BLD-Aging Inspection | 9/14/2018 | 9/14/2018 | 9/20/2018 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Tony Young
|
|
|
|
Routing Walk-In (BLD) | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PASS |
Josh Bogle
|
|
|
|
BLD-Final | 5/2/2018 | 5/3/2018 | 5/3/2018 | A | PASS |
Tony Young
|
|
|
inside final- Jack Phone #: ###-####,, inside ok
|
BLD-Other | 4/16/2018 | 4/19/2018 | 4/20/2018 | P | NR |
Tony Young
|
|
|
Jack -wants an interior final, call 30 min ahead for access Phone #: ###-####,, need trades
|
BLD-Framing/Rough-in | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | PASS |
Brandon Shaw
|
|
|
Basement bedroom closets- OK to cover
|
BLD-Energy code compliance | 12/29/2017 | 1/2/2018 | 1/2/2018 | A | PASS |
Brandon Shaw
|
|
|
South half, OK to cover
|
BLD-Framing/Rough-in | 12/27/2017 | 12/27/2017 | 12/27/2017 | P | PASS |
Dave Hannah
|
|
|
Jack Phone #: ###-#### south half ok to insulate
|
BLD-Energy code compliance | 12/6/2017 | 12/7/2017 | 12/7/2017 | A | PART |
Jim Sly
|
|
|
Jack Phone #: ###-#### North half....OK to cover.
|
BLD-Framing/Rough-in | 11/20/2017 | 11/22/2017 | 11/22/2017 | A | PART |
Jim Storey
|
|
|
Jack Phone #: ###-#### north half of building ok to insulate.
|
Plan assigned to (JAB) Josh | 9/19/2017 | 9/19/2017 | 9/19/2017 | | PASS |
Josh Bogle
|
|
|
|
Plan Modification Accepted | | | 9/19/2017 | | DONE |
|
|
|
changed roof framing details - JAB
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2017 | | DONE |
Josh Bogle
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/19/2017 | | DONE |
Christina Prado
|
|
|
No fees for plan mod
|
Plan Modification Accepted | | | 9/19/2017 | | DONE |
|
|
|
has questions-wants to use different rafters-says shouldn't need new drawings-i snet him to Josh B
|
BLD-Conference | 8/31/2017 | 8/31/2017 | 8/31/2017 | P | DONE |
Dave Hannah
|
|
|
Jack Phone #: ###-####
|
OVERRIDE | | | 8/30/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/30/2017 | 8/30/2017 | 8/30/2017 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/30/2017 | | 8/30/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/30/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 8/30/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/30/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 8/17/2017 | 8/17/2017 | 8/17/2017 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 8/17/2017 | 8/17/2017 | 8/17/2017 | A | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 8/17/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/17/2017 | | 8/17/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 8/17/2017 | | | |
|
|
|
|