Permanent Occupancy | | | 8/23/2019 | | DONE |
|
|
|
|
BLD-Final | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | PASS |
Brandon Shaw
|
|
|
John Phone #: ###-####
|
DOC - Permit Finaled | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 8/16/2019 | 8/16/2019 | 8/19/2019 | P | PEND |
Dave Hannah
|
|
|
John Phone #: ###-#### needs returns on handrail
|
BLD-Conference | 6/4/2019 | 6/4/2019 | 6/6/2019 | P | DONE |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Final | 6/5/2019 | 6/5/2019 | 6/5/2019 | A | PART |
Dave Hannah
|
|
|
ok for tco needs to fix handrail in stair tower
|
BLD-Final | 5/30/2019 | 5/31/2019 | 5/31/2019 | A | NR |
Dave Hannah
|
|
|
John Phone #: ###-#### needs four inch lemiters on windows fix handrail in stair tower and opennings in risers
|
Zoning Approval | 5/30/2019 | 5/30/2019 | 5/30/2019 | | PASS |
Katelyn Menuge
|
|
|
|
FIRE-Final Inspection | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in placed and will be inspected as discussed. Final life fire safety inspection complete.
John Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 3/25/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/25/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/11/2019 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 7/23/2018 | 7/23/2018 | 8/7/2018 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - Plan Mod #3 Warm Springs - add hose bibb & drain
|
Routing - PLAN CHECK | 8/2/2018 | | 8/7/2018 | | PASS |
Julie Romig
|
|
|
|
Permit Ready to Issue | | | 8/7/2018 | | DONE |
|
|
|
Plan Mod approved
DO NOT REISSUE
(Change this permit and BLD17-00954 back to issued status after plan mod fee have been paid.)
|
Routing - PLUMBING | 7/23/2018 | | 8/6/2018 | | PASS |
Bill VanDegrift
|
|
|
public works has approved the floor drain location.
|
Routing - PLAN CHECK | 7/23/2018 | | 7/31/2018 | | FAIL |
Julie Romig
|
|
|
Plan Mod #3 pending approval by plumbing and public works.
|
BLD-Other | 7/20/2018 | 7/20/2018 | 7/24/2018 | P | PASS |
Dave Hannah
|
|
|
John-sheetrock Phone #: ###-####
|
BLD-Other | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Dave Hannah
|
|
|
energy seal- john Phone #: ###-####
|
BLD-Other | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Dave Hannah
|
|
|
fire caluking- john Phone #: ###-#### also framing
|
Plan Modification Accepted | | | 7/23/2018 | | DONE |
|
|
|
Plan Mod #3 - add hose bibb & drain
|
BLD-Wall Bracing | 7/19/2018 | 7/19/2018 | 7/20/2018 | P | PEND |
Dave Hannah
|
|
|
John-sheetrock Phone #: ###-####
|
BLD-Energy code compliance | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Dave Hannah
|
|
|
John Wyman Phone #: ###-####
|
BLD-Energy code compliance | 7/13/2018 | 7/16/2018 | 7/16/2018 | A | PASS |
Dave Hannah
|
|
|
2nd floor // John Phone #: ###-####
|
BLD-Energy code compliance | 7/11/2018 | 7/11/2018 | 7/12/2018 | P | PASS |
Dave Hannah
|
|
|
3rd floor apartment - John Phone #: ###-#### ok to cover
|
Override - Parcel Holds | 7/11/2018 | 1/1/1900 | 7/11/2018 | | |
|
|
|
Insulation insp
|
BLD-Other | 7/9/2018 | 7/9/2018 | 7/9/2018 | P | PASS |
Dave Hannah
|
|
|
fire colk // John Phone #: ###-#### ok to insulate
|
BLD-Framing/Rough-in | 7/3/2018 | 7/3/2018 | 7/3/2018 | P | NR |
Dave Hannah
|
|
|
John Phone #: ###-#### framing ok but needs to install firestopping
|
CHANGE STATUS TO (ISS) | | | 6/26/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/26/2018 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 6/12/2018 | 6/12/2018 | 6/20/2018 | | DONE |
Julie Romig
|
|
|
Plan mod
|
Routing - PLAN CHECK | 6/18/2018 | | 6/20/2018 | | PASS |
Julie Romig
|
|
|
Plan Mod 2
|
Routing - Design Review | 6/18/2018 | | 6/20/2018 | | PASS |
Katelyn Menuge
|
|
|
Light Changes okay.
|
Routing - MECHANICAL | 6/18/2018 | | 6/20/2018 | | PASS |
Troy James
|
|
|
Plan Mod 2
|
Permit Ready to Issue | | | 6/20/2018 | | DONE |
|
|
|
Plan Mod please do not re issue 2 permits also see BLD17-00954
need
rev cert of val
|
Plan Modification Accepted | | | 6/12/2018 | | DONE |
|
|
|
Plan mod workflow started (in eplan under Bld17-00954) to revise HVAC, remove exterior lights and switch at bedroom false balconies levels 2 & 3, revise landscape plan to remove lawn, add plants & specify xeroscape drip irrigation.
