Print Statement | | | 11/16/2018 | | DONE |
|
|
|
|
Third Notice | | 10/17/2018 | 11/7/2018 | | DONE |
|
|
|
mailed 11-12
|
Second Notice | | 9/17/2018 | 10/12/2018 | | DONE |
|
|
|
mailed 10-15-18
|
First Notice | | 9/10/2018 | 9/7/2018 | | DONE |
|
|
|
mailed 9-10-18
|
Permanent Occupancy | | | 8/31/2018 | | DONE |
|
|
|
|
BLD-Final | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Mike Jordan
|
|
|
Greg Phone #: ###-####. All issues resolved. ok for perm occ.
|
Temporary Occupancy | 7/18/2018 | 10/16/2018 | 7/18/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason B ok'd extension for Temp C of O
|
Telephone call | | | 7/17/2018 | | DONE |
|
|
|
called Ben to let know the TCO is about to expire-he will email Jason Blais
|
BLD-Aging Inspection | 7/11/2018 | 7/11/2018 | 7/11/2018 | | PEND |
Mike Jordan
|
|
|
pending zoning and fees due.
|
Routing PW Street Lights | 5/25/2018 | | 5/25/2018 | | PASS |
Tom Marshall
|
|
|
Street lights was missed durning normal review and was caught in April and is now being installed.
|
Temporary Occupancy | 4/20/2018 | 7/19/2018 | 4/20/2018 | | DONE |
Christina Prado
|
|
|
PWK has fees due. Please don't issue the CO until they are paid. PWK18-00151
|
BLD-Final | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | PART |
Mike Jordan
|
|
|
Ok for temp occ. Still needs to install a permanant cane guard.
|
BLD-Final | 4/18/2018 | 4/19/2018 | 4/19/2018 | A | FAIL |
Mike Jordan
|
|
|
Greg Phone #: ###-####. Provide cane guard on exterior stairs. Noted open risers on exterior stairs exceed 4 inches. Also needs final letter from special insection.
|
PubWorks Occupancy Approval | 4/19/2018 | 4/19/2018 | 4/19/2018 | | DONE |
Tiffany Lowery
|
|
|
Engineer letter for drainage received, and bonding for street lights received.
|
FIRE-Final Inspection | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
Greg Phone #: ###-####
|
Plan Reviewer's activity | | | 4/18/2018 | | DONE |
Erika Akin
|
|
|
Call from inspector. Hydrant not installed as shown on plan sheet A101 as refenced in review but as shown on plan sheet C2.1. Location okay.
|
FIRE-Final Inspection | 4/17/2018 | 4/17/2018 | 4/17/2018 | P | CANC |
Troy Cobbley
|
|
|
Greg Phone #: ###-####
|
BLD-Final | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | NR |
Mike Jordan
|
|
|
Greg -structural final occupancy Phone #: ###-####
|
FIRE-Final Inspection | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | FAIL |
Jim Page
|
|
|
Fire extinguishers are mounted to high, extinguishers need to be lowered to 48inches or below. Provide signage for fire sprinkler riser room/FACP. Repair exit discharge emergency lighting, exterior emergency lights did not work on secondary power supply.
|
Zoning Approval | 4/16/2018 | 4/16/2018 | 4/16/2018 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Ceiling Grid Inspection | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | PART |
Mike Jordan
|
|
|
Ed Phone #: ###-####. Grid ok 1st and 2nd floors. Pending electrical and mech. rough in inspections.
|
FIRE-Conference | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | DONE |
Troy Cobbley
|
|
|
I stopped and discussed possible gate requirements with the job superintendant. Per scott the reduced gate width is not a factor and the electric gates (submitted as manual) will not require Opticon but a means to access them shall be required to be provided in the Knox key box
|
BLD-Energy code compliance | 3/6/2018 | 3/6/2018 | 3/6/2018 | P | PASS |
Brandon Shaw
|
|
|
Ed Phone #: ###-####
|
BLD-Energy code compliance | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Mike Jordan
|
|
|
Ed Phone #: ###-####
|
BLD-Energy code compliance | 2/6/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Jim Storey
|
|
|
Ed Phone #: ###-#### 2nd floor ok/ first floor ok to insulate pending fir spk hard ceillings ok
|
BLD-Framing/Rough-in | 2/2/2018 | 2/5/2018 | 2/5/2018 | A | PASS |
Mike Jordan
|
|
|
Ed Phone #: ###-####. Interior and exterior wood framed walls 2nd. floor only ok. No ceiling or hardlids at this time.
|
BLD-Framing/Rough-in | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | CANC |
Mike Jordan
|
|
|
ED SLOAN Phone #: ###-####. Needs electrical rough in inspection and airseal pack .
|
BLD-Framing/Rough-in | 1/10/2018 | 1/11/2018 | 1/11/2018 | A | PASS |
Mike Jordan
|
|
|
Ed Phone #: ###-####. Shear walls ok.
