Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-02948
StatusIssued
Name YOUNG DAYTON M
Site Address 205 S WALNUT ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit to build a detached shop. All work per plans, notes, & local code. Separate electrical & plumbing permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection7/25/20187/25/20187/30/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection7/24/20187/24/20187/24/2018 PEND
DetailsDave Hannah
BLD-Framing/Rough-in3/9/20183/12/20183/12/2018ACANC
DetailsMike Jordan
Dayton Phone #: ###-####
BLD-Wall Bracing3/12/20183/12/20183/12/2018APASS
DetailsMike Jordan
Dayton Phone #: ###-####
Inspection Record Card- Bld  3/9/2018 DONE
Routing Walk-In (BLD)2/16/20182/16/20182/16/2018PPASS
DetailsJosh Bogle
Routing Walk-In (BLD)12/11/201712/11/201712/11/2017AFAIL
DetailsBrian McGowan
No current information was provided for the wall panels he proposed to use. Need a current ICC-ES Report.
Plan assigned to (BJM)12/11/201712/11/201712/11/2017 FAIL
DetailsBrian McGowan
No current information was provided for the wall panels he proposed to use. Need a current ICC-ES Report.
BLD-Wall Bracing11/3/201711/6/201711/6/2017ACANC
DetailsDave Hannah
Dayton Phone #: ###-####
BLD-Foundation11/6/201711/6/201711/6/2017APASS
DetailsDave Hannah
BLD-Footing10/25/201710/26/201710/26/2017APASS
DetailsDave Hannah
Dayton Phone #: ###-####
Routing Walk-In (BLD)9/29/20179/29/20179/29/2017ADONE
DetailsJosh Bogle
Routing - PLAN CHECK9/29/2017 9/29/2017 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  9/29/2017 DONE
DetailsJosh Bogle
no fee
Permit Ready to Issue  9/29/2017 DONE
no fee per JAB
CHANGE STATUS TO (ISS)  9/29/2017 DONE
Routing Walk-In (BLD)9/1/20179/1/20179/1/2017ADONE
DetailsJosh Bogle
Routing - PLAN CHECK9/1/2017 9/1/2017 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  9/1/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  9/1/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  9/1/2017 DONE
DetailsJosh Bogle
ESC yes - Energy no
Permit Ready to Issue  9/1/2017 DONE
Issue PAID IN FULL permit  9/1/2017 DONE
Routing Walk-In (BLD)8/31/20178/31/20178/31/2017PFAIL
DetailsJosh Bogle
no contact with applicant
Routing Walk-In (Zoning)8/17/20178/17/20178/17/2017PDONE
DetailsSue Cummings
Routing Walk-In (BLD)8/17/20178/17/20178/17/2017PFAIL
DetailsJosh Bogle
talked submission requirements
1st review completed  8/17/2017 FAIL
DetailsJosh Bogle
Application received 8/17/2017