Third Notice | | 3/10/2020 | 3/11/2020 | | DONE |
|
|
|
This permit finaled on the web by Chris Witt
|
Third Notice | | 2/18/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
Third Notice | | 1/29/2020 | 2/7/2020 | | DONE |
|
|
|
mailed 2-10-20 (spoke with tiffany. gc said they would take care of online, but haven't yet)
|
Telephone call | | | 1/24/2020 | | DONE |
|
|
|
Emailed Chris with Petra Inc to confirm if the final value that was submitted inculdes the foundation and grading permits as well.
|
Second Notice | | 12/6/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
First Notice | | 11/10/2019 | 11/26/2019 | | DONE |
|
|
|
mailed 12-2-19
|
BLD-Final | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####. Ok for perm occ.
|
PubWorks Occupancy Approval | 10/31/2019 | 10/31/2019 | 10/31/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 10/31/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Jason Phone #: ###-####
|
BLD-Final | 9/16/2019 | 9/17/2019 | 9/17/2019 | P | PEND |
Mike Jordan
|
|
|
John Phone #: ###-####. Insulation under lavs completed. Ok for final when the project related fire alarm permit has finaled.
|
FIRE-Final Inspection | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | FAIL |
Troy Cobbley
|
|
|
The exit discharge light has been added as per the previous correction notice. Still need the project related fire alrm permit addressed.
John Phone #: ###-####
|
BLD-Conference | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | DONE |
Mike Jordan
|
|
|
John Phone #: ###-####. A correction notice was issued to provide insulation under sinks in all ADA bathrooms.
|
Zoning Approval | 9/12/2019 | 9/12/2019 | 9/12/2019 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 8/13/2019 | 8/14/2019 | 8/14/2019 | A | PART |
Mark Scharfen
|
|
|
Fire life safety inspection so Humane Society can start to move equipment in. All extinguishers and exit lights in place. SE door in hospital to parking area is missing exit discharge lighting and will need to have exit discharge lighting installed. Any exit that has an exit sign on the inside will need to have exit discharge lighting outside. All other exits had it and emergency lighting in all area worked correctly. OK to move equipment in. Permit will not be finalled until corrections on fire alarm permit have been corrected, tested and passed.
John Phone #: ###-####
|
BLD-Conference | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | DONE |
Mike Jordan
|
|
|
call 10 mins ahead- John Phone #: ###-####
|
FIRE-Conference | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | DONE |
Troy Cobbley
|
|
|
I went over the exit sign/emergency lights as shown on the city approved plans that are missing. We also went over the requirements for the one hour fire sprinkler riser room.
|
Meeting | | | 5/31/2019 | | DONE |
|
|
|
sent out email, and called companies with none, informing about correct address to all contractors
|
BLD-Ceiling Grid Inspection | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. 2nd floor and remainder of 1st. floor ok.
|
BLD-Ceiling Grid Inspection | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | FAIL |
Mike Jordan
|
|
|
John Phone #: ###-####. All main runners and cross ties shall be tied to prevent spreading. Needs to install clips or spreader bars.
|
BLD-Conference | 5/13/2019 | 5/14/2019 | 5/14/2019 | A | DONE |
Mike Jordan
|
|
|
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Mike Jordan
|
|
|
hosptail side -John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Jim Sly
|
|
|
John Phone #: ###-####
|
BLD-Energy code compliance | 3/7/2019 | 3/7/2019 | 3/7/2019 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 3/1/2019 | 3/1/2019 | 3/1/2019 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. fireblocking in donor hall.
|
BLD-Energy code compliance | 3/1/2019 | 3/1/2019 | 3/1/2019 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 2/22/2019 | 2/25/2019 | 2/25/2019 | A | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. Donor hall and catery. Needs to complete fireblocking.
|
BLD-Energy code compliance | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. fireblocking at top plate fiurred perimeter walls, 2nd. floor ok.
|
BLD-Energy code compliance | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. Airseal at 2nd floor and 1st floor central area completed. Went over fireblocking issues with contractor.
|
BLD-Framing/Rough-in | 1/25/2019 | 1/28/2019 | 1/28/2019 | A | PASS |
Mike Jordan
|
|
|
evan Phone #: ###-####. !st and 2nd floors, central area only.
|
BLD-Framing/Rough-in | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | CANC |
Jim Sly
|
|
|
John Phone #: ###-#### Cancelled by Contractor......
|
BLD-Wall cover | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. New envelope compliance with the R30 at vaulted ceilings will be ok, 4% better than code. Spray foam insulation also ok per the ICC ESR report.
|
BLD-Energy code compliance | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. A correction notice was issued to have architect recalculate the comm check using the R30 value at the vaulted roof areas in lieu of the R38.
|
FIRE-Final Inspection | 1/14/2019 | 1/15/2019 | 1/15/2019 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was just for a conference for the hospital side of the building. I'm ok for covering on the walls and columns as discussed.
