Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-02952
StatusFinaled
Name ASC
Site Address 4060 S TALAVERA WAY
Project NameMurata Addition
Customer Number 
ePlanReviewYes
Description
Adding a bonus room with bedroom, bathroo, and sink area over existing Garage with the removal of the existing trusses. Scope of work includes engineering for new footings, and framing system for new level. Fire separation shall be as noted on approved drawings. Prescriptive energy **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/19/20187/20/20187/20/2018APASS
DetailsJim Storey
Jerry Phone #: ###-####-after 9 if possible or do in the am 10
DOC - Permit Finaled7/20/20187/20/20187/20/2018PPASS
DetailsJim Storey
BLD-Final7/18/20187/19/20187/19/2018ADEFR
DetailsJim Storey
Jerry Phone #: ###-####-after 9 if possible or do in the PMout of time
BLD-Energy code compliance4/24/20184/24/20184/24/2018PPASS
DetailsBrandon Shaw
Art Phone #: ###-####-call for access code
BLD-Framing/Rough-in4/17/20184/18/20184/18/2018APASS
DetailsJim Storey
Mikeal Phone #: ###-####
BLD-Wall Bracing3/8/20183/9/20183/9/2018APASS
DetailsJim Storey
Art Phone #: ###-####
BLD-Footing12/18/201712/18/201712/18/2017PPASS
DetailsJim Storey
Jeff Phone #: ###-####
Issue PAID IN FULL permit  11/2/2017 DONE
Inspection Record Card- Bld  11/2/2017 DONE
Plan assigned to (AJS)9/8/20179/8/201710/31/2017 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed 2nd story addition
Routing - PLAN CHECK10/31/2017 10/31/2017 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  10/31/2017 DONE
Permit Ready to Issue  10/31/2017 DONE
DetailsChristina Prado
All requirements met
Routing - PLAN CHECK10/16/2017 10/16/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Plan assigned to (JAB) Josh8/18/20178/18/20179/8/2017 DEFR
DetailsJosh Bogle
2nd story addition
Routing - PLAN CHECK8/18/2017 9/8/2017 FAIL
DetailsAdele J Schaffeld-Griffin
1st review completed  9/8/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Application received  8/18/2017 DONE
Application submitted via PDS Online on Aug 18 2017 7:57AM
Plans ACCEPTED BY PLAN TECH  8/18/2017 DONE
Intake Approval  8/18/2017 PASS
Recd Pcfee & Taken To Pln CK  8/18/2017 DONE
Routing - PLANNING8/18/2017 8/18/2017 PASS
DetailsSue Cummings