BLD-Energy code compliance | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Bade
|
BLD-Framing/Rough-in | 10/31/2019 | 11/1/2019 | 11/1/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### x000 Inspection requested via web by Ben Bade
|
BLD-Wall Bracing | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | PART |
Dave Hannah
|
|
|
Ben Phone #: ###-#### ok to cover ext still needs to install strapes and hold downs
|
BLD-Footing | 8/28/2019 | 8/28/2019 | 8/28/2019 | P | PASS |
Dave Hannah
|
|
|
Stairs/deck footings at the back of the building Phone #: ###-#### Inspection requested via web by Ben Bade
|
PubWorks Subgrade Approval | 8/6/2019 | 8/6/2019 | 8/6/2019 | | DONE |
Melissa Jannusch
|
|
|
Sonotube footings.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 7/30/2019 | 7/31/2019 | 7/31/2019 | P | PASS |
Dave Hannah
|
|
|
Retaining wall Phone #: ###-#### x1234 Inspection requested via web by Ben Bade
|
BLD-Footing | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | PASS |
Dave Hannah
|
|
|
Retaining wall footing inspect. Post footings passed last week Phone #: ###-#### x123 Inspection requested via web by Ben Bade
|
BLD-Footing | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | PART |
Dave Hannah
|
|
|
partial footing // Ben Phone #: ###-#### two columns on front ok
|
PubWorks Subgrade Approval | 7/26/2019 | 7/26/2019 | 7/26/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
CHANGE STATUS TO (ISS) | | | 7/25/2019 | | DONE |
|
|
|
plan mod
|
OVERRIDE | | | 7/22/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 5/7/2019 | 5/7/2019 | 7/22/2019 | | PASS |
Josh Bogle
|
|
|
05/13 retaining wall, ePlan - 1st done
|
Routing PW Grading-Hillside | 7/18/2019 | | 7/22/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLAN CHECK | 7/18/2019 | | 7/22/2019 | | PASS |
Josh Bogle
|
|
|
Plan Review fee per added value
|
Permit Ready to Issue | | | 7/22/2019 | | DONE |
|
|
|
plan mod
|
Plan Reviewer's activity | | | 7/18/2019 | | DONE |
Josh Bogle
|
|
|
accepted resubmittal, routed to MMJ
|
Routing - PLAN CHECK | 7/15/2019 | | 7/15/2019 | | FAIL |
Josh Bogle
|
|
|
PASS - pending Grading-Hillside approval
|
Routing PW Grading-Hillside | 7/10/2019 | | 7/10/2019 | | FAIL |
Melissa Jannusch
|
|
|
NEW RETAINING Wall will need to be shown on grading and drainge plans with wall heights and detail for drainge.
|
Plan Reviewer's activity | | | 6/24/2019 | | DONE |
Josh Bogle
|
|
|
reaccepted in ePlan, routed to Hilllside
|
Routing PW Grading-Hillside | 5/31/2019 | | 6/7/2019 | | FAIL |
Melissa Jannusch
|
|
|
Fail plan mod. see changemarks in ePlan
|
Routing - PLAN CHECK | 5/31/2019 | | 6/7/2019 | | FAIL |
Josh Bogle
|
|
|
PASS - pending Grading-Hillside approval
|
Routing - PLAN CHECK | 5/9/2019 | | 5/14/2019 | | FAIL |
Josh Bogle
|
|
|
no build plan
|
Routing - PLANNING | 5/9/2019 | | 5/13/2019 | | PASS |
Nicolette Womack
|
|
|
Combined height of railings and stairs within the front setback shall not exceed 3' from finished grade.
|
Routing PW Grading-Hillside | 5/9/2019 | | 5/13/2019 | | FAIL |
Melissa Jannusch
|
|
|
See changemark in eplan
|
Routing - PUBLIC WORKS | 5/9/2019 | | 5/9/2019 | | PASS |
Morgan Webb
|
|
|
|
Plan Modification Accepted | | | 5/7/2019 | | DONE |
|
|
|
plan mod-changes-adding a retaining wall and some grading-assigned to JAB
|
CHANGE STATUS TO (ISS) | | | 12/3/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/3/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/3/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/14/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 6/14/2018 | 6/14/2018 | 8/14/2018 | | PASS |
Josh Bogle
|
|
|
modification - waiting for applicant to upload new docs
|
Routing - PLAN CHECK | 8/2/2018 | | 8/14/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2018 | | DONE |
Josh Bogle
|
|
|
two hour Modification fee
|
Permit Ready to Issue | | | 8/14/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
(Change back to issue status once fees are paid)
|
Routing - PLANNING | 8/2/2018 | | 8/3/2018 | | PASS |
Nicolette Womack
|
|
|
Combined height of railings and stairs within the front setback shall not exceed 3' from finished grade.
|
Plan Modification Accepted | | | 6/14/2018 | | DONE |
Christina Prado
|
|
|
plan mod 1 - reduce proposed addition
|
Issue PAID IN FULL permit | | | 2/26/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/26/2018 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 1/23/2018 | 1/23/2018 | 2/22/2018 | | PASS |
Josh Bogle
|
|
|
1st done - structural, WUI, & attic ventilation issues
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2018 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 2/22/2018 | | DONE |
Christina Prado
|
|
|
Need
RP
|
Routing - PLAN CHECK | 2/21/2018 | | 2/21/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 2/6/2018 | | 2/13/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - MECHANICAL | 2/12/2018 | | 2/12/2018 | | PASS |
Troy James
|
|
|
approved manual j report
|
Routing - MECHANICAL | 2/6/2018 | | 2/9/2018 | | FAIL |
Chad Schwendiman
|
|
|
Corrections not made from 1-24-2018 review, (still need to submit a Manual J)
|
Routing - PLAN CHECK | 2/6/2018 | | 2/7/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 1/26/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 1/23/2018 | | 1/26/2018 | | FAIL |
Josh Bogle
|
|
|
|
Route to Impact Fee Review | 1/23/2018 | 1/26/2018 | 1/24/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 1/23/2018 | | 1/24/2018 | | FAIL |
Chad Schwendiman
|
|
|
Need to provide a manual J and show ventilation compliance
|
Routing PW Grading-Hillside | 1/23/2018 | | 1/24/2018 | | FAIL |
Melissa Jannusch
|
|
|
see ePlan comments
|
Route to Impact Fee Review | 1/23/2018 | 1/26/2018 | 1/23/2018 | | PASS |
Eric Bilimoria
|
|
|
|
Routing - PLANNING | 1/23/2018 | | 1/23/2018 | | PASS |
Nicolette Womack
|
|
|
CFH approval based on grading plan dated 12-13-17.
|
Routing - Addressing | 1/23/2018 | | 1/23/2018 | | PASS |
Doug Chausow
|
|
|
ADU Address: 738 N Santa Paula Pl
|
Routing - PUBLIC WORKS | 1/23/2018 | | 1/23/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 1/23/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/23/2018 | | DONE |
|
|
|
|
Application received | | | 8/17/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 17 2017 12:02AM
|
Intake Approval | | | 8/17/2017 | | FAIL |
|
|
|
Plans need to be separate and a CATII is needed
|