BLD-Energy code compliance | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/26/2017 | 10/27/2017 | 10/27/2017 | A | PASS |
Dave Hannah
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 10/18/2017 | 10/19/2017 | 10/19/2017 | P | DONE |
Dave Hannah
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 10/16/2017 | 10/17/2017 | 10/17/2017 | A | PASS |
Dave Hannah
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 10/9/2017 | 10/10/2017 | 10/10/2017 | A | NR |
Dave Hannah
|
|
|
Call to meet // David Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/28/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/25/2017 | | 8/25/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/25/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 8/25/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/25/2017 | | |
Christina Prado
|
|
|
Need GC form for issuance.
Home has been purchsed, previous owner NC Assetd Inc - Need to verify new ownership with deed and get GC form for issuance
|
Routing Walk-In (BLD) | 8/22/2017 | 8/22/2017 | 8/22/2017 | P | FAIL |
Brian McGowan
|
|
|
Need as is floor plan and need beam/header sizes for proposed modifications.
|
1st review completed | | | 8/22/2017 | | FAIL |
Brian McGowan
|
|
|
Need as is floor plan and need beam/header sizes for proposed modifications.
|
Routing - PLAN CHECK | 8/22/2017 | | 8/22/2017 | | FAIL |
Brian McGowan
|
|
|
Need as is floor plan and need beam/header sizes for proposed modifications.
|
Application received | | 8/22/2017 | | | |
|
|
|
|