Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-02817
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 6663 S EISENMAN RD
Project NameGowen Indust. Park - Bldg. C
Customer Number 
ePlanReviewYes
Description
(GOWEN INDUSTRIAL PARK – WAREHOUSE BUILDING C – NEW BUILDING) (DRH17-00215) (6-4-18 PLAN MODIFICATION TO REVISE THE OFFICE AREA WITHIN THE SOUTH SHELL TENANT SPACE OF BUILDING “C” TO HAVE ONLY TWO OFFICES (144 SQUARE FEET EACH), AN OPEN OFFICE AREA (579 SQUARE FEET), AND NO BREAK ROOM. THE TOTAL OFFICE AREA WILL BE REDUCED BACK TO 1,010 SQUARE FEET AS WAS ORIGINALLY PROPOSED. WORK INCLUDES INTERIOR NONBEARING WALLS, NEW INTERIOR DOORS WITH TEMPERED GLASS SIDELIGHTS, CHANGES TO THE HVAC SYSTEM, ETC.) (5-10-18 PLAN MODIFICATION TO EXPAND INTO THE WAREHOUSE AREA THE FORMERLY APPROVED 1,010 SQUARE FOOT OFFICE AREA WITHIN THE SOUTH SHELL TENANT SPACE OF BUILDING “C” BY 247 SQUARE FEET TO 1,257 SQUARE FEET AND TO CREATE TWO OFFICES (125 SQUARE FEET EACH) AND A BREAK ROOM (225 SQUARE FEET) IN ADDITION TO THE 646 SQUARE FOOT OPEN OFFICE AREA AND THE RESTROOMS. WORK INCLUDES NEW DOORS, CHANGES TO THE HVAC SYSTEM (2 ADDITIONAL FAN COIL UNITS AND 1 ADDITIONAL HEAT PUMP), AND CHANGES TO THE ELECTRIC LIGHTING (NEW LIGHT FIXTURES AND OCCUPANT SENSORS WITH MANUAL SWITCHES). TO PROVIDE 20 MORE PARKING SPACES IN THE EAST PARKING LOT OF BUILDING “C” TO A TOTAL OF 53 SPACES. AT LEAST 3 PARKING SPACES ACCESSIBLE TO THE DISABLED WITH ACCESS AISLES ARE REQUIRED. AT LEAST 1 OF THOSE 3 IS REQUIRED TO BE VAN ACCESSIBLE TO THE DISABLED.) (4-4-18 PLAN MODIFICATION TO DELETE THE 1-HR FIRE RATED CEILING HATCH LOCATED WITHIN THE FIRE RISER ROOM. THE CEILING HATCH WAS TO BE INSTALLED BELOW THE ROOF HATCH WHICH GIVES ACCESS TO ROOF TOP HVAC EQUIPMENT. THE FIRE RISER ROOM IS REQUIRED TO BE SEPARATED FROM THE REST OF THE BUILDING BY A MINIMUM 1-HR FIRE-RESISTANCE-RATED OCCUPANCY SEPARATION. SINCE A TILT-UP CONCRETE WALL PANEL SEPARATES THE FIRE RISER ROOM FROM THE REST OF THE BUILDING, THE ROOF DOES NOT PROVIDE THE REQUIRED SEPARATION. A FIRE RATED CEILING HATCH IS NOT REQUIRED.) The fire sprinkler system is used for building area increase and for fire area. To construct a 51,402 square foot building to be used for office, storage, and perhaps fabrication. A total of five (5) tenant spaces separated by potentially 1-hr interior walls with block-out framing for potential future openings will be created. This permit is not intended to establish a Certificate of Occupancy for any tenant or for any portion of this building. Each tenant is required to apply for their own Certificate of Occupancy. Separate permits for racking over 8 feet tall are also required. Work is to include reinforced concrete footings, reinforced concrete tilt-up panels, reinforced concrete slab on grade, recessed concrete floors with dock levelers at some overhead doors, cantilevered canopies, steel columns, open web steel roof girders, open web