Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD17-02936
StatusFinaled
Name J & B CONSTRUCTION
Site Address 290 W HORIZON DR
Project Name 
Customer Number 
ePlanReviewNo
Description
9-19-17 PLAN MOD CHANGED ROOF RAFTERS TO 9.5" BCI 5000's - SPACING, VARIOUS **jab** Permit for a remodel to include: demoing and rebuilding master suite above garage, demo and reconfigure of roof above entry, kitchen redone, bathroom & laundry relocate, egress window and well being added to a downstairs room, & relocation of stairs. all work per plans, notes, & local code. Separate electrical, plumbing, & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection9/14/20189/14/20189/20/2018 DONE
DetailsTony Young
DOC - Permit Finaled9/20/20189/20/20189/20/2018PPASS
DetailsTony Young
Routing Walk-In (BLD)8/31/20188/31/20188/31/2018PPASS
DetailsJosh Bogle
BLD-Final5/2/20185/3/20185/3/2018APASS
DetailsTony Young
inside final- Jack Phone #: ###-####,, inside ok
BLD-Other4/16/20184/19/20184/20/2018PNR
DetailsTony Young
Jack -wants an interior final, call 30 min ahead for access Phone #: ###-####,, need trades
BLD-Framing/Rough-in1/9/20181/9/20181/9/2018PPASS
DetailsBrandon Shaw
Basement bedroom closets- OK to cover
BLD-Energy code compliance12/29/20171/2/20181/2/2018APASS
DetailsBrandon Shaw
South half, OK to cover
BLD-Framing/Rough-in12/27/201712/27/201712/27/2017PPASS
DetailsDave Hannah
Jack Phone #: ###-#### south half ok to insulate
BLD-Energy code compliance12/6/201712/7/201712/7/2017APART
DetailsJim Sly
Jack Phone #: ###-####
North half....OK to cover.
BLD-Framing/Rough-in11/20/201711/22/201711/22/2017APART
DetailsJim Storey
Jack Phone #: ###-#### north half of building ok to insulate.
Plan assigned to (JAB) Josh9/19/20179/19/20179/19/2017 PASS
DetailsJosh Bogle
Plan Modification Accepted  9/19/2017 DONE
changed roof framing details - JAB
PLANS/APPL TAKEN TO FRONT DESK  9/19/2017 DONE
DetailsJosh Bogle
CHANGE STATUS TO (ISS)  9/19/2017 DONE
DetailsChristina Prado
No fees for plan mod
Plan Modification Accepted  9/19/2017 DONE
has questions-wants to use different rafters-says shouldn't need new drawings-i snet him to Josh B
BLD-Conference8/31/20178/31/20178/31/2017PDONE
DetailsDave Hannah
Jack Phone #: ###-####
OVERRIDE  8/30/2017  
Routing Walk-In (BLD)8/30/20178/30/20178/30/2017ADONE
DetailsJosh Bogle
Routing - PLAN CHECK8/30/2017 8/30/2017 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  8/30/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  8/30/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  8/30/2017 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Permit Ready to Issue  8/30/2017 DONE
Issue PAID IN FULL permit  8/30/2017 DONE
Routing Walk-In (Zoning)8/17/20178/17/20178/17/2017ADONE
DetailsSue Cummings
Routing Walk-In (BLD)8/17/20178/17/20178/17/2017AFAIL
DetailsJosh Bogle
1st review completed  8/17/2017 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK8/17/2017 8/17/2017 FAIL
DetailsJosh Bogle
Application received 8/17/2017