John Phone #: ###-####
|
BLD-Energy code compliance | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. Ok to cover walls in hospital wing only. Need ICC ESR report for spray foam insulation in attic area ans also needs to provide an attic access as well.
|
FIRE-Conference | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | DONE |
Troy Cobbley
|
|
|
I stopped at the job site and spoke the the project superintendant about the need to contact the building inspector and the building plan reviewer about changes driven by the sprinkler system such as adding elements to the building that have not been included on the city approved plans. The items would include filling combustible concealed spaces with insulation and/or adding sheet rock. Prior to a cover inspection being given I would need approval from the building inspector and/or plan reviewer.
|
BLD-Framing/Rough-in | 11/29/2018 | 11/29/2018 | 11/29/2018 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. Interior wood framed walls ok in hospital wing only. Ok to insulate.
|
CHANGE STATUS TO (ISS) | | | 10/9/2018 | | DONE |
|
|
|
per GC no change in valuation for plan mod
|
(F) Reprint permit | | | 10/9/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/9/2018 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 9/7/2018 | 9/7/2018 | 10/5/2018 | | PASS |
Carl Westfall
|
|
|
Plan Mod - Humane Society (routed back to applicant)
|
Plan Reviewer's activity | | | 10/5/2018 | | PASS |
|
|
|
Plan mod review approved
|
Permit Ready to Issue | | | 10/5/2018 | | DONE |
|
|
|
Need
Revised Cert of Value
Plan Mod Approved
Do not reissue (plan mod fees due)
|
Routing - Design Review | 9/24/2018 | | 10/2/2018 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals requested | | | 9/24/2018 | | DONE |
|
|
|
Planning issues
|
Plan resubmittals received | | | 9/24/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/24/2018 | | 9/24/2018 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 9/19/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/19/2018 | | 9/19/2018 | | PASS |
Carl Westfall
|
|
|
|
Routing - Design Review | 9/19/2018 | | 9/19/2018 | | FAIL |
Andrea Tuning
|
|
|
Project must complete the Design Review process to modify the proposal and wait for the 10 day appeal period to expire.
|
Routing PW Sewer Design | 9/19/2018 | | 9/19/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing - FIRE | 9/12/2018 | 9/18/2018 | 9/18/2018 | | PASS |
Erika Akin
|
|
|
Addition of parallel parking does not reduce the east side FD access less than 20 feet in width on plans. Inspector to field verify.
|
Plan resubmittals requested | | | 9/18/2018 | | DONE |
|
|
|
|
Routing PW Drainage | 9/12/2018 | | 9/14/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 9/12/2018 | | 9/13/2018 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLANNING | 9/12/2018 | | 9/13/2018 | | PASS |
David Moser
|
|
|
|
Plan Reviewer's activity | | | 9/12/2018 | | DONE |
|
|
|
routed drawings
|
Routing - PUBLIC WORKS | 9/12/2018 | | 9/12/2018 | | PASS |
Morgan Webb
|
|
|
ROUTED TO DRAINAGE AND SEWER DESIGN
|
Routing - PLAN CHECK | 9/12/2018 | | 9/12/2018 | | PASS |
Carl Westfall
|
|
|
|
Routing - Design Review | 9/12/2018 | | 9/12/2018 | | FAIL |
Andrea Tuning
|
|
|
The applicant is required to obtain design review and allow the appeal period to expire. This process has not be completed.
|
Plan Modification Accepted | | | 9/10/2018 | | DONE |
Carl Westfall
|
|
|
Workflow in ePlanReview received
|
Plan Modification Accepted | | | 9/7/2018 | | DONE |
|
|
|
Plan Mod - Added 17 parking spaces along the East drive, removed gate, reduced scope of chain link fencing, removed
trellis structure at plaza Northwest plaza area to a grass area, updated sanitary sewer connection at Bird Street,
changed deciduous trees on Southeast edge to conifers.
|
BLD-Wall Bracing | 7/17/2018 | 7/18/2018 | 7/18/2018 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. All exterior shear walls ok for cover.
|
BLD-Other | 6/29/2018 | 7/2/2018 | 7/2/2018 | A | PASS |
Mike Jordan
|
|
|
John-- the 2 gable ends--roof sheeting inspection Phone #: ###-####. roof sheathing nailing on pitched roofs ok.
|
BLD-Framing/Rough-in | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. Flat roof and sloped roof over donor only ok to cover.
|
BLD-Framing/Rough-in | 6/14/2018 | 6/14/2018 | 6/14/2018 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. Roof over animal shelter only ok to cover.
|
BLD-Framing/Rough-in | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | PASS |
Mike Jordan
|
|
|
John--pre roofing Phone #: ###-####. Roofs over garage and upper mezz ok to cover only.
|
BLD-Wall Bracing | 5/29/2018 | 5/29/2018 | 5/29/2018 | A | NR |
Mike Jordan
|
|
|
roofs at garage and 2nd story not ready. Also needs to proveide city approved set of structural plans. Roof at hospital allready covered ,no inspection. Contractor accepts all liability in this area. Will try and verify blocking underneath once contractor has city approved plans.
|
BLD-Conference | 4/12/2018 | 4/12/2018 | 4/13/2018 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Other | 3/9/2018 | 3/12/2018 | 3/13/2018 | A | PEND |
Mike Jordan
|
|
|
John-grout and rebar Phone #: ###-####. Pending special inspection.
