BLD-Final | 8/3/2018 | 8/6/2018 | 8/6/2018 | A | PASS |
Brandon Shaw
|
|
|
Micheal Phone #: ###-####
|
DOC - Permit Finaled | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PART |
Tony Young
|
|
|
Please call ahead for access - Mike Phone #: ###-####,, needs tempered glass,, hand rail to unfinished basement, etc.,, ok to move house hold items in
|
Zoning Approval | 6/26/2018 | 6/26/2018 | 6/26/2018 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Conference | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | PART |
Tony Young
|
|
|
Michael Phone #: ###-####,, stair/handrail ?s
|
BLD-Energy code compliance | 3/20/2018 | 3/20/2018 | 3/20/2018 | P | PASS |
Dave Hannah
|
|
|
Michael Phone #: ###-####
|
BLD-Framing/Rough-in | 3/15/2018 | 3/15/2018 | 3/15/2018 | P | PART |
Tony Young
|
|
|
Michael Phone #: ###-####,, needs fire placed passed,, see paint notes for corrections,, ok to insulate
|
BLD-Conference | 3/12/2018 | 3/13/2018 | 3/13/2018 | A | PASS |
Tony Young
|
|
|
call when on way // Michael Phone #: ###-####,, stair ?s,, ok
|
Plan Modification Accepted | | | 2/21/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 2/21/2018 | | 2/21/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Garage
Hold downs, at house and garage, to be installed before framing inspection
|
BLD-Conference | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | DONE |
Dave Hannah
|
|
|
Michael Phone #: ###-#### or Brad ###-####
|
BLD-Wall Bracing | 1/31/2018 | 1/31/2018 | 1/31/2018 | P | PART |
Tony Young
|
|
|
Michael Phone #: ###-####,, need to see hold downs at frame inspection,, house exterior ok to cover
|
BLD-Wall Bracing | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | NR |
Tony Young
|
|
|
Michael Phone #: ###-####
|
BLD-Wall Bracing | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | NR |
Tony Young
|
|
|
Michael Phone #: ###-####
|
BLD-Foundation | 12/21/2017 | 12/21/2017 | 12/21/2017 | P | PASS |
Tony Young
|
|
|
Ryan-pour time 4:00 Phone #: ###-####
|
BLD-Footing | 12/19/2017 | 12/19/2017 | 12/19/2017 | P | PART |
Tony Young
|
|
|
Ryan Phone #: ###-####,, garage,, 3pm,, made 22' back up space,, per surveyer,, alley is 13.6'
|
BLD-Footing | 12/18/2017 | 12/19/2017 | 12/19/2017 | A | NR |
Tony Young
|
|
|
Ryan Phone #: ###-####
|
BLD-Foundation | 11/14/2017 | 11/14/2017 | 11/14/2017 | P | PART |
Tony Young
|
|
|
Ryan Phone #: ###-####,, basement wall,, work in progress
|
BLD-Footing | 11/8/2017 | 11/9/2017 | 11/9/2017 | A | PART |
Tony Young
|
|
|
Ryan Phone #: ###-####,, basement footings ok
|
Issue PAID IN FULL permit | | | 10/25/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/25/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/12/2017 | | |
|
|
|
|
Plan assigned to (JG) | 9/29/2017 | 9/29/2017 | 10/12/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 9/11 sfd L1 ePlan pend DR
|
Routing - Design Review | 10/11/2017 | | 10/12/2017 | | PASS |
Ted Vanegas
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/12/2017 | | DONE |
|
|
|
Need
RP
|
Routing - PLAN CHECK | 10/11/2017 | | 10/11/2017 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 10/2/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 8/29/2017 | | 10/2/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLANNING | 8/29/2017 | | 10/2/2017 | | CANC |
Colleen T Carroll
|
|
|
Per ePlan Front Desk Planning Colleen Carroll No review required
|
Plan assigned to (BJM) | 8/29/2017 | 8/29/2017 | 9/29/2017 | | DEFR |
Brian McGowan
|
|
|
9/11 sfd L1 ePlan
|
Route to Impact Fee Review | 8/29/2017 | 9/1/2017 | 8/30/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing Walk-In (Zoning) | 8/30/2017 | 8/30/2017 | 8/30/2017 | P | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 8/30/2017 | 8/30/2017 | 8/30/2017 | P | FAIL |
Josh Bogle
|
|
|
no contact with applicant
|
Routing - Addressing | 8/29/2017 | | 8/29/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/29/2017 | | 8/29/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 8/29/2017 | | 8/29/2017 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/29/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/29/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/29/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 8/22/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 22 2017 9:21AM
|
Intake Approval | | | 8/22/2017 | | FAIL |
Christina Prado
|
|
|
Need landscape plans uploaded, stair section, smoke/co locations, stairway lighting and ADU application
|