steel roof joists, steel roof deck, continuous insulation installed on top of the roof deck, a membrane roof covering, skylights, metal screens for roof top mechanical units, roll-up exterior doors, side-hinged swinging exterior doors, steel exterior landings and stairways at the West exit doors, storefront windows, trash enclosures, unoccupied mezzanine above the office area supported by bearing walls, interior nonbearing walls, four toilet rooms accessible to the disabled, and finishes. Special Inspection is required for soil (excavation and compacted fill), concrete footings (including reinforcing steel), concrete tilt-up panels (including reinforcing steel), anchors post-installed in hardened concrete, and steel (including welding). The work is required to comply with the approved drawings, with the Geotechnical Engineer’s recommendations, with the Structural Calculations, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice7/19/20187/19/20188/8/2018 DONE
DetailsJim Storey
mailed 8-10-18
BLD-Final7/18/20187/19/20187/19/2018APASS
DetailsJim Storey
Tim Brewer Phone #: ###-####
DOC - Permit Finaled7/19/20187/19/20187/19/2018PPASS
DetailsJim Storey
PubWorks Occupancy Approval7/19/20187/19/20187/19/2018 DONE
DetailsTiffany Lowery
FIRE-Final Inspection7/17/20187/18/20187/18/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is located by the fire pump/riser room. Final life fire safety inspection complete.

Tim Phone #: ###-####
Zoning Approval7/17/20187/17/20187/17/2018 PASS
DetailsKatelyn Menuge
BLD-Ceiling Grid Inspection7/2/20187/3/20187/3/2018PPASS
DetailsBrandon Shaw
Requests 1PM - John Phone #: ###-####
Plan assigned to (CJW)5/21/20185/21/20186/6/2018 PASS
DetailsCarl Westfall
x Plan Modification - Gowen Industrial Park
Routing - PLAN CHECK6/4/2018 6/6/2018 PASS
DetailsCarl Westfall
Plan Reviewer's activity  6/6/2018 PASS
Approved the 3rd plan mod
Permit Ready to Issue  6/6/2018 DONE
Plan Mod Approved
DO NOT REISSUE
CHANGE STATUS TO (ISS)  6/6/2018 DONE
Inspection Record Card- Bld  6/6/2018 DONE
Intake Approval  6/4/2018 FAIL
DetailsJulie Romig
Plan Mod #3: 1. Sheets G102, A701, E001 are listed as revised in the application, but new sheets were not found. Please upload.
2. Re-upload sheets A102, A901, M001 with the same file name as the sheet it is replacing. Sheets named differently and uploaded on 6/1 have been deleted.
Intake Approval  6/4/2018 PASS
Plan Modification Accepted  6/1/2018 DONE
Workflow in ePlanReview received
BLD-Framing/Rough-in5/24/20185/25/20185/25/2018APASS
DetailsJim Storey
John-south office-customer says this is not for the plan mod that''s in for review Phone #: ###-####
Plan Modification Accepted  5/21/2018 DONE
Plan modification to modified south office to only have two offices and no break room.
BLD-Conference5/15/20185/15/20185/15/2018PPASS
DetailsJim Storey
Extend Permit 90/180 days5/15/20185/15/20185/15/2018PPASS
DetailsJim Storey
to keep permit from exp.