|
BLD-Foundation | 2/14/2018 | 2/15/2018 | 2/15/2018 | A | PASS |
Jim Storey
|
|
|
rebar // John Phone #: ###-#### mti/si pending report to 450
|
Issue PAID IN FULL permit | | | 1/19/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/19/2018 | | DONE |
|
|
|
|
Expiration Notice | 1/18/2018 | 2/8/2018 | 1/18/2018 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (CJW) | 8/23/2017 | 8/23/2017 | 1/17/2018 | | PASS |
Carl Westfall
|
|
|
(3rd done) (Sept 26 - 25 days) (166 sheets) Humane Society
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/17/2018 | | DONE |
|
|
|
MET
NEED
ACHD
met
GC FORM
REVISED CERT
|
Plan Reviewer's activity | | | 1/16/2018 | | DONE |
|
|
|
Sent an Email asking people to resolve their changemarks. They took care of it the next day.
|
Routing Off Site - STRUCTURAL | 1/5/2018 | | 1/12/2018 | | PASS |
Carl Westfall
|
|
|
Dave Haugland - In addition to your resubmittal review, Please resolve your changemarks
|
Routing - MECHANICAL | 1/5/2018 | | 1/8/2018 | | PASS |
Troy James
|
|
|
Please resolve your changemarks
|
Routing - Design Review | 1/5/2018 | | 1/5/2018 | | PASS |
Andrea Tuning
|
|
|
In addition to your resubmittal review, Please resolve you changemarks
|
Routing - PLUMBING | 1/5/2018 | | 1/5/2018 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - PLAN CHECK | 1/4/2018 | | 1/5/2018 | | PASS |
Carl Westfall
|
|
|
Pending approval by Structural (remember to upload the plan review report)
|
Plan resubmittals received | | | 1/4/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 12/16/2017 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/1/2017 | | 12/15/2017 | | FAIL |
Carl Westfall
|
|
|
Dave Haugland (AHJ)
|
Routing - PLUMBING | 12/1/2017 | | 12/8/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - FIRE | 12/1/2017 | | 12/6/2017 | | PASS |
Scott Arellano
|
|
|
Approved. Attached revised fire code plan review report to case.
|
Routing - Design Review | 12/1/2017 | | 12/4/2017 | | FAIL |
Andrea Tuning
|
|
|
Widen the interior planter island adjacent to the ADA spaces to be 8-feet in width (measured from inside of curb to inside of curb).
All pole lighting must be lcoated outside the required landscape planters.
|
Routing - MECHANICAL | 12/1/2017 | | 12/4/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 12/1/2017 | | 12/2/2017 | | PASS |
Carl Westfall
|
|
|
Pending approval by structural
|
Plan resubmittals received | | | 12/1/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 10/27/2017 | 10/30/2017 | 11/3/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 10/27/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 10/27/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/23/2017 | | 10/27/2017 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing Off Site - STRUCTURAL | 8/23/2017 | | 9/7/2017 | | FAIL |
Carl Westfall
|
|
|
Dave Haugland
|
Routing - FIRE | 8/23/2017 | 8/23/2017 | 9/6/2017 | | FAIL |
Scott Arellano
|
|
|
Emailed architect plan review report and attached report to case.
|
Routing PW Environmental | 8/24/2017 | | 9/1/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - Erosion and Sediment | 8/23/2017 | | 8/30/2017 | | PASS |
Andy J. Long
|
|
|
ESC permit already issued for IHS project, see ESC17-00748. No new ESC permit required.
|
Routing PW Sewer Design | 8/24/2017 | | 8/29/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - MECHANICAL | 8/23/2017 | | 8/28/2017 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 8/23/2017 | | 8/28/2017 | | FAIL |
Bill VanDegrift
|
|
|
1) additional cross connection protection will be required
2) minimum 2" waster below grade
3) venting system is undersized
4) size water system per ISPC
5) vent trap arms per ISPC
6) provide design for roof drainage between columns 3 through 9 and H through J
7) use ISPC for island sink venting
8) address cross connection protection for surgery tables
9) size complete water, waste and vent systems
10) elevations on waste plans do not work with sewer stub at street
|
Routing - PUBLIC WORKS | 8/23/2017 | | 8/25/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING Land Div | 8/23/2017 | | 8/25/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Street Lights | 8/24/2017 | | 8/25/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 8/24/2017 | | 8/24/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 8/24/2017 | | 8/24/2017 | | PASS |
Evan Carpenter
|
|
|
|
Routing - Addressing | 8/23/2017 | | 8/23/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLANNING | 8/23/2017 | | 8/23/2017 | | PASS |
David Moser
|
|
|
|
Routing - Design Review | 8/23/2017 | | 8/23/2017 | | FAIL |
Andrea Tuning
|
|
|
Widen the interior planter island adjacent to the ADA spaces to be 8-feet in width (measured from inside of curb to inside of curb).
All pole lighting must be lcoated outside the required landscape planters.
|
Intake Approval | | | 8/23/2017 | | PASS |
|
|
|
|
Application received | | | 8/11/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 11 2017 3:07PM
|