BLD-Final | 8/3/2018 | 8/6/2018 | 8/6/2018 | A | PASS |
Mike Jordan
|
|
|
Dragon Phone #: ###-####. All issues have been resolved.
|
DOC - Permit Finaled | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 8/6/2018 | 8/6/2018 | 8/6/2018 | A | DONE |
Mike Jordan
|
|
|
4.4ACH @50pa
|
BLD-Final | 7/30/2018 | 7/31/2018 | 7/31/2018 | P | FAIL |
Mike Jordan
|
|
|
Saric Dragan Phone #: ###-####. Needs blower door test. Needs to firecailk all penetrations from common wall of garage and ceiling. Still needs mech. final.
|
BLD-Energy code compliance | 3/20/2018 | 3/21/2018 | 3/21/2018 | P | PASS |
Mike Jordan
|
|
|
Dragan-be sure to do insulation also Phone #: ###-####
|
BLD-Framing/Rough-in | 3/20/2018 | 3/21/2018 | 3/21/2018 | P | PASS |
Mike Jordan
|
|
|
Dragan-be sure to do insulation also-phone is ###-####
|
BLD-Framing/Rough-in | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | FAIL |
Mike Jordan
|
|
|
Complete lateral bracing on A02 trusses. Fireblock behind conelaed space at ceiling level behind shower/tub masterbath. Foam gas pipe and romex penetration at top plate behind furnace. Correction notice posted. Ok to insulate.
|
BLD-Framing/Rough-in | 3/8/2018 | 3/9/2018 | 3/9/2018 | P | FAIL |
Mike Jordan
|
|
|
Call half hour before // Drangan Phone #: ###-####. No truss engineering.
|
BLD-Framing/Rough-in | 3/5/2018 | 3/6/2018 | 3/6/2018 | A | NR |
Mike Jordan
|
|
|
Dragon-please call 30 mintues prior to meet Phone #: ###-####. Needs to complete airseal pak first.
|
BLD-Wall Bracing | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
Mike Jordan
|
|
|
Dragan Phone #: ###-####
|
BLD-Energy code compliance | 12/27/2017 | 12/28/2017 | 12/28/2017 | A | PASS |
Mike Jordan
|
|
|
Sebastian Phone #: ###-####. Rigid insulation on interior side of stemwall and vapor barrier for slab on grade.
|
BLD-Foundation | 11/22/2017 | 11/24/2017 | 11/24/2017 | A | PASS |
Jim Sly
|
|
|
Sebation Phone #: ###-####
|
BLD-Footing | 11/21/2017 | 11/22/2017 | 11/22/2017 | A | PART |
Mike Jordan
|
|
|
SEBATION Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/30/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/26/2017 | | |
|
|
|
|
OVERRIDE | | | 9/19/2017 | | |
|
|
|
|
Plan assigned to (AJS) | 9/8/2017 | 9/8/2017 | 9/19/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
9/20 sfd L1 paper
|
1st review completed | | | 9/19/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 9/19/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/19/2017 | | DONE |
|
|
|
Need
RP
|
Inspection Record Card- Bld | | | 9/19/2017 | | DONE |
|
|
|
|
Telephone call | | | 9/19/2017 | | DONE |
|
|
|
called Drangan to let know permit is ready
|
Routing - PLAN CHECK | 8/16/2017 | | 9/19/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Plan assigned to (BJM) | 9/7/2017 | 9/7/2017 | 9/8/2017 | | DEFR |
Brian McGowan
|
|
|
9/20 sfd L1 paper
|
Plans ACCEPTED BY PLAN TECH | | | 9/7/2017 | | DONE |
|
|
|
|
Intake Approval | | | 9/7/2017 | | PASS |
|
|
|
|
Route to Impact Fee Review | 8/16/2017 | 8/19/2017 | 8/17/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 8/15/2017 | | 8/16/2017 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 8/15/2017 | | 8/15/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 8/15/2017 | | 8/15/2017 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 8/14/2017 | | 8/14/2017 | | PASS |
Laura Hunter
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/11/2017 | | DONE |
|
|
|
|
Application received | | 8/11/2017 | | | |
|
|
|
|