Print Statement | | | 12/3/2018 | | DONE |
|
|
|
|
First Notice | | 10/12/2018 | 11/6/2018 | | DONE |
|
|
|
mailed 11-12
|
Print Occupancy Form | | | 10/2/2018 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/2/2018 | | DONE |
|
|
|
|
BLD-Final | 9/26/2018 | 9/26/2018 | 9/26/2018 | P | PASS |
Mike Jordan
|
|
|
Call half hour before to meet // Mike Phone #: ###-####. All issues resolved. OK for perm occ.
|
Temporary Occupancy | 8/24/2018 | 11/22/2018 | 8/24/2018 | | DONE |
Candy A. Nichols
|
|
|
|
Temporary Occupancy | 8/24/2018 | 11/22/2018 | 8/24/2018 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 6/27/2018 | 6/28/2018 | 6/28/2018 | P | PART |
Mike Jordan
|
|
|
I am at Albertson''s on Broadway, so please give a time frame on we you think you might be onsite, so i can head that way.Thanks Phone #: ###-#### Inspection requested via web by Mike Beeson. Ok for temp occ. Needs to provide ADA compliant service desk at main eneterance.
|
FIRE-Final Inspection | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | FAIL |
Troy Cobbley
|
|
|
Remove the deadbolts from doors 102A and 119A and provide with single action, ADA compliant, hardware. Remove the exit sign in the Hallway that directs people to the Service Bays. Provide exit sign at door 102A as per sheet E2.0L. Remove all of the padlock haps.
Please contact Tim Toups at the phone number listed. Phone #: ###-#### Inspection requested via web by Philip Allen
|
FIRE-Conference | 5/11/2018 | 5/11/2018 | 5/11/2018 | P | DONE |
Troy Cobbley
|
|
|
I spoke with the project superintendant about several existing fire alarm notification devices being overspaced. These devices were outside of the project related fire alarm permit scope of work. The issues will need to be addressed prior to a life safety sign off since the building scope of work is an Request for Occupancy for the entire building.
|
BLD-Ceiling Grid Inspection | 4/11/2018 | 4/12/2018 | 4/12/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD-Framing/Rough-in | 3/8/2018 | 3/9/2018 | 3/9/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Mike Beeson. hard lid framing ok.
|
BLD-Framing/Rough-in | 3/5/2018 | 3/6/2018 | 3/6/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Mike Beeson
|
Meeting | | | 2/2/2018 | | DONE |
|
|
|
Sent in request for 180 day extension
|
Issue PAID IN FULL permit | | | 2/2/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/2/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/2/2018 | | DONE |
|
|
|
|
Expiration Notice | 1/18/2018 | 2/8/2018 | 1/18/2018 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (JG) | 8/16/2017 | 8/16/2017 | 9/1/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 8/29 L2 Dennis Dillon Maserati ePlan
|
Routing - PLAN CHECK | 9/1/2017 | | 9/1/2017 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/1/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/1/2017 | | DONE |
|
|
|
MET
NEED:
GC
rev cert of val
|
Route to Impact Fee Review | 8/30/2017 | 9/2/2017 | 8/31/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 8/30/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 8/16/2017 | 8/16/2017 | 8/29/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - PLAN CHECK | 8/16/2017 | | 8/29/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Erosion and Sediment | 8/16/2017 | | 8/18/2017 | | PASS |
Andy J. Long
|
|
|
no review required. no permit required due to no exterior excavation.
|
Routing - Design Review | 8/16/2017 | | 8/17/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00197
|
Intake Approval | | | 8/16/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Julie completed pre screen
|
Routing - MECHANICAL | 8/16/2017 | | 8/16/2017 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 8/16/2017 | | 8/16/2017 | | PASS |
Doug Chausow
|
|
|
Correct address is 9485 W Fairview Ave.
|
Routing - PUBLIC WORKS | 8/16/2017 | | 8/16/2017 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 8/8/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 8 2017 10:48AM
|