BLD-Final | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | PASS |
Mike Jordan
|
|
|
Chris Phone #: ###-####
|
DOC - Permit Finaled | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 10/9/2017 | 10/10/2017 | 10/10/2017 | A | PASS |
Mike Jordan
|
|
|
Grendle Phone #: ###-####. Exterior frame only. Will inspect the remainder on final.
|
BLD-Footing | 10/3/2017 | 10/4/2017 | 10/4/2017 | P | PART |
Mike Jordan
|
|
|
Grindle Phone #: ###-####. Due to ground conditions, contractor was unable to get to the required depth on the holes. Contractor to provide engineering for alternate depths.
|
OVERRIDE | | | 8/8/2017 | | |
|
|
|
|
Routing Walk-In (Zoning) | 8/8/2017 | 8/8/2017 | 8/8/2017 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 8/8/2017 | 8/8/2017 | 8/8/2017 | P | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 8/8/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/8/2017 | | 8/8/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/8/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/8/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 8/8/2017 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 8/8/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | 8/8/2017 | | | |
|
|
|
|