BLD-Final | 3/22/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Becky Granden
|
DOC - Permit Finaled | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 11/2/2018 | 11/2/2018 | 11/8/2018 | | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 11/8/2018 | 11/8/2018 | 11/8/2018 | P | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 8/30/2018 | 8/31/2018 | 8/31/2018 | P | DONE |
Brandon Shaw
|
|
|
Hey Jim, As we are getting closer to our final inspection we would like for you to give us an idea of what you will be looking to inspect vs potential finish/cosmetic work. Thanks! Phone #: ###-#### Inspection requested via web by Becky Granden
|
BLD-Framing/Rough-in | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Jim Sly
|
|
|
Hi Jim, We are finally ready for our framing inspection! I will be meeting you before I go into work so if you could make us one of your first stops it would be greatly appreciated !
Thanks, Becky Granden Phone #: ###-#### Inspection requested via web by Becky Granden Frame and Energy.....OK.
|
BLD-Conference | 6/20/2018 | 6/21/2018 | 6/20/2018 | A | CANC |
Jim Sly
|
|
|
Hi Jim,
We are finally ready for our framing inspection!
I will meet you before I go into work so if we could be one of your first stops it would be greatly appreciated!
Thanks,
Becky Granden Phone #: ###-#### >> Inspection requested via web by Becky Granden Inspection cancelled from web by: Becky Granden
|
BLD - Request for Extension | 4/25/2018 | 4/25/2018 | 4/25/2018 | P | PASS |
Jim Sly
|
|
|
Becky Phone #: ###-####
|
BLD-Aging Inspection | 4/10/2018 | 4/10/2018 | 4/11/2018 | | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | DONE |
Jim Sly
|
|
|
WIP.
|
BLD-Wall Bracing | 11/27/2017 | 11/27/2017 | 11/27/2017 | A | PASS |
Brandon Shaw
|
|
|
Strapping, hold downs, and clips in place
|
BLD-Framing/Rough-in | 11/26/2017 | 11/27/2017 | 11/27/2017 | A | CANC |
Brandon Shaw
|
|
|
Hi Jim,
We’re ready for a framing inspection.
Thanks, Luke Granden Phone #: ###-#### Inspection requested via web by Becky Granden
|
BLD-Framing/Rough-in | 11/19/2017 | 11/20/2017 | 11/20/2017 | A | NR |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Becky Granden Call for Wall Bracing inspection.
|
BLD-Conference | 10/18/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Jim Sly
|
|
|
Can we please get a foundation stem wall inspection Thursday morning? Thanks! Phone #: ###-#### Inspection requested via web by Becky Granden
|
BLD-Conference | 10/13/2017 | 10/16/2017 | 10/16/2017 | A | PASS |
Jim Sly
|
|
|
Can we please get an inspection for the foundation footing first thing Monday morning? Thanks! Phone #: ###-#### Inspection requested via web by Becky Granden FOOTING.....OK.
|
OVERRIDE | | | 10/10/2017 | | |
|
|
|
|
Route to Impact Fee Review | 10/9/2017 | 10/12/2017 | 10/10/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Inspection Record Card- Bld | | | 10/10/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/10/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/10/2017 | | DONE |
|
|
|
plan mod, do not reissue
|
Routing - PUBLIC WORKS | 10/9/2017 | | 10/10/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 10/9/2017 | | 10/10/2017 | | PASS |
Doug Chausow
|
|
|
|
Plan assigned to (BJM) | 10/9/2017 | 10/9/2017 | 10/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/9/2017 | | 10/9/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2017 | | DONE |
Brian McGowan
|
|
|
|
CHANGE STATUS TO (REV) | | | 10/9/2017 | | DONE |
|
|
|
routed to PW per their request
|
Plan Modification Accepted | | | 10/9/2017 | | DONE |
|
|
|
plan mod to completely demolish existing home and rebuild new 720 sq.ft. dwelling.
|
OVERRIDE | | | 10/4/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 10/2/2017 | 10/2/2017 | 10/4/2017 | | DONE |
Brian McGowan
|
|
|
Plan Mod (BJM)
|
Routing - PLAN CHECK | 10/2/2017 | | 10/4/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/4/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/4/2017 | | |
Christina Prado
|
|
|
Plan Mod approved - DO NOT RE-ISSUE PERMIT
|
Telephone call | | | 10/4/2017 | | DONE |
Christina Prado
|
|
|
Called Rebecca to advise plan mod is ready and gave fee due
|
CHANGE STATUS TO (ISS) | | | 10/4/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/4/2017 | | DONE |
|
|
|
|
BLD-Conference | 10/2/2017 | 10/3/2017 | 10/3/2017 | A | DONE |
Jim Sly
|
|
|
Luke Phone #: ###-####
|
Routing Walk-In (BLD) | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Josh Bogle
|
|
|
|
Plan Modification Accepted | | | 10/2/2017 | | DONE |
Christina Prado
|
|
|
Plan mod to rebuild outside wall
|
OVERRIDE | | | 8/21/2017 | | |
|
|
|
|
Routing Walk-In (Zoning) | 8/21/2017 | 8/21/2017 | 8/21/2017 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 8/21/2017 | 8/21/2017 | 8/21/2017 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 8/21/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/21/2017 | | 8/21/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/21/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 8/21/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/21/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/21/2017 | | DONE |
|
|
|
|
Application received | | 8/21/2017 | | | |
|
|
|
|