|
BLD-Footing | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####-footings for parking lot
|
BLD-Other | 4/23/2018 | 4/24/2018 | 4/24/2018 | A | PASS |
Dave Hannah
|
|
|
John-Fire wall Phone #: ###-####
|
BLD-Other | 4/16/2018 | 4/16/2018 | 4/17/2018 | P | DONE |
Dave Hannah
|
|
|
Fire sheet rock behind showers- Dawn Phone #: ###-#### needs to sheetrock box for valves
|
BLD-Wall Bracing | 4/13/2018 | 4/13/2018 | 4/16/2018 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### ok to cover ext
|
Print Occupancy Form | | | 4/13/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/13/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/13/2018 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 3/5/2018 | 3/5/2018 | 3/26/2018 | | DONE |
Julie Romig
|
|
|
**Plan Mod - 1st Rev Comp 2nd Rec'd 3/23 - Warm Springs Bldg B
|
Permit Ready to Issue | | | 3/26/2018 | | |
|
|
|
DO NOT REISSUED - Plan Mod fees due
|
Routing - PLAN CHECK | 3/23/2018 | | 3/23/2018 | | PASS |
Julie Romig
|
|
|
Plan Mod - 2nd Review
|
Routing - Design Review | 3/23/2018 | | 3/23/2018 | | PASS |
Katelyn Menuge
|
|
|
Plan Mod - 2nd Review
|
Routing - PLAN CHECK | 3/7/2018 | | 3/22/2018 | | FAIL |
Julie Romig
|
|
|
Plan Mod
|
Plan Modification Accepted | | | 3/5/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod to remove windows at stairwell, add motion switches, replace metal band with stucco, revise roof insulation and add attic ventilation
|
BLD-Footing | 11/27/2017 | 11/27/2017 | 11/27/2017 | P | NR |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Foundation | 11/8/2017 | 11/9/2017 | 11/9/2017 | A | PASS |
Dave Hannah
|
|
|
John-pour time 1:00 Phone #: ###-####
|
BLD-Footing | 11/1/2017 | 11/2/2017 | 11/2/2017 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/30/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/30/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 8/24/2017 | | |
|
|
|
|
Route to Impact Fee Review | 8/21/2017 | 8/24/2017 | 8/24/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (JAR) | 4/14/2017 | 4/14/2017 | 8/24/2017 | | DONE |
Julie Romig
|
|
|
**Warm Springs Bldg B
|
Routing - PLUMBING | 4/14/2017 | | 8/24/2017 | | PASS |
Bill VanDegrift
|
|
|
ok
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/24/2017 | | DONE |
Christina Prado
|
|
|
Need:
ACHD - MET
RP
GC Form - MET
Revised Certificate of Value - MET
DO NOT ISSUE WITHOUT BLD17-00954 & BLD17-02956
|
Routing - FIRE | 8/21/2017 | 8/21/2017 | 8/23/2017 | | PASS |
Scott Arellano
|
|
|
See plan review comments under BLD17-00954
|
Routing - Erosion and Sediment | 4/14/2017 | | 8/23/2017 | | PASS |
Andy J. Long
|
|
|
SWPPP/ESC plan submitted with main site grading permit GRD17-00006 and ESC17-00078. This permit covers apartment building B.
|
Routing PW Sewer Design | 4/14/2017 | | 8/23/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Solid Waste | 4/14/2017 | | 8/21/2017 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLANNING | 4/14/2017 | | 8/21/2017 | | PASS |
Susan Riggs
|
|
|
|
Routing - PLAN CHECK | 4/14/2017 | | 8/21/2017 | | PASS |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 4/14/2017 | | 8/18/2017 | | PASS |
Julie Romig
|
|
|
|
Routing - MECHANICAL | 4/14/2017 | | 8/9/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Street Lights | 4/14/2017 | | 8/9/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 4/14/2017 | | 8/9/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 4/14/2017 | | 7/24/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 4/14/2017 | | 7/24/2017 | | PASS |
Andrea Tuning
|
|
|
|
1st review completed | | | 6/23/2017 | | |
Julie Romig
|
|
|
|
Routing - PLANNING Land Div | 4/14/2017 | | 4/17/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 4/14/2017 | | 4/17/2017 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 4/10/2017 | | PASS |
Carl D Madsen
|
|
|
|
First Notice | | 9/2/2019 | | | |
|
|
|
|
First Notice | 8/22/2019 | 8/22/2019 | | | |
Brandon Shaw
|
|
|
|
Application received | | 4/7/2017 | | | |
|
|
|
|
Routing - Design Review | 3/7/2018 | | | | FAIL |
Katelyn Menuge
|
|
|
Plan Mod
|