Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-02790
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 3539 S CADDIS WAY
Project Namehc 26-2
Customer Number 
ePlanReviewYes
Description
WUI VALLEY, ZONE "B" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 1927 sq. ft., two story (first story 695 sq. ft., second story 1225 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 7 sq. ft. of covered patio/porch and a 510 sq. ft. attached garage per the approved plans, plan review report and any notations. SP-01 zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/6/20183/7/20183/7/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled3/7/20183/7/20183/7/2018PPASS
DetailsBrandon Shaw
BLD-Energy code compliance12/28/201712/29/201712/29/2017APASS
DetailsBrandon Shaw
11am please. Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in12/27/201712/28/201712/28/2017APEND
DetailsBrandon Shaw
Need engineering apprval for cut floor joist at main enrtyway

OK to insulate
BLD-Framing/Rough-in12/21/201712/22/201712/22/2017AFAIL
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick supplied wrong engineering for trusses/ no sheer/bearing wall design submited.
BLD-Framing/Rough-in12/20/201712/21/201712/21/2017AFAIL
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick bearing and sheer wall center of building void by hvac/ entry floor joist void by canlight have engineering to resolve/ no truss engineering on site.
BLD-Framing/Rough-in12/19/201712/20/201712/20/2017PNR
DetailsBrandon Shaw
Foam seal and shear corrections to be done
BLD-Wall Bracing12/10/201712/11/201712/11/2017APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Foundation10/4/201710/4/201710/4/2017PPASS
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing10/3/201710/3/201710/3/2017PPASS
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
OVERRIDE  9/28/2017  
Issue PAID IN FULL permit  9/28/2017 DONE
Inspection Record Card- Bld  9/28/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/28/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  9/28/2017 DONE
Plan assigned to (RDP)8/31/20178/31/20179/27/2017 DEFR
DetailsMichael Hanson
8/22 sfd ePlan
Plan assigned to (M_H)9/26/2017 9/27/2017 DONE
DetailsMichael Hanson
8/22 sfd ePlan
1st review completed  9/27/2017 DONE
DetailsMichael Hanson
Routing - PLAN CHECK8/9/2017 9/27/2017 PASS
DetailsBrian McGowan
Plan assigned to (BJM)8/9/20178/9/20178/31/2017 DEFR
DetailsBrian McGowan
8/22 sfd ePlan
Plan Reviewer's activity  8/31/2017 DONE
DetailsMichael Hanson
Routing - MECHANICAL8/9/2017 8/15/2017 PASS
DetailsTroy James
Route to Impact Fee Review8/9/20178/12/20178/10/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING8/9/2017 8/10/2017 PASS
DetailsSue Cummings
Routing - Addressing8/9/2017 8/10/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/9/2017 8/10/2017 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  8/9/2017 DONE
Intake Approval  8/9/2017 PASS
Recd Pcfee & Taken To Pln CK  8/9/2017 DONE
Application received  8/8/2017 DONE
Application submitted via PDS Online on Aug 8 2017 3:11PM