|
Telephone call | | | 12/11/2017 | | DONE |
|
|
|
called Edward to let know that there are still fees due and taht we can not issue the permit until they are payed-couldn't leave a message because the box is full-will email him
|
Issue PAID IN FULL permit | | | 12/11/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/11/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/1/2017 | | DONE |
|
|
|
Need:
Revised value
GC form
ACHD - met
RP - met (ESC17-01077) this is issued already so please don't re issue it
|
Plan assigned to (CJW) | 9/14/2017 | 9/14/2017 | 11/30/2017 | | PASS |
Carl Westfall
|
|
|
(2nd done) (Oct 18 - 25 days) (92 sheets) Sloan Securities (new BLDG)
|
Routing - PLAN CHECK | 11/29/2017 | | 11/30/2017 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/29/2017 | | DONE |
|
|
|
|
Routing - Design Review | 11/29/2017 | | 11/29/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00214 and DRH17-00279
|
Routing - Design Review | 11/14/2017 | | 11/20/2017 | | FAIL |
Katelyn Menuge
|
|
|
Light poles cannot be within planter islands containing trees.
|
Plan resubmittals requested | | | 11/20/2017 | | DONE |
|
|
|
|
Routing - MECHANICAL | 11/14/2017 | | 11/15/2017 | | PASS |
Troy James
|
|
|
Please resolve your changemarks
|
Route to Impact Fee Review | 11/4/2017 | 11/7/2017 | 11/14/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 11/14/2017 | | 11/14/2017 | | PASS |
Carl Westfall
|
|
|
Drawings approved
|
Plan resubmittals received | | | 11/14/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 11/13/2017 | | DONE |
|
|
|
|
Routing - MECHANICAL | 11/7/2017 | | 11/13/2017 | | PASS |
Troy James
|
|
|
|
Routing Off Site - STRUCTURAL | 11/7/2017 | | 11/13/2017 | | PASS |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Routing - PLAN CHECK | 11/7/2017 | | 11/8/2017 | | PASS |
Carl Westfall
|
|
|
Pending structural. The final Item was resolved by uploading an Emailed drawing.
|
Routing - Design Review | 11/7/2017 | | 11/8/2017 | | FAIL |
Katelyn Menuge
|
|
|
Need light poles moved out of landscape planters that contain trees.
|
Routing - PLAN CHECK | 11/6/2017 | | 11/7/2017 | | FAIL |
Carl Westfall
|
|
|
Revisions required to correct return air path
|
Plan resubmittals received | | | 11/6/2017 | | DONE |
|
|
|
|
1st review completed | | | 11/4/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 11/4/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/14/2017 | | 11/4/2017 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing Off Site - STRUCTURAL | 9/14/2017 | | 10/2/2017 | | FAIL |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Routing - FIRE | 9/14/2017 | 9/14/2017 | 9/25/2017 | | PASS |
Scott Arellano
|
|
|
Attached plan review comments to plans.
|
Routing PW Environmental | 9/14/2017 | | 9/25/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Sewer Design | 9/14/2017 | | 9/22/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Drainage | 9/14/2017 | | 9/20/2017 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 9/14/2017 | | 9/20/2017 | | PASS |
Morgan Webb
|
|
|
Be sure to Route to Jason Taylor
|
Routing - Erosion and Sediment | 9/14/2017 | | 9/19/2017 | | PASS |
Andy J. Long
|
|
|
ESC permit for project already issued with GRD permit. See ESC17-01077. No duplicate ESC permit required.
|
Routing - MECHANICAL | 9/14/2017 | | 9/18/2017 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 9/14/2017 | | 9/15/2017 | | PASS |
Bill VanDegrift
|
|
|
red lines
1) provide 12.56" of venting through the roof
2) sewer service is schedule 40 PVC
|
Routing - PLANNING | 9/14/2017 | | 9/15/2017 | | PASS |
Nicolette Womack
|
|
|
|
Routing - PLANNING Land Div | 9/14/2017 | | 9/15/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 9/14/2017 | | 9/15/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Solid Waste | 9/14/2017 | | 9/15/2017 | | PASS |
Evan Carpenter
|
|
|
Enclosure gates must be shown on the plans; enclosure needs to face north to ensure the requirement of 50 feet of clearance in front of enclosure is met
|
Routing - Design Review | 9/14/2017 | | 9/15/2017 | | FAIL |
Katelyn Menuge
|
|
|
Corrections Required - DRH17-00279
|
Plan Reviewer's activity | | | 9/14/2017 | | PASS |
|
|
|
Plan intake approved. Accepting this project for permit submission is not an endorsement of the foundation design or the soils work proposed.
|
Intake Approval | | | 9/14/2017 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 9/14/2017 | | 9/14/2017 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 8/28/2017 | | FAIL |
|
|
|
(8-28-17) Please see the circled items in the plan intake checklist. Please resolve each item as directed. Provide a detailed grading plan showing the detailed recommendations of the Geo Tech Engineer on the drawings. Provide a complete structural package for the metal building including connection details. Provide complete engineering calculations that validate the metal building drawings. CJW
|
Plan Reviewer's activity | | | 8/17/2017 | | |
|
|
|
Make sure this project is routed to Jason Taylor. "Monitoring and observation of all earthwork activities by and MTI geotechnical engineer is mandatory."
|
Intake Approval | | | 8/17/2017 | | FAIL |
|
|
|
(8-17-17) Please see the circled items in the plan intake checklist. Please resolve each item as directed. CJW
|
Application received | | | 8/16/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 16 2017 2:11PM
|