BLD-Final | 10/10/2017 | 10/11/2017 | 10/11/2017 | A | DONE |
Tony Young
|
|
|
Martin Phone #: ###-####
|
DOC - Permit Finaled | 10/11/2017 | 10/11/2017 | 10/11/2017 | P | PASS |
Tony Young
|
|
|
|
Routing Walk-In (BLD) | 8/8/2017 | 8/8/2017 | 8/8/2017 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/8/2017 | | 8/8/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/8/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/8/2017 | | |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 8/8/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/8/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 8/7/2017 | 8/7/2017 | 8/7/2017 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 8/7/2017 | 8/7/2017 | 8/7/2017 | P | FAIL |
Brian McGowan
|
|
|
Need the specification sheets for the other componants, letter from the engineer who designed the existing roof, letter from S-5 clamps showing it works for his roof style.
|
1st review completed | | | 8/7/2017 | | FAIL |
Brian McGowan
|
|
|
Need the specification sheets for the other componants, letter from the engineer who designed the existing roof, letter from S-5 clamps showing it works for his roof style.
|
Routing - PLAN CHECK | 8/7/2017 | | 8/7/2017 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 8/7/2017 | | | |
|
|
|
|