Telephone call | | | 1/6/2020 | | DONE |
|
|
|
Spoke with John about final values. He added the values for all 3 permits onto the final values submitted for carports. I have added another notice activity so he can do it online. I have deleted the final value that was done in Octover to start over
|
Print Statement | | | 12/26/2019 | | DONE |
|
|
|
|
Telephone call | | | 11/29/2019 | | DONE |
|
|
|
12/04/19 left a message for John to call us to clarify the final values that were submitted, because it is too high so he could be given a value for all the permits on this address // 12-03-19 called and left message to GC to clarify the Final Value that was submitted per Brittany it needs to be verify cause it went up a lot// 11-29-19 sent an email to John to informed him that this permit is for the carports only and it did not required any electrical (the value for the electrical applied to BLD17-00954) I also emailed him the final fees
|
Print Statement | | | 11/29/2019 | | DONE |
|
|
|
|
Print Statement | | | 10/25/2019 | | DONE |
|
|
|
|
Telephone call | | | 10/25/2019 | | DONE |
|
|
|
sent email to clarify the value submitted on the Electrical- there was not electrical needed but he provided a value. please see doc-final value
|
Telephone call | | | 10/24/2019 | | |
|
|
|
left message for John Wyman to get clarification on the Final Values he submitted for this- because there is no Electrical needed per Review and he submitted a $136,500 value but he may be confusing this project with the aptments because this says is for carport. I have copied the FNL Value doc that he submitted to DOC
|
Third Notice | | 8/18/2019 | 9/19/2019 | | DONE |
|
|
|
mailed 9-20-19
|
Third Notice | | 7/15/2019 | 8/13/2019 | | DONE |
|
|
|
mailed 8-13
|
Second Notice | | 6/20/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11
|
First Notice | 5/31/2019 | 5/31/2019 | 6/10/2019 | | DONE |
Dave Hannah
|
|
|
mailed 6-11
|
BLD-Final | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Dave Hannah
|
|
|
John- Phone #: ###-####
|
DOC - Permit Finaled | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Dave Hannah
|
|
|
|
Zoning Approval | 5/30/2019 | 5/30/2019 | 5/30/2019 | | PASS |
Katelyn Menuge
|
|
|
|
FIRE-Final Inspection | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for this scope of work complete.
John Phone #: ###-####
|
Inspection Record Card- Bld | | | 3/25/2019 | | DONE |
|
|
|
|
BLD-Aging Inspection | 1/25/2019 | 1/25/2019 | 1/28/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/24/2019 | 1/24/2019 | 1/28/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Footing | 9/11/2018 | 9/12/2018 | 9/12/2018 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
Routing - PLUMBING | 8/6/2018 | | 8/6/2018 | | PASS |
Bill VanDegrift
|
|
|
public works approved the floor drain location.
|
BLD-Aging Inspection | 7/16/2018 | 7/16/2018 | 7/17/2018 | | PEND |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 8/30/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/30/2017 | | DONE |
Christina Prado
|
|
|
|
Route to Impact Fee Review | 8/21/2017 | 8/24/2017 | 8/24/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (JAR) | 4/14/2017 | 8/21/2017 | 8/24/2017 | | DONE |
Julie Romig
|
|
|
**Warm Spirngs Carports
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/24/2017 | | DONE |
Christina Prado
|
|
|
Need:
ACHD - MET
GC Form - MET
Revised Certificate of Value - MET
DO NOT ISSUE WITHOUT BLD17-00954 & BLD17-02955
|
Routing - FIRE | 8/21/2017 | 8/21/2017 | 8/23/2017 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing PW Sewer Design | 4/14/2017 | | 8/23/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - Erosion and Sediment | 4/14/2017 | | 8/23/2017 | | PASS |
Andy J. Long
|
|
|
No ESC permit required for carports. Carport installation will be inspected under main site permit ESC17-00078. 3 total ESC permits for project : main site permit with GRD, and two apartment building permits (ESC17-00392 & ESC17-01135)
|
Routing - PLAN CHECK | 4/14/2017 | | 8/21/2017 | | PASS |
Julie Romig
|
|
|
|
Routing - PLANNING | 4/14/2017 | | 8/21/2017 | | PASS |
Susan Riggs
|
|
|
|
Routing PW Solid Waste | 4/14/2017 | | 8/21/2017 | | PASS |
Evan Carpenter
|
|
|
|
Routing Off Site - STRUCTURAL | 4/14/2017 | | 8/18/2017 | | PASS |
Julie Romig
|
|
|
|
Routing - PLANNING Land Div | 4/14/2017 | | 8/9/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Street Lights | 4/14/2017 | | 8/9/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 4/14/2017 | | 8/9/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 4/14/2017 | | 7/24/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 4/14/2017 | | 7/24/2017 | | PASS |
Andrea Tuning
|
|
|
|
1st review completed | | | 6/23/2017 | | DONE |
Julie Romig
|
|
|
|
Routing - Addressing | 4/14/2017 | | 4/17/2017 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 4/10/2017 | | PASS |
Carl D Madsen
|
|
|
|
Application received | | 4/7/2017 | | | |
|
|
|
|