CHANGE STATUS TO (ISS)  5/14/2018 DONE
Inspection Record Card- Bld  5/14/2018 DONE
Meeting  5/11/2018  
sent an email to david recommending to send in a request for an extension if permit is not going to be paid for and picked up in ten days
Plan assigned to (CJW)4/26/20184/26/20185/10/2018 PASS
DetailsCarl Westfall
x plan mod (1st IBC done - routed back to applicant)
Routing - PLAN CHECK5/9/2018 5/10/2018 PASS
DetailsCarl Westfall
Routing - Design Review5/10/2018 5/10/2018 PASS
DetailsKatelyn Menuge
DRH17-00215
Plan Reviewer's activity  5/10/2018 PASS
2nd plan mod approved
Permit Ready to Issue  5/10/2018 DONE
plan mod please do not re issue
BLD-Conference5/9/20185/9/20185/9/2018PPASS
DetailsJim Storey
John-fire riser room-fire rated walls penetration-as per John this has nothing to do with the plan mod in for review Phone #: ###-####
BLD-Other5/8/20185/9/20185/9/2018ANR
DetailsJim Storey
John-fire riser room-fire rated walls penetration-as per John this has nothing to do with the plan mod in for review Phone #: ###-####
Plan resubmittals received  5/9/2018 DONE
Plan resubmittals requested  5/3/2018 DONE
Routing PW Drainage4/27/2018 5/2/2018 PASS
DetailsJason C. Taylor
see odi grading approval
Routing PW Solid Waste5/1/2018 5/2/2018 PASS
DetailsEvan Carpenter
Routing PW Sewer Design5/1/2018 5/2/2018 PASS
DetailsDeAnn Brown
Routing PW Street Lights5/1/2018 5/2/2018 PASS
DetailsTom Marshall
Routing - PUBLIC WORKS5/1/2018 5/1/2018 PASS
DetailsRachael Beierle
Routed Only
Routing - MECHANICAL4/27/2018 5/1/2018 PASS
DetailsChad Schwendiman
Routing PW Sewer Rating5/1/2018 5/1/2018 PASS
DetailsMorgan Webb
NO PLUMBING FIXTURES IN BREAK ROOM
Routing - Design Review4/27/2018 4/30/2018 FAIL
DetailsKatelyn Menuge
Provide the additional required accessible parking stalls, bicycle stalls, and an updated Building B planting plan. Landscape planters shall be a minimum of 8 feet wide measured inside of curb and provide one Class II tree if serving a single row of parking or two Class II trees if serving a double row of parking.
Routing - PLAN CHECK4/26/2018 4/27/2018 PASS
DetailsCarl Westfall
2nd plan mod approved
Plan Modification Accepted  4/26/2018 DONE
modified south office to include 2 offices and a break room.
Modified east parking lot to have more spaces.
Plan assigned to (CJW)3/27/20183/27/20184/4/2018 PASS
DetailsCarl Westfall
x Gowan Industrial Park Plan Mod
Routing - PLAN CHECK3/27/2018 4/4/2018 PASS
DetailsCarl Westfall
1st plan mod approved
Plan Reviewer's activity  4/4/2018 DONE
1st plan mod approved
Permit Ready to Issue  4/4/2018 DONE
Plan Mod Approved
DO NOT REISSUE
Plan Modification Accepted  3/27/2018 DONE
Remove 1 hour rarted ceiling access hatch
BLD-Footing11/21/201711/22/201711/22/2017APASS
DetailsJim Storey
around 11 please- John Phone #: ###-#### mti si pending report
Inspection Record Card- Bld  11/20/2017 DONE
Issue PAID IN FULL permit  11/20/2017 DONE
Plan assigned to (CJW)8/21/20178/21/201711/17/2017 PASS
DetailsCarl Westfall
(2nd done) (Sept 22 - 25 days) (93 sheets) Gowen Industrial Bldg C
Routing - Design Review11/16/2017 11/17/2017 PASS
DetailsSarah Schafer
Re-routed to Sarah - Record of Survey was completed and building permit was approved through DR.
PLANS/APPL TAKEN TO FRONT DESK  11/17/2017 DONE
Permit Ready to Issue  11/17/2017 DONE
NEED
ACHD


MET
RP
GC FORM
REVISE CERT
Routing PW Sewer Design11/7/2017 11/14/2017 PASS
DetailsKyle S. Rosenmeyer
Routing Off Site - STRUCTURAL11/7/2017 11/10/2017 PASS
DetailsCarl Westfall
Chris Holladay
Routing - Design Review11/7/2017 11/8/2017 FAIL
DetailsKatelyn Menuge
Need ROS completed.
