/20186/18/20186/18/2018APASS
DetailsJim Storey
Tim Phone #: ###-#### final ok pending pw
Zoning Approval6/18/20186/18/20186/18/2018 PASS
DetailsKatelyn Menuge
FIRE-Final Inspection6/14/20186/15/20186/15/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection complete.

Tim Phone #: ###-####
PubWorks Temp Occupancy Appr6/15/20186/15/20186/15/2018 DONE
DetailsTiffany Lowery
BLD-Final6/14/20186/14/20186/14/2018PPART
DetailsJim Storey
Call prior to going Phone #: 2088634071 >> Inspection requested via mobile web by Dave Minegar ada signage// si and engineer letter completion per design.
FIRE-Final Inspection6/14/20186/14/20186/14/2018PFAIL
DetailsJim Page
Mount knox box as discussed, provide property addressing as discussed, install ceiling tile in southeast office area as discussed.



Dave Phone #: ###-####
CHANGE STATUS TO (ISS)  4/17/2018 DONE
Inspection Record Card- Bld  4/17/2018 DONE
Plan assigned to (CJW)3/27/20183/27/20184/4/2018 PASS
DetailsCarl Westfall
x Gowan Industrial Park Plan Mod
Routing - PLAN CHECK3/27/2018 4/4/2018 PASS
DetailsCarl Westfall
1st plan mod approved
Plan Reviewer's activity  4/4/2018 PASS
1st plan intake approved
Permit Ready to Issue  4/4/2018 DONE
Plan Mod Approved
DO NOT REISSUE
Plan Modification Accepted  3/27/2018 DONE
Remove 1 hour rarted ceiling access hatch
Plan Reviewer's activity  1/24/2018 DONE
Fire Sprinkler Design Criteria for racking has been evaluated and approved in permit FIR18-00051
Inspection Record Card- Bld  12/14/2017 DONE
Issue PAID IN FULL permit  12/14/2017 DONE
Plan assigned to (CJW)8/21/20178/21/201712/11/2017 PASS
DetailsCarl Westfall
(2nd done) (Sept 22 - 25 days) (93 sheets) Gowen Industrial Bldg B
Routing - Design Review12/8/2017 12/11/2017 PASS
DetailsKatelyn Menuge
PLANS/APPL TAKEN TO FRONT DESK  12/11/2017 DONE
Permit Ready to Issue  12/11/2017 DONE
NEED
ACHD

met
GC Form
Rev Cert of Val
Routing - PLAN CHECK12/6/2017 12/8/2017 PASS
DetailsCarl Westfall
Plan resubmittals received  12/6/2017 DONE
Plan resubmittals requested  11/20/2017 DONE
Routing PW Sewer Design11/8/2017 11/14/2017 PASS
DetailsKyle S. Rosenmeyer
Routing Off Site - STRUCTURAL11/8/2017 11/10/2017 PASS
DetailsCarl Westfall
Chris Holladay (AHJ)
Routing - PLAN CHECK11/7/2017 11/8/2017 PASS
DetailsCarl Westfall
Pending structural
Routing - Design Review11/8/2017 11/8/2017 FAIL
DetailsKatelyn Menuge
Need DR modification approval, CUP approval and ROS completed.
Plan resubmittals received  11/7/2017 DONE
Routing PW Sewer Design10/24/2017 10/31/2017 FAIL
DetailsKyle S. Rosenmeyer
Update utility sheets using approved plans from GRD17-00045
Plan resubmittals requested  10/31/2017 DONE
Routing - FIRE10/24/2017 10/30/2017 PASS
DetailsScott Arellano
Attached revised comments to case
Routing Off Site - STRUCTURAL10/24/2017 10/27/2017 FAIL
DetailsCarl Westfall
Chris Holladay (AHJ)
Routing - PLAN CHECK10/23/2017 10/24/2017 PEND
DetailsCarl Westfall
Structural review
Routing - PLANNING Land Div10/24/2017 10/24/2017 PASS
DetailsTodd Tucker
Routing - Design Review10/24/2017 10/24/2017 FAIL
DetailsKatelyn Menuge
Corrections required and building permit cannot be issued until ROS is completed.
Plan resubmittals received  10/23/2017 DONE
Route to Impact Fee Review10/20/201710/23/201710/20/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing PW Drainage10/7/2017 10/20/2017 PASS
DetailsJason C. Taylor
1st review completed  10/20/2017 DONE
Plan resubmittals requested  10/20/2017 DONE
Routing - PLAN CHECK8/21/2017 10/12/2017 FAIL
DetailsCarl Westfall
Revised drawings required (9 days over the 30 day time frame)
Routing PW Environmental8/22/2017 9/25/2017 PASS
DetailsRick Christenson
Routing PW Sewer Design8/22/2017 9/6/2017 FAIL
DetailsKyle S. Rosenmeyer
Routing - FIRE8/21/20178/21/20179/1/2017 FAIL
DetailsScott Arellano
Emailed plan review report to architect. Attached report to case.
Routing Off Site - STRUCTURAL8/21/2017 8/31/2017 FAIL
DetailsCarl Westfall
Chris Holladay (AHJ)
Routing - PLUMBING8/21/2017 8/24/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing PW Street Lights8/22/2017 8/24/2017 PASS
DetailsTom Marshall
Routing PW Solid Waste8/22/2017 8/22/2017 PASS
DetailsEvan Carpenter
Routing PW Drainage8/22/2017 8/22/2017 CANC
DetailsBrian Murphy
jason taylor will do
Routing - PUBLIC WORKS8/21/2017 8/22/2017 PASS
DetailsRachael Beierle
Routing - MECHANICAL8/21/2017 8/22/2017 PASS
DetailsTroy James
Routing - Design Review8/21/2017 8/22/2017 FAIL
DetailsKatelyn Menuge
Other planning approvals required and landscape corrections needed.
Routing - Erosion and Sediment8/21/2017 8/21/2017  
DetailsAndy J. Long
No review required. See GRD17-00045. ESC17-01200 issued with early start/rough grading permit.
Routing - PLANNING8/21/2017 8/21/2017  
DetailsCody Riddle
No review required
Routing - PLANNING Land Div8/21/2017 8/21/2017 FAIL
DetailsTodd Tucker
The Building Permit cannot be issued until the parcels are combined into one parcel.
Routing - Addressing8/21/2017 8/21/2017 PASS
DetailsDoug Chausow
Intake Approval  8/21/2017 PASS
Telephone call  8/17/2017 DONE
Will called and asked me to change the valuation for the intake fees-see e plan V2 application for changes
Intake Approval  8/16/2017 FAIL
DetailsJulie Romig
To complete your application, provided the following:
1. Mechanical heating/cooling load calculations or indicate where they are located on checklist.
Intake Approval  8/14/2017 FAIL
(8-14-17) Please download the 502 Plan Intake Checklist from the webpage for the City of Boise. Please completely fill out the form verifying that all required items have been provided. Upload the completed form into the Documents Folder of ePlanReview and then complete your task. Thanks.
Application received  8/7/2017 DONE
Application submitted via PDS Online on Aug 7 2017 2:46PM