BLD-Final | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | PASS |
Jim Sly
|
|
|
Saki Phone #: ###-####
|
DOC - Permit Finaled | 9/11/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | NR |
Mike Jordan
|
|
|
Saki Phone #: ###-####
|
BLD-Framing/Rough-in | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | PASS |
Jim Sly
|
|
|
Saki- porch Phone #: ###-####
|
BLD-Framing/Rough-in | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | PASS |
Jim Sly
|
|
|
Saki-would like as late as possible Phone #: ###-####
|
BLD-Wall Bracing | 11/17/2017 | 11/17/2017 | 11/17/2017 | P | PASS |
Jim Sly
|
|
|
Saki Phone #: ###-####
|
BLD-Footing | 11/1/2017 | 11/2/2017 | 11/2/2017 | A | PASS |
Jim Sly
|
|
|
Saki Phone #: ###-#### Front Porch.
|
Routing Walk-In (Zoning) | 10/25/2017 | 10/25/2017 | 10/25/2017 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 10/25/2017 | 10/25/2017 | 10/25/2017 | A | PASS |
Josh Bogle
|
|
|
modification, easy, no fee, front stoop JAB
|
BLD-Foundation | 9/13/2017 | 9/14/2017 | 9/14/2017 | P | PASS |
Jim Sly
|
|
|
Senad Phone #: ###-####
|
OVERRIDE | | | 9/14/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/14/2017 | 9/14/2017 | 9/14/2017 | A | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/14/2017 | | 9/14/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/14/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 9/14/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/14/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/14/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/14/2017 | | DONE |
|
|
|
|
BLD-Foundation | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | PART |
Jim Sly
|
|
|
Saki Phone #: ###-#### Footing.....OK.
|
OVERRIDE | | | 8/24/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/24/2017 | 8/24/2017 | 8/24/2017 | A | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/24/2017 | | 8/24/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/24/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 8/24/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/24/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/24/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 8/22/2017 | 8/22/2017 | 8/22/2017 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 8/22/2017 | 8/22/2017 | 8/22/2017 | A | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 8/22/2017 | | FAIL |
Brian McGowan
|
|
|
Need foundation drawing, existing floor plan, truss layout with wall bracing and headers called out.
|
Routing - PLAN CHECK | 8/22/2017 | | 8/22/2017 | | FAIL |
Brian McGowan
|
|
|
Need foundation drawing, existing floor plan, truss layout with wall bracing and headers called out.
|
Application received | | 8/22/2017 | | | |
|
|
|
|