Plan resubmittals received  11/7/2017 DONE
Routing - PLAN CHECK11/7/2017 11/7/2017 PASS
DetailsCarl Westfall
Pending structural
Routing PW Sewer Design10/24/2017 10/31/2017 FAIL
DetailsKyle S. Rosenmeyer
Update utility plans using approved utility drawings from GRD17-00045.
Plan resubmittals requested  10/31/2017 DONE
Routing - FIRE10/24/2017 10/30/2017 PASS
DetailsScott Arellano
Attached revised comments to case
Routing Off Site - STRUCTURAL10/24/2017 10/27/2017 FAIL
DetailsCarl Westfall
Chris Holladay
Routing - PLAN CHECK10/23/2017 10/24/2017 PASS
DetailsCarl Westfall
pending structural
Routing - PLANNING Land Div10/24/2017 10/24/2017 PASS
DetailsTodd Tucker
Routing - Design Review10/24/2017 10/24/2017 FAIL
DetailsKatelyn Menuge
Corrections Required and need ROS completed prior to building permit issuance
Plan resubmittals received  10/23/2017 DONE
Route to Impact Fee Review10/20/201710/23/201710/20/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing PW Drainage8/22/2017 10/20/2017 PASS
DetailsJason C. Taylor
1st review completed  10/20/2017 DONE
Plan resubmittals requested  10/20/2017 DONE
Routing - PLAN CHECK8/21/2017 10/13/2017 FAIL
DetailsCarl Westfall
Revised drawings required
Routing PW Environmental8/22/2017 9/21/2017 PASS
DetailsRick Christenson
Routing PW Sewer Design8/22/2017 9/6/2017 FAIL
DetailsKyle S. Rosenmeyer
Routing - FIRE8/21/20178/21/20179/1/2017 FAIL
DetailsScott Arellano
Emailed architect correction item and plan review report. Attached report to case.
Routing Off Site - STRUCTURAL8/21/2017 8/31/2017 FAIL
DetailsCarl Westfall
Chris Holladay
Routing - PLUMBING8/21/2017 8/24/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing PW Street Lights8/22/2017 8/24/2017 PASS
DetailsTom Marshall
Routing PW Solid Waste8/22/2017 8/22/2017 PASS
DetailsEvan Carpenter
Routing PW Drainage8/22/2017 8/22/2017 CANC
DetailsBrian Murphy
JASON TAYLOR WILL REVIEW
Routing - PUBLIC WORKS8/21/2017 8/22/2017 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment8/21/2017 8/22/2017 CANC
DetailsAndy J. Long
No ESC plan review for this building, part of larger project. Need to have ESC plan submitted with GRD17-00045 approved before this permit can be issued. If buildings to be built seperately, each BLD will need an individual ESC permit.
Routing - MECHANICAL8/21/2017 8/22/2017 PASS
DetailsChad Schwendiman
Routing - Design Review8/21/2017 8/22/2017 FAIL
DetailsKatelyn Menuge
Other planning approvals required and corrections needed to landscape.
Intake Approval  8/21/2017 PASS
Routing - PLANNING8/21/2017 8/21/2017 CANC
DetailsCody Riddle
No review required
Routing - PLANNING Land Div8/21/2017 8/21/2017 FAIL
DetailsTodd Tucker
The Building Permit cannot be issued until the parcels are combined into one parcel.
Routing - Addressing8/21/2017 8/21/2017 PASS
DetailsDoug Chausow
Intake Approval  8/12/2017 FAIL
2nd Pre-screen 8/12/17
Please provide a site plan, landscape plans and plant schedule that do not indicate for reference only as the building and landscape approvals occur under the building permit and not the GRD permit.
Provide an interior and exterior lighting compliance per IECC Comcheck.
Intake Approval  8/11/2017 FAIL
Please provide the completed form 502 checklist with all applicable items.
Application received  8/8/2017 DONE
Application submitted via PDS Online on Aug 8 2017 8:20PM